What changed in the TIBER-EU framework update and what it means for your test
A regulator, contract or DORA obligation now requires a threat-led test, and the January 2025 TIBER-EU framework changed how that test is run. The update aligned TIBER-EU process steps with the deliverables and strict timelines of the DORA TLPT standards, made purple teaming mandatory, renamed the White Team the Control Team, and allowed authorities to publish a short national implementation document instead of a full implementation guide. The practical effect depends on three things: whether your test has already entered a phase, which national programme applies to you, and which deliverables your authority still expects from you. Confirm each of these with your authority before you plan work, because the framework sets the common core while national documents add local rules.
The update does not change who owns what. Your organization owns its controls, its blue team and control team staffing, and the evidence it produces. The authority and its TIBER Cyber Team, through the test manager, direct the test and approve its steps. A test that started under an earlier version of the framework should be checked against the 2025 deliverables and timelines with the test manager, since the new guidance documents for the control team, purple teaming, scope specification and the remediation plan may set expectations that were not in place when the test was initiated. Ask the authority which version governs your test in writing.
For a test that is still in preparation, the changes mainly affect planning: the control team and purple teaming roles need named owners and budget from the start. For a test already in testing or closure, the most urgent item is the replay and purple teaming window, which the DORA TLPT standards set at no later than 10 weeks after active testing ends. Check with your provider and the authority how that window is scheduled. If you plan to rely on an outside provider, the ECB's updated guidance for service provider procurement explains how to assess provider quality, so use it as the basis for your questions and for the contract you sign.
Five changes in the 2025 framework and what each one asks of the tested entity
The January 2025 framework changed process steps, roles, deliverables and national documents. Each change lands on a different owner inside the tested entity, so the board, the control team lead, the blue team and the compliance function each need to know what moved.
Process steps aligned to DORA timelines
The 2025 update aligned the TIBER-EU process steps with the deliverables and strict timelines of the DORA TLPT standards. For the entity, the calendar is now fixed by the DORA technical standards rather than by a loose framework schedule. Compliance and the control team lead should map each deliverable to its deadline before the authority's notification arrives, and confirm with the test manager which timelines apply to their own test.
Mandatory purple teaming
Purple teaming is no longer optional under the 2025 framework. The red team and blue team sit down together after active testing to review what was attempted and what was detected. The blue team lead should plan the time for these joint sessions in the closure phase, and the control team should confirm that the detection and response staff who will attend are available within the required window.
Control Team replaces the White Team
The role formerly called the White Team is now the Control Team. The name change is simple, but the function is central: the control team manages the test on the entity's side, keeps risk under control during active testing and works with the test manager and providers. The entity should confirm in writing who sits on the control team, who holds the lead, and how it separates its members from the blue team that the test is measuring.
Guidance for each main deliverable
The ECB now publishes a guidance document for each main deliverable, including initiation documents, the scope specification, the targeted threat intelligence report, the red team test plan, the test reports, the remediation plan and the attestation. The entity's project lead should use these documents as the template for what each deliverable must contain and who signs it, and share them with providers during procurement so that drafts match what the authority expects.
Shorter national implementation documents
Authorities may now publish a short implementation document instead of a full national implementation guide. The entity should not assume that a shorter document means fewer rules. It should check the national document for any local requirements that still apply, such as authority fees, contact points or extra steps, and ask the national authority which document governs its test. Compliance should keep a dated record of the version the test was run under.
How the DORA TLPT deadlines reshaped the closure timeline
The closure phase now carries the strict timings that the DORA threat-led penetration testing standards impose, so an entity planning a TIBER-EU DORA TLPT alignment test should treat the closure dates as fixed constraints rather than targets. Under Delegated Regulation (EU) 2025/1190, Article 12(5) requires the replay and purple teaming to take place no later than 10 weeks after active testing ends. Active red team testing itself must run for at least 12 weeks. The remediation plan and the test summary report follow within 8 weeks of the authority's assessment. Together these periods leave little room for a closure phase that starts without a plan.
