PM-30 Supply chain risk management strategy

PM-30 asks for one organization-wide strategy for supply chain risk across development, acquisition, maintenance and disposal. This page explains what assessors check, what evidence passes, what it costs and what to outsource.

On this page

PM-30 supply chain risk management strategy: what it asks for and why it is hard

When an assessor or a contract asks for a supply chain risk management strategy, the request usually points to PM-30. PM-30 asks the organization for one organization-wide strategy for managing supply chain risk across the development, acquisition, maintenance and disposal of systems, components and services. It is a program-level control, so it is deployed once for the whole organization rather than rebuilt for each system. The strategy must be implemented consistently and reviewed and updated at a defined frequency, or sooner when organizational changes require it. The defined frequency is an organizational decision you must document, so confirm what your contract or assessor expects before you set it.

PM-30 is not allocated to the low, moderate or high control baselines, and it is not in the privacy baseline. SP 800-53B treats Program Management controls as independent of system impact level, so the strategy applies whether a system is categorized low or high. Reviewers therefore look for the strategy itself and evidence that it governs real decisions, not a per-system checklist. Check the baseline profiles in NIST's OSCAL content if you want to confirm the allocation against the current release.

PM-30 is hard for a practical reason: the strategy sits between procurement, engineering and risk teams, and none of them usually owns it. Procurement holds the contract terms, engineering chooses components and dependencies, and enterprise risk management sets tolerance. A useful strategy needs a single accountable owner, agreed supplier criteria, and a way to feed supplier findings into PM-9 risk decisions and PM-4 plans of action and milestones. Start by asking who signs the strategy, which teams must follow it, and where the last review is recorded, because those three answers are the evidence an assessor will request first.

Which suppliers, products and lifecycle stages PM-30 covers

PM-30 is an organization-wide strategy, so its scope is set by the organization, not by any single system. The decisions below determine which suppliers, products and lifecycle stages the strategy must govern, and they connect directly to CM-10, PM-9 and the SR family.

Lifecycle stages the strategy covers

PM-30 names four stages: development, acquisition, maintenance and disposal. Decide whether the strategy applies to all four for every system, or whether some stages (for example, disposal of hardware leased from a third party) need their own procedures. Document which stages each business unit owns and who signs off on exceptions. Ask your assessor to confirm that each stage has a named owner and a defined review trigger, since the control requires consistent implementation across the organization.

Critical suppliers and critical items

Decide whether the organization will identify suppliers of critical systems, components and services. The PM-30 enhancement covers this identification, and it is the step that tells you where deeper supplier assessments under the SR family belong. Build the list from business impact, not from contract value: a small license vendor can be critical if its product sits in an authentication path. Record which critical items have no alternate source, since that gap usually drives the most urgent risk decisions.

Software and hardware components entering the environment

Define which software and hardware enter the environment through development, purchase or open-source reuse, and how each is recorded. An SBOM generated for each release, with the component inventory maintained under CM-8, gives you the input the strategy needs. Confirm with your tooling vendor that its SBOM output covers the component types you deploy, such as firmware or container base images, because gaps there are easy to miss.

Managed services and third-party hosting

Decide whether managed services, hosted platforms and outsourced operations fall inside the strategy. Their components are rarely visible in your own inventory, so the strategy should require the provider to disclose its material subcontractors and component sources. Also decide who approves a managed service before it is used. An implementation partner can prepare the documentation for these services, but the organization must own the risk decision and the supplier relationship.

Open-source dependencies

Open-source components are acquired without a purchase order, so they often fall outside procurement controls. Decide how they are approved, which license types are acceptable, and how upstream vulnerabilities and abandoned projects are tracked. Dependency tracking tools such as OWASP Dependency-Track consume and produce CycloneDX SBOMs and track license use by SPDX identifier, which can give you that visibility. Confirm each tool's current capabilities in its documentation before relying on it as evidence.

