What the SR-2 supply chain risk management plan asks for
If an assessor, a contract or a FedRAMP package asks for SR-2, they want a written supply chain risk management plan that covers the full life of the systems, components and services in scope. The control, from the Supply Chain Risk Management family of SP 800-53 Rev. 5, asks the organization to define what the plan covers, from research and development, design and manufacturing through acquisition, delivery, integration, operations, maintenance and disposal. The plan must be reviewed and updated at a frequency the organization sets, and it must be protected from unauthorized disclosure and modification. In SP 800-53B, SR-2 is assigned to the low, moderate and high baselines, and SR-2(1), which establishes a supply chain risk management team, is selected in all three.
The risk SR-2 addresses is unmanaged supplier and component risk that builds up across the life cycle, from a vendor's development practices to a component that is serviced or retired without anyone tracking it. Teams find the control hard because a plan that names no real systems, suppliers or owners is only a document. The plan has to say which systems and services it covers, who owns each supplier relationship, and how the plan connects to the other SR controls, including SR-3, SR-5 and SR-6, and to program-level PM controls such as PM-30. Before writing anything, confirm the scope with the system owners and procurement, because an assessor will test whether the plan matches the inventory.
A practical first step is to check the SR-2 entry in the OSCAL catalog and the SP 800-53A assessment procedures, which list the determination statements an assessor will test. Ask your assessor which document set they expect as evidence, and confirm the review frequency and the team membership that SR-2(1) requires, since both are set by the organization and must be stated in the plan itself. Access controls on the plan, such as limiting who can edit it, are part of meeting the protection requirement.
Which systems, suppliers and life cycle phases the SR-2 plan covers
The SR-2 plan is only as useful as its scope. Each decision below changes which suppliers, components and life cycle phases the plan must address, and how deep the work goes. Settle them before drafting the plan, and keep them aligned with the system boundary in the security plan.
Systems, components and services in scope
SR-2 requires the plan to name the systems, components or services it covers. Start from the system boundary in the security plan and list every component and service that boundary depends on, including hosting, identity, logging and build tooling. A plan that names only the core application leaves the supporting layers unmanaged. Confirm the list with the system owner and record who approved it. Illustrative example: a self-hosted ticketing platform whose plan omits its container registry has a gap in the first review.
Life cycle phases that apply
SR-2 lists research and development, design, manufacturing, acquisition, delivery, integration, operations, maintenance and disposal. Not every phase applies to every system. A self-hosted platform deployed into the client's own cloud account mainly touches acquisition, delivery, integration, operations, maintenance and disposal, while a platform the organization builds or customizes adds design and development risk. Mark each phase as applicable or not applicable, with a reason, so an assessor can see the decision.
Third parties and open-source components
Include the suppliers that deliver software, hosting, managed services and support, as well as the open-source packages, base images and libraries the platform pulls in. Open-source components have upstream maintainers and release cycles that the organization does not control, so they belong in the plan even when no contract exists. Ask each supplier how it handles its own supply chain risk, and record which components have a software bill of materials that the team can review.
Impact level and FedRAMP class
The impact level of the system sets the baseline, and SP 800-53B assigns SR-2 and SR-2(1) to the low, moderate and high baselines. FedRAMP's Rev5 baselines require SR-2 and SR-2(1) at Classes B, C and D. Confirm the impact level or FedRAMP class with the authorizing official or contract owner before scoping, because a higher class means more depth in the plan's risk analysis and review. Ask the contracting office which class and baseline they require in writing.
Alignment with the security plan boundary
The SR-2 plan should cover the same system boundary as the security plan and the system inventory. When the two documents describe different boundaries, assessors find components that appear in one but not the other. Compare the component list, data flows and external connections in both documents at each review. Note which items are shared infrastructure owned by another team, and state who is responsible for managing their supply chain risk.