The 2025 update is the reason these periods now sit inside the TIBER-EU process itself. The ECB has stated that the core requirements of DORA TLPT and TIBER-EU are identical, so an entity that completes a test under a national or European TIBER-EU implementation meets the substance of the DORA requirement. That equivalence does not remove the formal layer. Your competent authority still sets the procedural requirements, such as notification steps, the form of the attestation and how results are submitted. Confirm those requirements with your authority in writing before the scope is agreed, and build the closure calendar from both sets of rules.
In practice, the work to prepare for the 10-week replay and purple teaming window starts long before the red team reports are finished. Ask your threat intelligence and red team providers to commit in writing to report delivery dates that leave time for the control team to run replay and purple teaming. Agree who in your organization owns each remediation action and how the 8-week clock will be tracked from the authority's assessment date. Budget for the internal blue team and control team hours these weeks require, because a missed window can delay attestation for the whole test.
How the 2025 changes affect each phase of a TIBER-EU test
The 2025 framework keeps the three TIBER-EU phases of preparation, testing and closure, and adds or clarifies guidance at each step. Read in order, the sequence shows which output closes each step, which guidance document governs it, and where the update adds a new requirement.
Issue written notification and initiation documents
The authority notifies the entity in writing, which starts the preparation phase, a period of up to six months. The entity and the TIBER Cyber Team then agree the initiation documents, for which the ECB published a guidance document with the 2025 framework. The step closes when both parties have signed off the initiation documents and the authority confirms that scoping can begin. Confirm with your authority which templates it uses and the format it expects.
Set up the control team
The 2025 update renamed the White Team the Control Team, so the role continues but carries the new name and its own guidance document. The control team supervises the test, manages risk during the exercise and works with the test manager on each approval. The step is done when the team members are confirmed, the risk management arrangements are documented, and the authority has accepted the team's composition.
Specify scope and procure providers
The scope specification document records the critical or important functions and the flags the red team will try to reach. The 2025 guidance for service provider procurement explains how to assess the quality of the threat intelligence provider and the red team testers. Procurement falls within the preparation phase, so it must finish inside the six-month window. The step closes with a signed scope specification and contracts that match the procurement guidance.
Produce the targeted threat intelligence report
The testing phase opens when the threat intelligence provider prepares targeted threat intelligence and selects the scenarios that the red team will use against the flags. The ECB guidance for the targeted threat intelligence report sets its content, and the control team and test manager review it before testing is planned. The 2025 alignment with the DORA deliverables and timelines applies here, so check the dates in your plan against the authority's timetable. The step closes when the report is approved.
Approve the test plan and run active testing
The red team writes a test plan for the chosen scenarios, and the ECB guidance for the red team test plan defines its content. The control team and test manager approve the plan before active testing starts. Active testing then runs for at least 12 weeks against the flags, under control team and test manager supervision, while the blue team defends the systems. The step closes when active testing ends, which starts the clock for replay and purple teaming.
Deliver the red and blue team test reports
The red team and the blue team each write a test report, and the ECB publishes a guidance document for each one. The red team report records the attack paths used and the flags reached, while the blue team report records what was detected, what was missed and how the response unfolded. The reports feed the replay and purple teaming that follows. The step closes when both reports are delivered to the control team and the test manager.
Hold mandatory replay and purple teaming
Purple teaming is a new mandatory step under the 2025 update, and Delegated Regulation (EU) 2025/1190 Article 12(5) requires replay and purple teaming no later than 10 weeks after active testing ends. Red and blue teams replay key attack paths together and agree improvements, while the control team tracks the timeline. The step closes when replay and purple teaming are complete and recorded within that 10-week window.
Issue summary report, remediation plan and attestation
The test summary report, remediation plan and attestation each have a guidance document under the 2025 framework. The remediation plan is due within 8 weeks of the authority's assessment, and 360 degree feedback from participants informs the summary. Confirm with your authority who signs the attestation. The step closes when the authority holds the summary report, has accepted the remediation plan, and the attestation is signed.