Links to CM-10, PM-9 and the SR family

PM-30 is a program-level strategy that the system-level SR controls implement, so the scoping choices must map to them. Confirm that the SR family's supplier assessments, provenance checks and disposal steps reference the same lifecycle stages and critical items you chose. Link the strategy to PM-9 risk management and to CM-10 software usage restrictions, so that a license or component decision is recorded in both places. Ask your assessor which related controls they expect to see cross-referenced.

How an assessor tests the PM-30 strategy

This table shows how an assessor works through PM-30 using the examine and interview methods in SP 800-53A, which assessment objects are requested and what evidence supports each point. The assessment uses 15 determination statements, so read each row as the material an assessor will ask to see or discuss before judging whether the strategy is in place and operating.

Assessment elementWhat the assessor doesEvidence requestedWhere it usually fails
Examine the strategy documentReads the supply chain risk management strategy against the PM-30 determination statements, checking that it covers development, acquisition, maintenance and disposal of systems, components and servicesThe approved supply chain risk management strategy, with version history and the approving officialStrategy covers acquisition only and omits maintenance or disposal
Examine the risk management strategyChecks that the supply chain strategy aligns with the organizational risk management strategy and enterprise risk documentsOrganizational risk management strategy, enterprise risk management documents and cross-references to the supply chain strategySupply chain risk is absent from enterprise risk registers
Examine consistency of implementationTraces whether the strategy is applied in practice, not only writtenExamples of supplier onboarding, acquisition files and disposal records that follow the strategyStrategy exists but is not implemented consistently across business units
Examine review and update recordsConfirms the strategy is reviewed and updated at the defined frequency or when organizational changes require itReview minutes, change log and sign-off records with datesStrategy has no review record or the review cycle is missed
Interview supply chain risk personnelAsks named staff how the strategy is applied, who decides on supplier risk and how exceptions are handledRole descriptions, responsibility assignments and sample decisionsStaff describe a process that differs from the written strategy
Interview acquisition personnelAsks how supply chain risk is considered during procurement and contract awardProcurement procedures, contract templates and acquisition checklistsProcurement proceeds without referring to the supply chain strategy
Interview enterprise risk personnelAsks how supply chain risk feeds into organization-wide risk decisions and reportingRisk register extracts, risk committee minutes and escalation recordsSupply chain risks are not escalated to the enterprise risk function
Confirm the count of determination statementsWorks through all 15 determination statements and records a finding for eachMapped evidence per determination statement, prepared in advance by the organizationGaps against individual statements are discovered late in the assessment

Building the PM-30 strategy in six steps

This sequence turns PM-30 from a sentence in a policy into an approved, organization-wide strategy that names the lifecycle stages it covers, the people who own each part, the critical suppliers it tracks and the triggers that force a review. Each step produces a named artifact that an assessor can examine or interview against.

  1. Scope the lifecycle stages and systems

    Start by listing the four lifecycle stages PM-30 names: development, acquisition, maintenance and disposal. For each stage, record which systems, components and services fall within scope, and which business units, contracts and development teams touch them. Enterprise risk and acquisition leads should sign off the list. The output is a scope statement with a lifecycle matrix mapping systems and services to stages. It is done when every in-scope system appears in at least one stage and the owner of each row is named. Confirm the boundary with your assessor before drafting further, because a narrow scope is the most common reason the strategy later fails to cover what the organization actually buys and runs.

  2. Define roles across risk, acquisition and engineering

    Assign a named owner for each lifecycle stage and for the supply chain risk function as a whole. Typically this involves the risk executive or enterprise risk function, the procurement or acquisition office, system engineering and the security team. Write each role's responsibilities, decision rights and escalation path. The output is a responsibility assignment table, reviewed by each function head and linked to the enterprise risk management documents that already exist. The step is complete when every stage in the matrix has an accountable owner and the interview questions an assessor would ask, such as who manages supplier risk and who handles acquisition decisions, can be answered from the document alone.