How an assessor tests the SR-2 supply chain risk management plan
This table groups the SP 800-53A assessment of SR-2 into plan content, review and protection checks, then adds the SR-2(1) team. Read each row as what an assessor will ask to see, which methods they will use and where engagements usually stall. Confirm the exact wording of the twelve determination statements in SP 800-53A before you map them to your own evidence.
| Assessment group | Methods and examine objects | Evidence requested | Common findings |
|---|---|---|---|
| Plan scope across the life cycle | Examine: system life cycle documentation and acquisition documentation. Interview: system owners and acquisition staff. | Plan text that maps each life cycle phase to the defined systems, components or services. | Plan names no systems in scope or omits maintenance or disposal. |
| Threats and safeguards | Examine: list of supply chain threats and list of safeguards against those threats. | Current threat list and safeguard list, included in or referenced by the plan. | Threat list is generic or out of date, with no link to safeguards. |
| Review and update cycle | Examine: plan revision history and review records. Interview: plan owner. | Defined review frequency, dated approvals and a change log showing each review. | Review date has passed or no record shows who approved the update. |
| Protection from disclosure and modification | Examine: access settings, storage location and distribution records for the plan. | Access restrictions, document marking, storage controls and access logs. | Plan is shared broadly with no marking, access restriction or change control. |
| Organization-defined parameters | Examine: the values the organization set for the two SR-2 parameters in Release 5.2.0. | Documented parameter values, with an owner's approval and a rationale for each value. | Parameters left blank or set to an undefined review frequency. |
| SR-2(1) supply chain risk management team | Examine: team charter and roster. Interview: team members and the plan owner. | Named team, defined roles and records of meetings or decisions showing the team operates. | Team exists on paper only, with no records of activity. |
How to write an SR-2 supply chain risk management plan, step by step
This sequence turns SR-2 into a plan an assessor can test: a scoped set of systems and components, life cycle owners, a threat and safeguard register, an approved and versioned plan, and clear links to SR-3, SR-5 and SR-6.
Confirm systems and components in scope
Start from the system boundary in the system security and privacy plan and list every system, component and service the plan must cover, including those supplied by third parties. The security owner and system owner agree the list with procurement and engineering. The output is a scoped inventory that names each system, its owner and the suppliers involved. You know this step is done when every item in the boundary maps to an inventory line and the owners have signed off the list.
Map life cycle phases to owners
SR-2 covers research and development, design, manufacturing, acquisition, delivery, integration, operations, maintenance and disposal, so take each phase in turn and name the accountable role for it. Engineering, procurement, operations and facilities usually hold different phases, and gaps often appear at delivery and disposal. The output is a phase-to-owner matrix that shows which role answers for each phase of each in-scope item. Done means no phase is left without a named owner.
Identify supply chain threats and chosen safeguards
For each in-scope item, record the supply chain threats that apply, such as compromised updates, counterfeit parts, weak supplier security or disrupted delivery, and the safeguards you have chosen for each. The SR-2 assessment expects a list of threats and a list of safeguards, so keep both as separate, linked records. The output is a threat and safeguard register with a named owner for each safeguard. The step is complete when each threat points to at least one safeguard or a documented risk acceptance.
Set the review cycle and approval chain
Decide how often the plan is reviewed and updated, and which events trigger an earlier review, such as a new critical supplier, a significant system change or a material incident. Assign who reviews the plan, who approves it and who signs off changes. Write these rules into the plan itself, because the assessor will look for the defined frequency in the document rather than in people's habits. The output is an approved plan that states its review frequency, triggers, reviewers and approvers. Confirm the exact frequency your authorizing official or contract requires before you fix it.
Protect the plan from unauthorized change
SR-2 requires the plan to be protected from unauthorized disclosure and modification, so decide where the plan lives and who can read and edit it. Version-controlled documentation with role-based permissions usually meets this need, and the platform should record who changed what and when. The output is a stored, access-controlled plan with a version history and a short record of who holds edit rights. Done means you can show the current version, the previous versions and the access list on request.
Link the plan to SR-3, SR-5 and SR-6
Agree how the plan hands off to the supply chain controls in SR-3, the acquisition strategies and contract clauses in SR-5, and the supplier assessments in SR-6. Each linked control should cite the plan's threat and safeguard register rather than repeat it. The output is a cross-reference table that names the plan section each linked control depends on and the owner of each handoff. Check the table against the plan's life cycle matrix so no phase is covered only in one control and missing from the others.
Setting the review cycle and protecting the SR-2 plan
SR-2 requires the organization to define how often the supply chain risk management plan is reviewed and updated, and the organization sets both the frequency and the events that force an earlier update. Write the review frequency into the plan itself and into the policy that SR-1 governs, so an assessor can see one stated cycle rather than an informal habit. Pair the calendar review with explicit off-cycle triggers: onboarding a new supplier class, such as a hosting provider or a firm that ships firmware into your environment; a major supply chain incident affecting a component or supplier you use; and a significant change to the systems the plan covers, such as a new platform, a change of cloud region or a move to a different build pipeline. Name the role that decides whether a trigger has fired, usually the security owner of the plan with the supply chain risk management team from SR-2(1) where that team exists.
