Jira vs OpenProject

Jira and OpenProject both cover agile boards, Gantt planning, time tracking and permissions, but they differ in hosting, licensing and migration routes. This page helps you decide whether OpenProject covers how your team uses Jira.

On this page

Jira vs OpenProject: when each option fits your team

Choose Jira when Atlassian hosting and its app ecosystem fit how your organization works, and choose OpenProject when project data must stay on your own servers and your delivery process maps well to its work package model. Renewal dates, Data Center end of life and residency or lock-in pressure usually force the question, but the answer depends on what your teams actually do in Jira day to day. Atlassian's published timeline ends new Data Center subscriptions for new customers on March 30, 2026 and makes Data Center licenses read-only on March 28, 2029, so a self-hosted plan should be sized against that date, not against the next invoice.

Start with the features your teams rely on. List the boards, sprint reports, custom workflows, dashboards, Gantt-style planning and time tracking that people use every week, then check each against OpenProject's Community edition, which includes work packages, Gantt charts, agile boards, time tracking and dashboards. Next, confirm your Jira edition and version, because the Jira Migrator in OpenProject is in beta and supports only Jira Data Center 10.x and 11.x, not Jira Cloud. Also inventory Jira Apps and Assets. Third-party apps and Assets do not carry over through the cloud backup, and any app-dependent process will need an equivalent or a manual rebuild, so confirm that with each app vendor before you commit.

Finally, decide whether you need SSO, LDAP synchronization or SCIM provisioning. OpenProject lists single sign-on (SAML, OIDC, CAS, Kerberos, Okta), LDAP group synchronization and custom branding as Enterprise features, and SCIM provisioning and portfolio and resource management sit in paid Enterprise plans. If your identity provider must drive access, budget for an Enterprise plan from the start and ask the vendor to confirm which tier includes each feature you need. Plan the decision as a written scope with named owners for workflows, permissions and cutover, so the comparison ends in a clear fit or a clear gap.

Which option fits which scenario

This table matches common Jira buyer situations to the option that fits best and the fact that drives the choice. Read it as a starting point: each row turns on dates, plan tiers or import limits that you should confirm against your own environment and the vendors' current documents before you commit.

Buyer situationBetter fitReason
Jira Data Center renewal that must end before the platform goes read-onlyOpenProject, with a migration planAtlassian ends new Data Center subscriptions for new customers on March 30, 2026 and expansions for existing customers after March 30, 2028, so a renewal now should be planned around a fixed exit date. OpenProject's Jira Migrator can read Data Center 10.x and 11.x, but it is beta, so plan a test run first.
Jira Data Center team that needs to move soon and wants a supported importConfirm before choosing; check your versionThe OpenProject Jira Migrator only reads Data Center 10.x and 11.x and is marked beta. If your instance is on another version, ask both OpenProject and Plane which importer paths they support for it.
Jira Cloud team with heavy automation rulesPlane or OpenProject, with rules rebuilt by handJira Cloud backup does not include automation rules, third-party apps or Assets, so the rules must be documented and rebuilt in the target tool. Neither OpenProject nor Plane should be assumed to run your rule logic without a separate check.
Jira Cloud team that needs Gantt planning and a small set of agile boardsOpenProjectThe Community edition includes work packages, Gantt charts, agile boards and time tracking at no license cost. Confirm that your board and sprint setup maps cleanly before migrating.
Team that needs SSO, LDAP group sync or SCIM provisioningOpenProject Enterprise, on-premisesOpenProject lists SSO, LDAP group synchronization and custom branding as Enterprise features, and the Jira Migrator is also listed under Enterprise plans from Basic upward. Community alone will not cover these needs.
Regulated team that must keep all project data on its own serversOpenProject or Plane self-hosted, with the vendor's edition confirmedBoth can run in your own infrastructure. Confirm which edition includes the features your assessors ask about, since paid self-hosted tiers differ between vendors.
Team that depends on Jira portfolio roadmaps across many teamsOpenProject Enterprise or a separate planning reviewPortfolio and resource management sit in paid OpenProject Enterprise plans. Confirm that the features you rely on in Jira Premium or Enterprise are covered before deciding.
Team with a small, stable workflow and low admin capacityOpenProject Community, self-runThe Community edition is free to license and needs a Docker or package install. Budget for the staff who will patch and back it up, since support is community-only.