  3. Document the strategy and its risk tolerance

    Write the strategy itself. It should state the objectives of supply chain risk management, the risk threshold that acquisition and engineering teams work within, the methods used to assess suppliers and components, and how the strategy links to the organization's risk management strategy under PM-9 and its risk framing under PM-28. Keep the language specific enough to test: an assessor should be able to see what the organization does at each stage and what it refuses to accept. The output is a versioned strategy document with a risk tolerance statement and cross-references to the related SR, PM and CM controls. It is complete when another security leader could apply the strategy to a new purchase without asking the author for interpretation.

  4. Identify suppliers of critical items

    This step covers the one active enhancement to PM-30, which calls for identifying suppliers of critical system components and services. Start from the systems and components with the highest mission or security impact, then trace each one back to its supplier, including the upstream suppliers that build hardware, libraries or cloud services the organization depends on. Record the criticality reason for each entry. For open-source platforms, a software bill of materials generated with a tool such as Trivy (Apache-2.0) can show the components in use, and OWASP Dependency-Track (Apache-2.0) can track them over time. The output is a critical supplier register. The step is complete when every critical item has an identified supplier and the register is linked to the lifecycle matrix from the first step.

  5. Set the review frequency and triggers

    Define how often the strategy is reviewed and what events force an earlier review. PM-30 requires review and update at a defined frequency or as organizational changes require, so the organization must choose the interval and document it. Typical triggers include a new acquisition, a supplier breach or a material change to a critical system. Confirm the interval with your assessor and with the policy owner, since the requirement leaves the number to the organization. The output is a review schedule with named triggers, recorded in the strategy document and in the governance calendar. The step is complete when a review can be traced to either a calendar entry or a trigger event, with the reviewer and the date of each completed review recorded.

  6. Approve and distribute the strategy

    Obtain formal approval from the accountable senior official, then distribute the strategy to every role named in step two and to the procurement and engineering teams that apply it daily. Record the approval date, the approver and the version number. Keep a distribution record showing who received the document and who acknowledged it. The output is an approved strategy, a distribution log and a version history. An independent assessor will check this step first, because it is the evidence that the strategy is implemented consistently across the organization rather than sitting in a repository. The step is complete when the assessor can trace the approval, the distribution and the acknowledgments to the people who actually run acquisitions and engineering work.

Evidence that passes a PM-30 review

A PM-30 assessor tests whether the supply chain risk strategy exists, is applied and is kept current. The cards below are the artifacts that show each of those things, and they connect to one another: the strategy drives the supplier list, the supplier list drives acquisition records, and reviews and POA&M entries show the cycle running.

Approved strategy with version history

The organization-wide supply chain risk management strategy is the primary document an assessor examines. It should name the scope covering development, acquisition, maintenance and disposal of systems, components and services, state who approved it, and carry a version history showing each revision and its reason. Check that the document defines the review frequency and that the approval date matches the most recent review. Keep the approved copy in a controlled repository and record every change with a reviewer's name. Assessors compare the strategy against what staff describe in interviews, so the document must match actual practice.

Supplier criticality list

This list identifies which suppliers and components are critical to the organization's systems, which is the basis of the PM-30 enhancement on critical item suppliers. Each entry should record the supplier, the items or services provided, the systems that depend on them and the criticality rationale. Review the list whenever a supplier changes, a critical system is added, or an incident affects a supplier. Between audits, tie each entry to the most recent assessment date so the list reflects current dependencies rather than a snapshot from the last review cycle.

Acquisition and development records

Assessors look for evidence that the strategy changes real decisions. Sample recent purchase requests, contracts, security reviews and software onboarding tickets, and check that supply chain risk was considered and recorded. For software, component inventories such as CycloneDX SBOMs produced by tools like Dependency-Track or Trivy can show which third-party components entered a build. Keep these records in the systems where the work happens, linked to the supplier entry, so an assessor can trace a purchase back to the strategy without reconstructing it from email.

Review minutes and triggered reviews

Minutes from scheduled reviews show the strategy is reviewed at the frequency the organization defined, and minutes from event-driven reviews show it is updated when organizational changes require. Record attendees, decisions, changes made and open actions. Triggers commonly include a major acquisition, a supplier breach, a change in regulatory obligations or a new critical system. Keep a calendar of planned reviews and file each set of minutes against the strategy version it changed, so the review history is visible without manual reconstruction.