Record every review as a dated entry that states who reviewed the plan, what changed, why it changed, and which triggers or calendar dates prompted it. Confirm with your own governance team whether the review must also be approved by a named executive, since the approval chain is an organizational decision that NIST does not fix. The assessment procedures in SP 800-53A look for evidence that the review actually happened on the defined cycle, so the log of reviews is the artifact an assessor will ask for first. The evidence section of this page describes what each entry should contain.
Protect the plan as a sensitive document because it maps your suppliers, dependencies and weak points. Limit read and edit access to people who need it for their work, and review that list when roles change. Keep the plan under version control so every change is attributable and any earlier version can be restored, which is the same discipline a wiki with page history provides. Before publishing, strip out threat-specific detail that would help an attacker target a supplier or component, such as exact unpatched versions or the names of weak integrators, and keep that detail in a restricted annex with tighter access. Confirm that backups of the plan follow the same access rules as the live copy.
Staffing the SR-2(1) supply chain risk management team
SR-2(1) asks the organization to establish a supply chain risk management team, and SP 800-53B selects it in the low, moderate and high baselines. The cards below cover the roles that team needs, how it operates and records its work, and how its decisions feed the plan and the SR-3, SR-5 and SR-6 work that follows from it.
Accountable lead
Name one person who owns the team, chairs its meetings and answers to leadership for the supply chain risk management plan. This role decides when a supplier issue is escalated and signs off the plan before each review. Confirm the lead has authority to pause a procurement or require a supplier assessment, since a lead without that authority cannot close findings. Record the appointment in the charter so an assessor can trace ownership from the plan to a named individual. Ask whether the lead also holds the system owner or procurement role, because a combined role may weaken independent review.
Security and risk representatives
Security staff bring threat intelligence, vulnerability data and the list of supply chain threats that SR-2 assessors examine. They judge whether a component or supplier creates risk that existing safeguards do not cover. Their output should feed the risk assessment work in RA-3 and RA-7, so the team does not maintain a separate risk register. Ask who owns the threat list, how often it changes and whether it covers software dependencies as well as hardware and services.
Procurement and contracts
Procurement and legal or contracts staff hold the levers that change supplier behavior: clauses, approved supplier lists and renewal terms. They confirm which acquisitions reach the team and which are routed through standard purchasing without review. Their participation determines whether the SR-5 acquisition strategies and SR-8 notification terms match what the team decides. Check that contract templates reference the plan, and that a contract cannot be signed for a covered system without the team's input.
System owners and operators
System owners know which systems, components and services are in scope, and they carry the operational consequences of a supplier decision. They report changes in deployed components, maintenance access and dependencies that the team has not yet reviewed. Their inventory is the starting point for determining which items the plan covers across the life cycle. Ask whether each owner has a named deputy, because a team that depends on one person for system knowledge will miss changes during absence.
Engineering and development
Engineering staff review the technical facts behind a supply chain decision: build provenance, dependency sources, update channels and whether a component can be verified before deployment. They can tell the team whether a proposed supplier changes the software bill of materials or the release path. Their findings should inform SR-4 provenance records and the SR-3 controls chosen to limit harm. Confirm that at least one engineer with build and release responsibility attends each review that involves software.
Meeting cadence and records
The team's charter should set how often it meets and what each meeting produces. Minutes, decisions, risk acceptances, supplier exceptions and open actions form the record that an assessor samples when testing SR-2(1). Keep the decisions in a versioned location so changes to membership and the charter can be traced. The cadence itself is an organizational choice, and the cadence and any triggers for unscheduled meetings should be set by the organization and confirmed against the assessment plan. Ask the assessor which records they expect to sample and the period they will cover.
Evidence that passes an SR-2 assessment and how to keep it current
What does an assessor look for in the approved SR-2 supply chain risk management plan?
The assessor looks for a single approved plan that names the systems, components or services it covers and walks through each life cycle phase the control lists, from research and development through disposal. The plan should state who approved it, the version in force, and how it is protected from unauthorized disclosure and modification. Keep version history in a wiki or document system that records the author, date and approver for every revision, so the assessor can see the plan changed in step with the environment. Confirm with your assessor which format and approval record they accept, since the control leaves those choices to the organization. XWiki keeps every page change under version control, recording what changed, when and by whom, and lets you compare versions and roll back, which fits this artifact well.