How the core Jira features map to OpenProject

OpenProject Community includes agile boards on top of work packages, so teams can plan iterations and move cards through status columns without a paid edition. The model differs from Jira's, though. Jira's sprints are a first-class object with their own burndown and velocity views, while OpenProject's board and sprint behavior depends on how you structure work packages, versions and status columns. Confirm each Jira board pattern against the OpenProject board options in your release before you assume a direct match.

  • Board types: Check whether your Scrum and Kanban boards map to OpenProject board views, including swimlanes and filters you rely on daily.
  • Sprint equivalent: Test how a Jira sprint maps to an OpenProject version or sprint-like grouping, and whether carry-over of unfinished items works the way your team expects.
  • Workflow states: Compare your Jira workflow statuses and transitions with OpenProject statuses, and note any transition rules that enforce required fields.
  • Reporting: Confirm which burndown, velocity or cumulative flow views your managers use and whether dashboards in Community cover them.
  • Work item types: Map Jira issue types, such as epics, stories and bugs, to OpenProject work package types before you rebuild any board.

Test one real Scrum board end to end, including a sprint close, before deciding that the boards cover your process.

Capability comparison: Jira and OpenProject

This table compares how Jira and OpenProject cover the capabilities most Jira teams depend on, from boards and Gantt planning to licensing, hosting and migration. Where a feature depends on edition, plan or Jira deployment type, the cell says so and names what to confirm with the vendor. The main takeaway is that OpenProject's free Community edition covers core planning, while single sign-on, LDAP and SCIM provisioning, portfolio features and the Jira importer depend on your Jira deployment and on paid Enterprise plans.

CapabilityJiraOpenProject
Agile boards and sprintsScrum and kanban boards with sprints in Jira Software. Confirm the board and sprint features your plan includes.Agile boards are in the free Community edition. Check that sprint handling matches your current Scrum or kanban workflow.
Roadmaps and Gantt planningRoadmaps are available, but advanced cross-team roadmaps depend on your Jira plan. Confirm the tier.Gantt charts are in Community. Portfolio and program planning sits in paid Enterprise plans.
Time tracking and dashboardsTime tracking and dashboards depend on Jira configuration and any marketplace add-ons. Confirm which fields you use today.Time tracking and dashboards are included in the Community edition, with community support.
Permissions and identityPermission schemes control projects. Confirm which SSO option your Jira plan and deployment provide.SSO (SAML, OIDC, CAS, Kerberos, Okta), LDAP group synchronization and SCIM provisioning are Enterprise features.
LicensingAtlassian commercial subscriptions. Data Center ends for new customers on March 30, 2026.GPL-3.0 with a free Community edition. Enterprise is priced per named user per month (OpenProject pricing page).
Hosting optionsAtlassian Cloud or Data Center. Data Center licenses become read-only on March 28, 2029.Docker (recommended), .deb and .rpm packages for 64-bit Linux, and Kubernetes with Helm charts. Enterprise cloud is also offered.
Jira migration supportSource system for the migration. Confirm your exact Jira type and version before planning.Jira Migrator is in beta and supports Jira Data Center 10.x and 11.x only. It does not support Jira Cloud.
Backup and exportJira Cloud backup covers work items, boards, sprints, comments, users and configuration, but not automations, apps or Assets.Confirm the export options for your edition. On your own servers, you own database and attachment backups.

Where your project data lives and who controls it

Moving from Jira to OpenProject changes where project data sits, who operates the platform and who answers for backups and access. The cards below cover each of those decisions so you can compare Jira Cloud with a self-hosted OpenProject deployment on your own terms.

Data location and residency

Jira Cloud stores your work items, boards and configuration in Atlassian's hosting, and data residency options depend on your Atlassian plan and region. With self-hosted OpenProject, the database, attachments and logs sit wherever you install them, whether in your own data center, a private cloud account or an EU provider. Confirm the residency terms for your current Atlassian contract with Atlassian and your legal team, and document where each OpenProject component runs, including the PostgreSQL database and file storage.

Hosting model choice

OpenProject offers Docker-based installation, which the project recommends, .deb and .rpm packages for 64-bit Linux, and Kubernetes with Helm charts for horizontal scaling. Enterprise cloud is the alternative if you want OpenProject operated for you. Your choice sets who patches the operating system, runs upgrades and handles failover, so decide it before scoping the migration. Ask your platform team which model matches the skills and change process they already run.