Which version of the framework applies to your test
This table shows which documents to check first for a test at each stage, from notification to closure. Read it by finding your current phase, then confirming in writing with the authority which national document and transition rules govern your test, because the facts supplied do not set out transition rules.
| Test situation | Check first | Confirm with the authority | Main risk of an outdated document |
|---|---|---|---|
| Preparation phase | The TIBER-EU Framework dated January 2025, the national implementation document and any national add-ons, then the guidance for initiation documents and scope specification | Which framework version governs the test and whether the purple teaming and Control Team requirements apply from the start | Scoping and procurement built on the older White Team model and missing the mandatory purple teaming step |
| Testing phase | The January 2025 framework, the red team test plan guidance and the targeted threat intelligence report guidance | Whether the threat intelligence and red team plan already approved remain valid under the updated framework or need revision | Red team plan or threat intelligence report that does not match current deliverable expectations, leading to rework |
| Closure phase | The January 2025 framework closure section, the red and blue team report guidance, the test summary report and attestation guidance | Which timing rules apply to replay and purple teaming and to the remediation plan, and how the authority counts the deadlines | Missing the replay and purple teaming window or preparing reports in a format the authority no longer expects |
| Test not yet notified | The January 2025 framework, the national implementation document for your jurisdiction, and the Delegated Regulation (EU) 2025/1190 if the test is a DORA TLPT | Whether your test is voluntary or mandatory, which national document applies and the current version of each guidance document | Planning against the 2018 framework or a superseded national guide and budgeting for a process that no longer applies |
| Jurisdiction with a recently updated national document | The national document version currently published, such as the latest TIBER-DE, TIBER-FR, TIBER-LU, TIBER-BE or TIBER-IT edition for your country | Whether national add-ons from earlier versions still apply or were removed in the update | Relying on a national guide that was revised after your planning started |
| Entity under DORA TLPT in a country with its own framework | The national implementation document and the authority's formal requirements for DORA TLPT | Which formal requirements the competent authority sets in addition to the shared core requirements | Assuming the TIBER-EU framework alone covers every DORA formal requirement |
How national programmes updated their documents after the 2025 framework
Some programmes responded to the 2025 framework by publishing new full national guides that set out how their tests run. These documents translate the common framework into the authority's own process, roles and contacts, so a tested entity reads them alongside the ECB framework rather than instead of it.
- TIBER-FR: The Banque de France, ACPR and AMF published version 2 of the TIBER-FR National Implementation Guide in March 2025.
- TIBER-BE: The National Bank of Belgium published a 2025 national implementation guide for TIBER-BE.
- Mandatory requirements still apply: A full guide adds national detail, but the framework's mandatory requirements, including purple teaming, remain in force.
- Local adaptations: Check which optional requirements the guide adapts, since these can differ from the ECB text.
- What to check: Confirm the current guide version on the national authority's website before planning, because a later revision may have replaced the one named here.
The 2025 framework allowed authorities to publish a short implementation document in place of a full national guide. Programmes that took this route point to the ECB framework for most process content and record only the national points that still need stating.
- TIBER-LU: The implementation document of Banque centrale du Luxembourg was updated on 20 June 2025.
- TIBER-IT: Banca d'Italia published version 2.0 of TIBER-IT on 11 December 2025.
- Less duplication: A short document relies on the ECB guidance for process steps, deliverables and timelines.
- National points still matter: Contacts, notification routes and any rules that add to the framework stay in the national text.
- What to check: Read the national document alongside the ECB framework, since a short document is only complete when both are applied together.
The Deutsche Bundesbank took a different position in TIBER-DE. Its implementation document, version 4.0 from July 2025, states that the framework's content now applies directly and fully to TIBER-DE tests, so national adaptation of test components is no longer necessary.
- Direct application: TIBER-DE tests follow the TIBER-EU content as published, without a parallel set of German test components.
- Version reference: The position is set out in version 4.0 of the TIBER-DE implementation document, dated July 2025.
- Practical effect: Teams reading TIBER-DE material should expect the ECB guidance documents to govern the detailed deliverables.
- Confirm the scope: Ask the Bundesbank how the position applies to each test type, including any tests run for DORA TLPT.
- What to check: Confirm that version 4.0 is still the current TIBER-DE document before relying on this position in a test plan.