How should the SR-2 review log show that the plan stays current?
The review log is the record that proves the plan was reviewed at the frequency the organization defined, and that the review produced updates when needed. Each entry should carry a date, the reviewers, the approver, the outcome and a link to any resulting version. Assessors often find gaps here, where the plan says annual review but the log shows one entry from the first year. Set the review frequency in the plan itself, add a calendar trigger for it, and record reviews even when nothing changed. A review triggered by a material change, such as a new critical supplier or a major incident, should be logged separately with its reason. Keep the log in the same version-controlled space as the plan so the two cannot drift apart.
What threat and safeguard lists does an assessor expect the SR-2 plan to reference?
SP 800-53A lists examine objects for SR-2 that include a list of supply chain threats and a list of safeguards to be taken against those threats, so an assessor will ask to see both and check that the plan points to them. The threat list should reflect the organization's actual suppliers, components and delivery paths, with an owner and a date for each entry. The safeguards list should link each threat to the controls chosen to address it, such as the SR family controls or contract terms. Keep these lists as versioned documents referenced by the plan rather than embedded in it, so updates do not require reissuing the whole plan. Confirm the required level of detail with the assessor before building the lists.
What evidence shows the SR-2(1) supply chain risk management team is operating?
The SR-2(1) enhancement requires an organization to establish a supply chain risk management team, so the assessor will look for a charter that names the team's members, roles, authority and reporting line, plus meeting records showing the team acted. Good evidence includes meeting agendas, minutes with decisions and action items, and records of reviews the team carried out on suppliers or the plan. The charter should state how the team connects to procurement, security and the owners of the systems in scope. Keep membership current by updating the charter when people change roles, and keep minutes in the same versioned space as the plan. Access to these records can be limited to team members through role-based permissions, for example in BookStack, which assigns abilities through roles and can override them per shelf, book, chapter or page.
Which life cycle and acquisition documents does an SR-2 assessment review?
The plan points to life cycle and acquisition documents, and assessors check that those documents exist, match the plan's scope, and are actually followed. Typical items include the system life cycle documentation, acquisition documentation, design and integration records, and maintenance and disposal procedures for the systems or components the plan covers. Assessors often sample a recent acquisition and trace it back to the plan. Keep these documents current by assigning an owner to each and tying updates to change requests. For component inventory evidence, OWASP Dependency-Track consumes and produces CycloneDX SBOMs and VEX, and identifies components with known vulnerabilities, outdated or modified components and license risk. Confirm with the vendor how its component records map to your asset inventory before relying on it as evidence.
Who should own keeping SR-2 evidence current between assessments?
The organization owns its controls and its evidence, so an internal owner, usually in security or risk management with procurement involved, should hold responsibility for each artifact. An implementation partner can help set up the document structure, version control, access roles and inventory integration, and can prepare evidence for an assessment. Only the independent assessor reports on whether SR-2 is satisfied. Between assessments, the owner should run a checklist covering plan approval, review log entries, threat and safeguard list updates, team meeting records and acquisition document currency. Ask any consultant to put that division of roles, and what they will and will not produce, in the written scope before work starts.
What does it cost to keep SR-2 evidence current, and what drives it?
Ongoing cost is mostly staff time for reviews, team meetings and updating lists and documents, plus any tooling and support you buy. Costs rise with the number of suppliers, systems and components in scope, how often material changes happen, and how many approvers the plan requires. Tool licensing for open-source platforms is typically zero, but hosting, administration and integration are not, and these are paid to you or to a partner depending on who does the work. NIST does not estimate compliance costs, so ask any partner for a fixed-scope written quote that separates one-time setup (document structure, version control, role design, inventory integration) from recurring activity (reviews, evidence upkeep, support). Ask which items the quote assumes you will perform yourself.
What meeting SR-2 costs in money and effort
This table compares the cost components of an SR-2 program, showing who does the work, whether each cost is one-time or recurring, and what pushes it up or down. NIST does not estimate compliance costs, so use the table to structure a quote request rather than to budget.