Links to risk strategy and POA&M records

PM-30 connects to the organization-wide risk management strategy under PM-9 and to the POA&M process under PM-4, which covers supply chain risk management. An assessor will check that supply chain risks appear in the enterprise risk register, that strategy decisions reflect them, and that any gaps have tracked POA&M entries with owners, milestones and status. Cross-reference each supply chain risk to its POA&M item and to the risk response chosen. Stale entries with no progress are a common finding, so review open items at each strategy review.

Interview-ready role descriptions

The SP 800-53A procedures include interviews with people who hold supply chain risk, acquisition and enterprise risk responsibilities. Current role descriptions should state each person's supply chain duties, decision authority and reporting line, and they should match the strategy's assignments. Confirm that the people named can explain how the strategy is applied to a recent purchase or supplier change. Update the descriptions when staff move, and keep a training or briefing record showing that the role holders received the current strategy.

Open-source tools that produce supply chain evidence

PM-30 asks for a strategy that the organization writes, approves and keeps current. The tools below do not write that strategy, but they produce the inventories, vulnerability records, license findings and framework mappings that show the strategy is being applied to real components and suppliers. Each runs inside your own infrastructure, so the evidence stays under your control.

Component inventory and risk tracking

OWASP Dependency-Track (Apache-2.0) ingests CycloneDX software bill of materials (SBOM) and vulnerability exploitability exchange (VEX) documents, then reports components with known vulnerabilities, outdated or modified components and license risk. It tracks license use by component using SPDX license IDs. For PM-30, the useful output is a per-system record of which suppliers' components are in production and how they changed over time. Check that your suppliers can provide CycloneDX SBOMs and that your team has a process to review findings and record decisions.

SBOM generation and existing SBOM scanning

Trivy (Apache-2.0) identifies the OS packages and software dependencies in a target and can produce them as an SBOM. It can also scan SBOMs you already receive from suppliers, which matters when a supplier delivers a product you cannot build yourself. For PM-30, this lets you generate evidence for systems you operate and verify supplier-provided inventories against what is actually deployed. Confirm which SBOM formats your Trivy version emits and whether they match the format your supplier agreements require.

Framework mapping and assessment records

CISO Assistant (AGPL-3.0-only) ships more than 200 frameworks, including NIST CSF, ISO 27001 and NIS2, and runs audits and compliance assessments against them with automatic mapping between frameworks. For PM-30, it can hold the strategy document, link supply chain requirements to the CSF 2.0 subcategories that reference PM-30, and track findings and evidence for each assessment. Mappings it applies are a starting point, so have your assessor confirm each one before relying on it. Confirm the current framework list in the project README.

License caveats for the tools

All three tools are open source, but the license terms differ. Dependency-Track and Trivy are Apache-2.0, which permits internal use and modification with attribution. CISO Assistant is AGPL-3.0-only, which requires you to publish source code if you modify it and make it available to users over a network. Legal review should confirm whether your use triggers those obligations before the tool becomes part of a supplier-facing service. Any commercial support you buy is a separate contract from the license.

What a PM-30 supply chain risk strategy costs to meet

This table breaks the effort of meeting PM-30 into its cost components, showing who is paid for each, whether it is one-time or recurring, and what moves it up or down. No supplied figure gives a price or duration, so use the drivers and quote questions to compare written proposals and internal estimates.