Identity and single sign-on

In Jira Cloud, sign-in and user lifecycle are often managed through Atlassian Access or your identity provider. In OpenProject, single sign-on with SAML, OIDC, CAS, Kerberos or Okta, LDAP group synchronization and SCIM provisioning sit in paid Enterprise plans, while the Community edition is free without them. Map which of your users, groups and project roles depend on identity sync, then price those features against the Enterprise tier before you commit to a design.

Backup responsibility

Atlassian's backup for cloud covers work items, board and sprint data, comments, users and project configuration such as workflows and schemes. It does not cover automation rules, third-party apps or Assets, so those need separate records. With OpenProject, backup of the database, attachments and configuration is your job, and nothing is restored unless you have tested it. Set a written backup schedule, store copies outside the production host, and rehearse a restore before the Jira cutover.

Upgrades and version control

OpenProject publishes regular releases, including 17.9.0 on September 30, 2026 and 17.9.2 on October 15, 2026, so your team owns the patch cadence once it hosts the platform. Jira Cloud updates are applied by Atlassian on its schedule. Decide who tracks security advisories, who tests each release in staging and how long you can run an older version. Check the release notes before every upgrade, because schema changes and PostgreSQL requirements can affect the database.

Compliance evidence and readiness

Auditors will ask for evidence that access, change and backup controls work, and that data stays where your policy says. DeployOpen can plan and document these controls, configure logging and access review, and prepare the evidence your auditors request. DeployOpen does not issue audit reports, attestations or certifications; independent auditors and certification bodies do that work. Ask your auditor which artifacts they need from the OpenProject environment before the design is frozen.

What you pay for: Jira licensing versus self-hosted OpenProject

The Jira side of the bill is a recurring subscription or Data Center license, plus the administration time that supports it. Confirm with Atlassian the billing unit that applies to your deployment, the user count it covers, and whether add-ons such as Assets or marketplace apps are billed separately. Timing matters as much as price. Atlassian ends new Data Center subscriptions for new customers on March 30, 2026, stops licenses and expansions for existing customers after March 30, 2028, and Data Center licenses become read-only on March 28, 2029. Map your renewal calendar against those dates before you compare any figures.

The OpenProject Community edition is free under GPL-3.0 and includes work packages, Gantt charts, agile boards, time tracking and dashboards, with community support. The paid route is Enterprise on-premises, priced per named user per month: Basic at 5.95 euros, Professional at 10.95 euros with a 25-user minimum, Premium at 15.95 euros with a 100-user minimum, and Corporate on request for 250 or more users. Illustrative: a 40-user team on Professional would pay 40 × 10.95 = 438 euros per month before tax. SSO, LDAP group synchronization and the Jira Migrator sit in Enterprise plans from Basic upward, so a team that needs single sign-on pays from Basic. Check current prices on the OpenProject pricing page.

The license is only one line. Self-hosting adds servers, storage, PostgreSQL 16 or later with the pg_trgm, btree_gist and unaccent extensions, and the staff who run them. OpenProject's sizing guide suggests 4 cores and 4 GB RAM for up to 200 users, which is a starting input for the infrastructure quote, not a capacity guarantee. Recurring costs include patching, backups with tested restores, and upgrades; OpenProject 17.7.0, 17.8.0 and 17.9.0 shipped between August and September 2026, so plan for regular maintenance time. One-time costs include migration, rebuilding workflows and permissions, and training. Ask any provider for a written quote that itemizes license tier and user count, hosting, storage, database administration hours, support hours, migration scope, and whether upgrades are covered by a retainer.

What a move from Jira to OpenProject involves

The sequence turns Jira projects, workflows and permissions into a tested OpenProject instance, with each step closed by a written check that teams and approvers can sign off before Jira access is retired.

  1. Inventory projects, workflows and integrations

    Your team, with your Jira administrators, lists every project, board, workflow, permission scheme, custom field, issue type, automation rule, installed app and integration that people depend on. Record which Jira edition and version you run, since that decides the migration route. Also record which data sits outside the standard export, such as automation rules, third-party app data and Assets, because those need separate handling. The step is done when the inventory is signed off by the project owners and the Jira administrators, and every item is marked as migrate, rebuild or retire.