| Cost component | One-time or recurring | What drives it up | What keeps it down |
|---|---|---|---|
| Writing the SCRM plan and defining its scope | One-time, then revised at each review | Number of systems, components and services in scope; number of life cycle phases with separate owners | Reusing existing procurement, vendor risk and SCRM documents as source material |
| Engineering and procurement time to inventory systems and suppliers | One-time build, recurring refresh | Number of systems, suppliers and sub-tier dependencies; gaps in current asset records | Existing configuration management database, asset inventories and supplier registers |
| Standing up the SR-2(1) supply chain risk management team | One-time setup, recurring staffing | Number of roles needed across security, procurement, engineering and legal; how many people are shared with other functions | Assigning existing staff with defined duties rather than hiring dedicated headcount |
| Evidence upkeep: review cycles, version control and access management | Recurring | Frequency of the review cycle set in the plan; number of document owners; frequency of supplier and system changes | Self-hosted wiki with page version history and role-based permissions, which avoids per-seat license spend |
| SBOM and component tracking for supply chain evidence | Recurring | Number of software components and products; frequency of releases and dependency updates | Self-hosted open-source SBOM analysis tooling that consumes CycloneDX documents, avoiding commercial license fees |
| External review of the plan | Recurring, typically at each review or assessment cycle | Scope of the plan; need for review by an independent assessor or a consultant; number of revisions | Keeping the plan to a defined scope and providing clear evidence of prior reviews |
| Assessor testing time | Recurring, at each assessment | Number of determination statements tested; number of systems sampled; quality of existing evidence | Organized evidence that maps directly to the SR-2 assessment objects, such as life cycle documentation and acquisition records |
Your team, an implementation partner and the auditor on SR-2
Your organization owns the supply chain risk management plan. Leadership must approve it, name the officials responsible for it, and decide which systems, components and services it covers across research and development, design, manufacturing, acquisition, delivery, integration, operations, maintenance and disposal. The SR-2(1) enhancement asks you to establish a supply chain risk management team, so the team's membership, mandate and decision rights are also yours to define. Supplier decisions, including whether to accept a supplier's risk, stay with your staff.
- Plan approval: Confirm which executive signs the plan and how it is revised after a significant change to systems or suppliers.
- Scope decisions: Decide which systems, components and services fall under the plan and document the reasons for any exclusions.
- SR-2(1) team: Record who sits on the team, which functions they represent, and how the team escalates decisions.
- Supplier decisions: Keep the authority to accept, restrict or exit a supplier, and record the rationale.
- Review cycle: Set the review frequency as an organization-defined parameter and keep dated approvals.
Before any outside work starts, confirm that your staff can state the plan's scope and name the SR-2(1) team members without consulting the consultant.
An implementation partner such as DeployOpen works inside your environment under a written fixed scope. Typical work includes scoping the systems the plan must cover, drafting the plan from your inputs for your review, configuring the self-hosted tools that hold the plan and component records, and assembling the evidence set an assessor will request. The partner prepares these artifacts. It does not decide what your plan says about your suppliers, and it does not issue any assessment result.
- Scoping support: Map systems and component inventories to the life cycle phases so the plan's scope can be tested.
- Draft preparation: Turn your inputs into a draft plan that you edit, approve and own.
- Tooling setup: Deploy self-hosted tools such as XWiki for versioned plan documents, BookStack for role-based access, and OWASP Dependency-Track for SBOM and component records, where your environment and requirements fit.
- Evidence assembly: Collect approvals, version histories, review records and team membership records in one indexed set.
- Written boundaries: Agree deliverables, exclusions and handover dates in the statement of work before work begins.
Ask the partner to list which artifacts it will hand over, which it will not produce, and who in your organization signs each one.
The independent auditor or assessor tests SR-2 against the assessment procedures in SP 800-53A, examining documents, interviewing staff and, where relevant, testing configurations. Under FISMA, separate Inspectors General perform independent assessments for federal agencies. The auditor or assessor is the only party that issues a report or attestation. Your partner or internal team cannot issue that conclusion, and a partner that has written the plan should not also be the party testing it.
- Examine: The assessor reviews the plan, the list of supply chain threats, the safeguards and the acquisition documentation.
- Interview: Staff who own supplier decisions and SR-2(1) team members are asked to explain how the plan operates.
- Test: Where the plan relies on tooling, the assessor may check that records are complete and traceable.
- Independence line: An assessor cannot design the controls it then tests for the same engagement without disclosing the conflict.
- Findings: Gaps are recorded for remediation through your plan of action and milestones.
Confirm with the assessor, before fieldwork, which evidence formats it accepts and whether it expects the plan's approval history to be exported from your own systems.
Questions buyers ask about SR-2 plan cost, effort and outside help
How much effort does a first SR-2 supply chain risk management plan take?