Cost componentOne-time or recurringWhat drives it up or downWhat to ask for in a quote
Strategy authoring and approvalOne-time, then revised at reviewNumber of acquisition paths, system types and lifecycle stages covered; existing enterprise risk documents to build onNamed deliverables, who drafts versus who approves, and the review points included in scope
Supplier criticality reviewOne-time initial pass, recurring as suppliers changeNumber of suppliers and critical items; how much supplier evidence is already held in procurement recordsMethod for ranking suppliers, the list of suppliers in scope, and how new suppliers are added
Tooling and licensesRecurring where commercial tools are usedCommercial licenses and hosting versus self-hosted open-source tools; open-source tools remove license spend but still need staff time to runWhether any licenses, hosting or support subscriptions are included, and which components are self-hosted
Engineering time for SBOM generationRecurring with each release or procurement cycleNumber of systems and components, build pipeline maturity, and how many suppliers provide SBOMsWhich build pipelines are instrumented, the format of SBOM output, and how gaps in supplier SBOMs are handled
Recurring review and update effortRecurring at the defined review frequencyFrequency of organizational change, new regulations, and changes to the supplier baseReview cadence, who reviews, and how updates are logged and approved
External review or facilitationOptional, usually one-time per review cycleInternal familiarity with SCRM, independence needs, and the number of stakeholders involvedWhether the reviewer is independent of the implementation work and what evidence the reviewer will examine
Auditor samplingRecurring at each assessmentNumber of suppliers and strategy versions sampled; clarity of records showing the strategy was appliedWhich assessment objects the assessor will request and how long records must be retained

Who does what for PM-30: your team, a partner and the auditor

Your organization owns the supply chain risk management strategy itself. PM-30 asks for a strategy covering the development, acquisition, maintenance and disposal of systems, components and services, applied consistently and reviewed at a defined frequency. The decisions in that strategy are business and risk decisions, and they must be made, approved and recorded by people who are accountable for them.

  • Risk tolerance and priorities: Decide which suppliers, components and services are critical to your mission and how much supply chain risk you will accept for each.
  • Supplier decisions: Approve which suppliers you use, which contract terms you require and when you will exit a supplier.
  • Strategy approval and review: Assign an accountable senior official to approve the strategy and set the review frequency and triggers, such as organizational change.
  • Coordination with related controls: Align the strategy with risk management (PM-9), the component inventory (CM-8) and the SR family, so one strategy governs all of them.
  • Ownership of evidence: Keep the signed strategy, review records and decision logs under your own document control.

Before accepting any partner's draft, confirm that a named member of your staff understands it and can defend each decision in an assessment interview.

Where PM-30 programs usually fall short

PM-30 is easy to write down and hard to run. The gaps below recur in organizations that have a supply chain strategy on paper but cannot show it shaping purchases, builds, reviews or retirements. Each card names the gap, why it matters for the assessor, and the fix to check first.

Strategy document never approved or versioned

A supply chain risk management strategy stored as an unsigned draft gives an assessor nothing to test against the 'implemented consistently' expectation. Confirm that a named senior official approved the document, that it carries a version number and date, and that superseded versions are retained. Ask who holds the authority to change it and where the approval record lives.

No review trigger tied to change

PM-30 requires review and update at a defined frequency or as organizational changes require. Many programs set an annual calendar date and nothing else, so a new acquisition, a move to a different cloud provider or a major supplier failure never prompts a review. Define the events that trigger a review, such as mergers, new critical suppliers or a material incident, and record each review decision even when the outcome is no change.

Critical suppliers never identified

The enhancement on identifying suppliers of critical system components and services is the part most programs skip. Without a list, the strategy cannot say which suppliers receive enhanced scrutiny. Build the list from the system inventory and the component inventory, mark which items are critical to mission or security functions, and tie each supplier to a named owner who can produce its assessment evidence.

Strategy absent from acquisition and development

A strategy that procurement and engineering never see does not change outcomes. Check whether purchase requests, contract templates and secure development pipelines reference the strategy's requirements, such as provenance checks, notification clauses or software bill of materials delivery. Interview a recent buyer and a recent developer and ask them to point to the requirement that governed their last decision.

Disposal left out of scope

PM-30 covers the full lifecycle, including disposal of systems, components and services. Programs often stop at onboarding and never address how a supplier's access, data and components are retired. Add exit steps to the strategy: revoke supplier credentials, confirm data return or destruction, and record component removal from the inventory. Retain the records as evidence that disposal followed the strategy.