  2. Choose the migration route

    Confirm the route before any build work. If you run Jira Data Center 10.x or 11.x, OpenProject's Jira Migrator can be evaluated, but its documentation is beta and recommends test setups only, and it is listed under OpenProject Enterprise plans from Basic upward. If you use Jira Cloud, the Migrator does not apply, so plan a CSV-based import with manual rebuilding of workflows, roles and boards. Ask the vendor and your implementation partner to confirm current support in writing. The step is done when the route, the edition you need and the owner of each decision are recorded in the written scope.

  3. Set up a test instance and PostgreSQL

    Your platform engineers deploy a non-production OpenProject instance in your own infrastructure, using the Docker-based installation the project recommends or a supported packaged install. Provision PostgreSQL 16 or later with the pg_trgm, btree_gist and unaccent extensions, as the system requirements specify. Size the host against the sizing guide for your user count, and set up backups and access logging from the start. The step is done when the test instance starts cleanly, the database extensions are confirmed, and a restore from backup has been tested.

  4. Run a trial migration and reconcile

    Run the migration against a copy of the Jira data in the test instance, not production. Compare record counts for projects, work items, comments, attachments, users, versions and custom fields against Jira. Document every field or history element that did not carry over, including anything outside the supported list. Your project owners then spot-check a sample of work items per project. The step is done when reconciliation reports are signed off and each gap has a recorded decision: accept, fix or rebuild by hand.

  5. Rebuild workflows, roles and permissions

    Recreate statuses, types, workflows, roles and project permissions in OpenProject to match the inventory, using the trial results to decide what can be reused and what must be redesigned. Map each Jira permission scheme to OpenProject roles and confirm who can see, edit and administer each project. Test the rebuilt configuration with a small set of named users from each team. The step is done when every project has a documented permission map that the security and project leads have reviewed, and test users confirm they can do their normal work and nothing more.

  6. Configure SSO and Enterprise features where needed

    If your identity provider must control sign-in, configure single sign-on in the Enterprise edition. OpenProject lists SAML, OIDC, CAS, Kerberos and Okta among its Enterprise features, and LDAP group synchronization is also an Enterprise feature. Check which of these your organization needs before buying a plan, because the pricing page lists them under paid editions. The step is done when test accounts sign in through the chosen method, group membership maps to the roles you rebuilt, and the Enterprise plan, if any, is confirmed against the written scope.

  7. Train teams and prepare the cutover

    Run short sessions for each team on the new boards, work package views, time tracking and permissions, and publish a one-page guide for the differences from Jira. Agree a cutover date, a freeze period for Jira edits, and a final delta migration for work changed after the trial. Decide who answers questions during the first weeks. The step is done when each team lead confirms their members have trained, the cutover plan is approved, and support contacts are named.

  8. Cut over and retire Jira access

    Run the final migration into production, repeat the reconciliation checks, and announce the switch to users. Make Jira read-only for migrated projects, keep an archived export under your retention policy, and remove integrations that pointed at Jira. Confirm that the backup and restore procedures work on the production instance. The step is done when production reconciliation is signed off, Jira is read-only for migrated projects, and the archive location and retention owner are documented. Sizing, timelines and effort depend on the scope, so agree them in a written scope before work starts.

Questions buyers ask before choosing OpenProject over Jira

How much effort does moving from Jira to OpenProject take?

The effort depends on the scope you define, not on a single fixed figure. The main drivers are the Jira deployment you are leaving, the number of projects and workflows, how many custom fields and permission schemes you rely on, and how many integrations must be rebuilt. OpenProject's Jira Migrator is in beta and imports projects, versions, issues with history, comments, attachments, basic custom fields, users, statuses and types. Workflows, permissions, automation rules and third-party app data are not on that list, so plan to rebuild them by hand and count that work in your estimate.

Can an internal team run OpenProject without outside help?

Yes, many teams do, provided they have someone comfortable with Linux, Docker or packaged installs, PostgreSQL and backups. OpenProject's Community edition is free and can be installed with Docker (recommended), .deb or .rpm packages, or Kubernetes with Helm charts. Ongoing work includes applying upgrades, monitoring the server, restoring backups and supporting users. Community edition support is community-based, so check whether your team needs a commercial support route, and confirm which paid features, such as SSO or LDAP synchronization, your identity model requires before you decide.

What does the work need from our side?