The effort depends mostly on how many systems, components and services the plan must cover and how much of the life cycle already has documented owners. SR-2 asks for a plan covering research and development, design, manufacturing, acquisition, delivery, integration, operations, maintenance and disposal of the defined systems, components or services, so the scope decision comes first. Organizations with a clear system inventory and named acquisition owners usually spend less time than those assembling both from scratch. No duration is set by NIST, so ask your assessor or partner to show the work breakdown in the written scope, with each life cycle phase, its inputs and its reviewers listed before any drafting starts.
Can an internal team write an SR-2 plan without a partner?
Yes, in most cases an internal team can write the plan, because SR-2 is a documentation and governance control rather than a technical build. The organization owns its controls and the plan, so the people who approve it must be inside the organization. The harder part is evidence: the plan has to be protected from unauthorized disclosure and modification, reviewed on a defined cycle, and traceable to how suppliers and systems are actually managed. An outside partner can help with the document structure, the scope mapping and the evidence trail, but an independent assessor is still needed to test the control against the assessment procedures in SP 800-53A.
What does the organization need to provide for the SR-2 work?
The work needs three inputs from the organization: a current system and component inventory, a list of suppliers and the services they deliver, and named owners who can approve decisions. Time is also needed for reviews, because the plan must be reviewed on a defined frequency and updated when conditions change. Expect to supply acquisition documentation, life cycle documentation for each in-scope system, and the list of supply chain threats the organization already tracks. Gaps in these inputs usually become the largest source of delay, so confirm access and reviewer availability before the engagement starts.
How often must the SR-2 plan be reviewed, and who sets that frequency?
SR-2 requires the plan to be reviewed and updated at a defined frequency, and the organization sets that frequency as an organization-defined parameter. NIST does not fix a number in the control text, so the organization chooses it and documents the choice. Reviews should also be triggered by significant changes, such as a new critical supplier, a major system change or a supply chain incident. Ask your assessor to confirm whether the chosen frequency matches any contract, FedRAMP or regulator requirement that applies to your environment.
Can an existing procurement or security group meet SR-2(1)?
Yes, an existing group can meet SR-2(1) if it is formally established as the supply chain risk management team and given the authority and skills the enhancement expects. SR-2(1) asks the organization to establish that team, so the key decision is designation and accountability rather than headcount. Procurement, security, legal and system owners often need to sit on the team together, because supply chain decisions cross those functions. Document the team's charter, its members and its decision rights, and confirm with your assessor that the existing group's remit covers the defined systems and components.
What should a quote for SR-2 plan work include?
A quote should follow from a written scope, and it should list each deliverable, its owner and its acceptance criteria. Ask for the defined systems and life cycle phases in scope, the number of reviews included, the team and roles who do the work, and what the organization must supply. Separate one-time work, such as the first plan and the team charter, from recurring work, such as scheduled reviews and updates. DeployOpen does not publish a price list, and most engagements are fixed-scope, so the quote should state the scope it prices. Ask the independent assessor separately what testing and report fees apply, because only that assessor issues the assessment result.
How DeployOpen drafts and prepares the SR-2 plan and its evidence
DeployOpen helps organizations prepare the systems, documents and evidence behind an SR-2 supply chain risk management plan that the organization owns and approves. We plan and document the work inside your own infrastructure, and an independent assessor reviews the result.
How we scope
- Engagements are fixed-scope, with the systems, life cycle phases and supplier categories agreed in writing before work starts.
- We confirm which systems, components and services the plan covers, so the SR-2 scope matches the actual boundary.
- Ask us to state in the written scope who approves the plan and who holds the review cycle and protection duties.
How we build
- We draft the plan structure around SR-2 elements: research and development, design, manufacturing, acquisition, delivery, integration, operations, maintenance and disposal.
- We set up the self-hosted documentation and version control where the plan is kept, with access limited to named roles.
- We map the plan to the examine objects an assessor will request, such as acquisition documentation and life cycle documentation.
How we hand over
- You receive the plan, its supporting records and a list of the evidence each SR-2 determination statement requires.
- We document the review cycle and the protection rules for the plan so your team can run them after handover.
- An independent auditor or assessor, not DeployOpen, examines the evidence and issues any report or certification.
How we support
- Ongoing support, upgrades and continuous testing are available as retainers after the initial scope is delivered.
- Retainers can cover periodic plan reviews, updates after changes in suppliers or systems, and evidence refreshes before an assessment.
- Confirm the support terms, response expectations and review frequency in the written proposal before you sign.