Sweden's programme is being updated in a different context. In April 2026 the Riksbank said the TIBER-SE framework was being updated and that TIBER-SE will be used for DORA TLPT in Sweden. For entities that fall under Swedish supervision, this links the national programme directly to the regulatory testing duty.
- Update in progress: The Riksbank's April 2026 statement says the framework is being updated, so the final text may differ from earlier versions.
- DORA link: TIBER-SE will serve as the basis for DORA TLPT in Sweden, which makes the national document part of a regulatory obligation.
- Formal requirements: The competent authority sets the formal requirements that apply on top of the common content, so confirm them directly.
- Earlier versions: Documents published before the update may no longer reflect the current Swedish approach.
- What to check: Read the Riksbank's TIBER and DORA TLPT page and ask the authority for the current TIBER-SE text before scoping any test.
Which new guidance documents to read before each deliverable
Which TIBER-EU guidance should procurement read before choosing providers?
The procurement lead and the CISO should read the Guidance for Service Provider Procurement first, because it explains how to assess the quality of a threat intelligence or red team provider before a contract is signed. It informs which providers are shortlisted, what the contract must cover and which independence checks the test manager will later review. Read it alongside the TIBER-EU Framework (January 2025) so procurement and the test manager use the same definitions. The ECB states that the new guidance documents draw on practical experience from earlier TIBER tests, so the questions it poses reflect what worked and what did not in those tests. Keep the provider's written answers in the procurement file as evidence.
Who reads the initiation and scope specification guidance first?
The control team lead and the entity's risk owner should read the initiation documents guidance first, then the scope specification guidance. The initiation guidance informs the formal start with the authority, the people named to the control team and the risk management arrangements. The scope specification guidance informs which critical or important functions and flags enter the test. Scope decisions made here set the work for every later phase, so changes after approval are costly in time and effort. Ask the authority's test manager which format and level of detail they expect before drafting, because the guidance describes the content but local practice may add expectations.
What do the targeted threat intelligence and red team test plan guidance cover?
The threat intelligence provider reads the targeted threat intelligence report guidance first, and the red team lead reads the red team test plan guidance next. The threat intelligence guidance informs scenario selection, which determines the attack paths the red team will test against the flags. The red team test plan guidance informs how the red team sets out its approach before active testing begins, and the control team and test manager supervise that plan. Active red team testing must run for at least 12 weeks under this supervision. Confirm with the authority which version of each document applies to a test that started before the January 2025 update.
Who reads the control team and purple teaming guidance, and when is purple teaming due?
The control team lead and the blue team lead should read the control team guidance and the purple teaming guidance. The control team guidance informs how the control team is staffed, its role in supervising the test and how it handles the entity's own staff during the test. The purple teaming guidance informs how red and blue teams work together to review attack activity and improve detection. Purple teaming is mandatory under the 2025 update. Delegated Regulation (EU) 2025/1190 Article 12(5) requires the replay and purple teaming no later than 10 weeks after active testing ends, so plan the sessions and their staffing backward from that date.
Which guidance should the red and blue teams read before writing their reports?
The red team lead and the blue team lead should read the red team and blue team test report guidance before drafting their reports. The red team guidance informs how attack activity, flags reached and evidence are recorded. The blue team guidance informs how the entity documents what it detected, how it responded and where monitoring or response fell short. Both reports feed the remediation plan and the test summary report, so agree on a common finding structure early. Consistent identifiers for each finding make it easier for the control team to trace a gap from the report to its remediation item. Confirm with the test manager whether the authority expects a specific template.
What do the remediation plan and test summary report guidance require?
The remediation owner and the CISO should read the remediation plan guidance, and the board-facing risk function should read the test summary report guidance. The remediation guidance informs how each weakness is assigned an owner, a fix and a date. The test summary report guidance informs what leadership needs to see to judge the test's outcome. Under the framework, the remediation plan is due within 8 weeks of the authority's assessment, so budget and staffing for fixes should be agreed before that assessment arrives. TIBER-EU tests do not produce a pass or fail result, so frame the summary around strengths and weaknesses.