Most migrations need four things from the client. Name owners for each project, workflow decision and permission model, because someone must approve what the new setup should look like. Provide representative test data, ideally a copy from a non-production Jira Data Center instance, so the import and rebuilt workflows can be checked. Grant access to your identity provider if you need single sign-on or group synchronization. Budget server capacity: OpenProject's sizing guide suggests 4 cores and 4 GB RAM for up to 200 users, 8 cores and 8 GB for about 500 users, and 16 cores and 16 GB for about 1,500 users. Ask your infrastructure team to confirm these figures against your own load and availability needs.

How long does a move from Jira to OpenProject take?

No general duration can be stated reliably, because the timeline depends on the scope: the number of projects, the complexity of workflows and permissions, the source Jira version, the identity integration and how much history must be carried over. Ask for a written scope that lists each phase, its deliverables and the decisions that gate it. A good scope will also say which items are out of the timeline, such as automation rules and apps. Treat any single figure quoted without a scope as a starting point for discussion only.

Does the OpenProject Jira Migrator work for Jira Cloud?

No. The OpenProject Jira Migrator supports only Jira Data Center 10.x and 11.x and does not support Jira Cloud. It is also in beta, and the documentation advises using it only in test setups. If your data sits in Jira Cloud, you will need another route, such as exporting data from Jira Cloud and rebuilding or importing it through a different process. Confirm the current migrator version limits and cloud support in the OpenProject Jira migration documentation before you plan around them.

What does a fixed-scope engagement from DeployOpen cover?

DeployOpen plans, implements, customizes, integrates, hardens, backs up, upgrades, documents and supports self-hosted open-source platforms inside your own cloud accounts, data centers or air-gapped networks. For an OpenProject move, a fixed-scope engagement typically covers the agreed deployment, the data migration you scope, rebuilt workflows and permissions, integration work, documentation and handover. Scope, deliverables and timelines are agreed in writing before work starts, and a quote follows from that written scope. DeployOpen does not publish a price list and does not issue audit reports or certifications. Ongoing support, upgrades and testing are available as retainers.

Which OpenProject features need a paid Enterprise plan?

The Community edition is free and includes work packages, Gantt charts, agile boards, time tracking and dashboards. SSO, LDAP synchronization, SCIM provisioning, portfolio and resource management, and the Jira Migrator sit in paid Enterprise plans. OpenProject lists single sign-on through SAML, OIDC, CAS, Kerberos and Okta, plus LDAP group synchronization and custom branding, among its Enterprise features. Enterprise on-premises is priced per named user per month, with Basic at 5.95 euros and Professional at 10.95 euros with a 25-user minimum, and Premium at 15.95 euros with a 100-user minimum. Confirm current pricing on the OpenProject pricing page before budgeting.

How DeployOpen works on this

DeployOpen starts with a written scope that states which Jira workflows, boards, permissions and reports OpenProject must cover in your environment. We then plan, implement and document the self-hosted OpenProject deployment inside your own infrastructure, with engagements agreed as fixed-scope work before anything begins.

How we scope

  • Inventory which Jira boards, sprints, workflows and permission schemes your teams depend on today
  • Map each capability to OpenProject Community or Enterprise features and record the gaps in writing
  • Confirm your Jira deployment type, because the beta Jira Migrator supports only Data Center 10.x and 11.x
  • Agree deliverables and timelines in a written fixed scope before any implementation work starts

How we build

  • Plan hosting in your own cloud account, data center or air-gapped network, including PostgreSQL 16 or later with required extensions
  • Deploy OpenProject with Docker or packaged installs and size compute against your confirmed user count
  • Rebuild workflows, types, custom fields and roles, and test permissions with representative users
  • Run a trial migration in a test setup and check imported issues, comments, attachments and history

How we hand over

  • Document the architecture, configuration, role model and the decisions behind each gap or workaround
  • Provide a runbook for backups, upgrades and restore tests, so your team knows how to operate the platform
  • Walk administrators and project leads through boards, Gantt planning and time tracking in their own projects
  • Record which Enterprise features you licensed, such as SSO and LDAP synchronization, and why

How we support

  • Offer ongoing support, upgrades and continuous testing as a retainer after handover
  • Review each OpenProject release notes entry against your configuration before scheduling an upgrade
  • Confirm with your auditors which evidence they need, since DeployOpen prepares records but does not issue attestations
  • Scope retainer work in writing so support hours and responsibilities stay clear for both sides

Sources and further reading

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.