Who should read the attestation guidance, and what does it inform?
The compliance lead and the test manager should read the attestation guidance last, once the test summary report and remediation plan are drafted. The attestation guidance informs what the closing statement must confirm and which earlier deliverables it relies on. Read it before the closure phase starts, because it shows which records need to exist for the attestation to be supported. Confirm with the authority who signs the attestation and what evidence they expect alongside it. An implementation partner can help assemble the records, but the attestation itself and the authority's assessment come from the entity and the authority, not from the partner.
What catches a test underway after the update
The January 2025 update changed deadlines, deliverables and roles in ways that older planning assumptions do not reflect. Each card below names one trap that catches teams with a test already running or about to start, and the check to run this month.
Working from a superseded national document
Several national implementation documents were revised after the 2025 framework, and some now state that the TIBER-EU content applies directly without local adaptation. Teams that plan from an older national guide can build the wrong steps, owners or templates into their test plan. Check which national document your authority currently publishes, confirm its version and date with the authority, and compare its deliverable list against the 2025 framework before the next planning meeting.
Planning purple teaming as an optional workshop
The 2025 update made purple teaming mandatory, so it is a formal closure step with its own inputs and outputs, not a discretionary session. Teams that schedule it as a short workshop often find they lack the replay results and blue team findings it needs. Check that your closure plan lists purple teaming as a required step, names who attends for the red team, blue team and control team, and records how its output feeds the remediation plan.
Treating the Control Team as a renamed White Team
The White Team is now called the Control Team, but the rename is not only cosmetic. The Control Team oversees the test in real time, manages risk during active testing and works with the test manager, so it needs named members with authority to pause activity. Teams that keep the old role description may leave these duties unassigned. Check that each Control Team member has a written mandate, a decision path for stopping the test, and a current copy of the Control Team guidance.
Underestimating the 10 week window
Delegated Regulation (EU) 2025/1190 requires replay and purple teaming no later than 10 weeks after active testing ends. Teams that plan this window loosely can miss the deadline when red team reports, blue team reports and staff availability all compete for the same weeks. Check the calendar backwards from the end of active testing, confirm that the blue team and control team have committed to those dates, and agree in writing who is responsible if a delay threatens the deadline.
Procuring providers before checking the guidance
The updated Guidance for Service Provider Procurement explains how to assess the quality of a threat intelligence or red team provider. Teams that sign contracts before reading it may select providers against criteria that the framework no longer treats as sufficient. Check the procurement guidance first, compare your shortlist and contract terms against its quality assessment points, and ask your test manager to review the selection before signature.
Questions buyers ask about the TIBER-EU 2025 changes
Does a TIBER-EU test already underway have to switch to the 2025 documents?
Confirm this with your authority's TIBER Cyber Team before changing anything, because the answer depends on the transition arrangements in your national document and on which phase the test has reached. The January 2025 framework aligned the process steps with the deliverables and timelines of the DORA TLPT standards, so a test that has not yet reached its later deliverables will likely be expected to meet the updated requirements. Ask your test manager which guidance documents apply to each remaining deliverable, and record that answer in the test file. Keep a short log of the version agreed for each step so the closure phase does not rely on memory.
Does mandatory purple teaming add cost or effort to a TIBER-EU test?
Yes, purple teaming adds work, but the main effort is timing rather than a separate testing exercise. The 2025 update made purple teaming mandatory, and Delegated Regulation (EU) 2025/1190 Article 12(5) requires the replay and purple teaming no later than 10 weeks after active testing ends. The cost drivers are the number of attack paths that need replaying, the number of blue team staff who take part, the availability of the red team testers at short notice, and how many detection gaps need fixing before the session. Ask providers to price the replay and purple teaming sessions as a separate line in the written scope, so you can see the effort rather than assume it is included.
How much internal time does the Control Team role take in a TIBER-EU test?
The time depends on how many people sit on the Control Team, how many flags and scenarios the test covers, and how often the team must approve or review red team activity during active testing. The Control Team sits between the tested entity and the red team, so its members must be available for supervision decisions throughout the testing phase, not only at milestones. The 2025 update renamed the White Team to the Control Team, and the ECB published a dedicated guidance document for it. Ask your test manager and your provider to agree a written estimate of Control Team hours per phase, and check whether any member also serves on the blue team, which the guidance may restrict.
Can our own team prepare the new TIBER-EU deliverables without outside help?
Your team can prepare many of the deliverables, but the independence and conflict rules decide which ones it can author and which must come from the providers or the authority. The ECB publishes a guidance document for each main deliverable, including initiation documents, the scope specification document, the red team test plan, the blue team test report, the remediation plan and the attestation. Internal staff are well placed to prepare the scope specification, the remediation plan and evidence of existing controls, while the threat intelligence and red team outputs must come from the independent providers. Confirm the authorship rules for each deliverable with your test manager before work starts, so your team does not prepare outputs that must come from someone else.
How do shorter national implementation documents change test planning?
Shorter national documents mean the framework itself carries more of the rules, so your plan should start from the European text and then check only the local additions. The 2025 update allowed authorities to publish a short implementation document instead of a full national guide. The Bundesbank's TIBER-DE implementation document, version 4.0 from July 2025, says it is no longer necessary to adapt test components nationally because the TIBER-EU content applies directly and fully. Build your timeline from the phase deadlines in the framework, then list the national points your authority has added, such as contacts, fees or reporting channels. Check these points with your authority early, since they are the items most likely to differ between countries.
Are DORA TLPT and TIBER-EU now the same test?
The core requirements are the same, but meeting them is not automatically the same as meeting DORA TLPT in your jurisdiction. The ECB states that the core requirements of DORA TLPT and TIBER-EU are identical, so a test completed under a national or European TIBER-EU implementation is DORA TLPT-compliant if it also meets the formal requirements set by your competent authority. Those formal requirements can include who the authority is, how results are reported and which tester rules apply. The 2025 update aligned timelines with the DORA TLPT standards, and Sweden has stated that TIBER-SE will be used for DORA TLPT. Ask your competent authority to confirm in writing which formal requirements sit on top of the TIBER-EU test.
Who issues the attestation and the other formal test outputs?
The authority's test manager, working with the TIBER Cyber Team, issues the formal outputs of a TIBER-EU test, including the attestation that closes the test. The entity owns its controls and its remediation plan, and the threat intelligence provider and red team testers produce their own reports, which the authority then reviews. DeployOpen prepares systems, controls and evidence for an assessment, but it does not issue attestations, reports or certificates. Ask your authority which outputs it will issue, which ones the entity submits, and which ones the providers deliver, and write that split into the engagement documents so that no party assumes another will produce a required item.
How DeployOpen works on this
DeployOpen plans, builds and documents the self-hosted open-source systems and evidence that a TIBER-EU test examines after the 2025 framework update. We prepare systems and records for the entity to own and for the independent parties to review, but we do not issue test reports, attestations or certifications.
How we scope
- Engagements are fixed-scope, with the systems, deliverables and timelines agreed in writing before work starts.
- The written scope lists which systems support the entity's critical or important functions and how their evidence will be prepared.
- Scope also records which items belong to the entity, which belong to outside providers, and which need the test manager's approval.
How we build
- We implement and harden self-hosted open-source platforms inside the client's own cloud accounts, data centers or air-gapped networks.
- We configure logging, access controls and detection sources so that the control team and blue team can show what they saw and when.
- We align documentation with the 2025 deliverables, including purple teaming records that the replay and closure phases expect.
How we hand over
- We document configurations, runbooks and evidence packages so the entity can present them to its control team and test manager.
- We prepare the material for each guidance-based deliverable, such as the scope specification and remediation plan, for the entity to review and sign off.
- We agree a handover plan that names who inside the entity receives each artifact and who keeps it after the test closes.
How we support
- Ongoing support, upgrades and continuous security testing are available as retainers after the engagement closes.
- Retainers can keep the platforms and evidence current between test cycles, which the framework treats as roughly three years apart.
- Before any engagement, confirm with your authority and test manager which parts of the 2025 process you must perform yourselves.