No link to risk and POA&M processes

A supply chain strategy that sits apart from the organization-wide risk management strategy under PM-9 and the POA&M process under PM-4 will not produce tracked remediation. Confirm that supplier risks appear in the enterprise risk register, that accepted risks have documented owners, and that open supplier findings enter the POA&M with milestones. Ask the program owner to show one supplier finding traced from identification to closure.

PM-30 questions buyers ask before bringing in help

How much effort does PM-30 take to implement?

PM-30 is a single organization-wide strategy, so the effort is mostly document and governance work rather than technical configuration. The main drivers are how many systems, components and services your organization acquires or develops, how many suppliers feed them, and how many functions must agree on the strategy: procurement, security, legal, risk, and the teams that build or operate systems. Expect effort to recur because the strategy must be reviewed and updated at the frequency your organization defines or when organizational changes require it. Ask any provider to break its estimate into drafting, stakeholder interviews, review cycles and the first review cycle after approval.

Can a small team write a PM-30 strategy in-house?

Often yes, if the team has someone who understands acquisition, supplier risk and enterprise risk management, and if leadership will approve and enforce the result. A small team usually needs help in three places: linking the strategy to existing enterprise risk and acquisition documents, which the assessment examines, agreeing responsibilities with procurement and system owners, and making sure the strategy is implemented consistently rather than sitting in a policy folder. Confirm internally who will be interviewed for the assessment, since PM-30 assessment work includes interviews with supply chain, acquisition and enterprise risk personnel.

How long does it take to produce an assessable PM-30 strategy?

No reliable duration applies across organizations, so ask for one that is tied to your scope. Timing depends on whether your existing enterprise risk management strategy (PM-9), acquisition processes and supplier assessments already exist and are current, how many approval layers the strategy needs, and how quickly stakeholders can meet. An organization that starts from documented acquisition and risk processes will usually move faster than one building them from nothing. Ask your provider to show the milestones and the approvals each milestone requires, and to state which of those depend on your staff rather than on the provider.

What does the organization need to provide for PM-30?

The organization owns the strategy and its decisions, so it must supply the people and information that make the strategy real. In practice that means:

  • A named executive sponsor who can approve the strategy and resolve conflicts between procurement, security and system owners.
  • Current acquisition, procurement and supplier onboarding procedures, plus the enterprise risk management documents the assessment will examine.
  • Access to the people who buy, build, maintain and dispose of systems, components and services, for interviews and review.
  • A list of systems and critical suppliers, so the strategy can be tested against real acquisitions instead of hypothetical ones.
  • A decision on the review frequency and triggers for updates.
Can an implementation partner attest that we comply with PM-30?

No. An implementation partner can help prepare the strategy, the supporting documents and the evidence, but only an independent assessor or auditor issues an assessment result or attestation. DeployOpen prepares systems, controls and evidence for compliance assessments and does not issue audit reports, attestations or certifications. Your organization remains responsible for its own controls and for deciding whether the strategy is adequate. When you select an assessor, confirm that they will test PM-30 against the SP 800-53A assessment procedures and will interview your personnel directly.

Which parts of PM-30 can we outsource?

Several parts can be delegated, but accountability for the strategy stays with your organization. Parts commonly outsourced include:

  • Drafting the strategy and aligning it with the related controls such as PM-9, SR-1 and SR-2.
  • Preparing evidence packages from procurement records, risk registers and existing documentation.
  • Building repeatable supplier identification and software inventory processes, for example using self-hosted tools such as OWASP Dependency-Track for SBOM tracking or Trivy for generating and scanning software bills of materials.
  • Preparing your team for assessment interviews.

Decisions about risk tolerance, supplier acceptance and sign-off should remain with named internal officials.

Does a NIST CSF or crosswalk mapping cover PM-30?

A mapping helps you see where PM-30 relates to other work, but it does not satisfy PM-30 by itself. NIST's OLIR catalog lists PM-30 as an informative reference for 14 CSF 2.0 subcategories, including supply chain subcategories such as GV.SC-01 and GV.SC-03 and risk subcategories such as GV.RM-03 through GV.RM-07. NIST marks its CSF 2.0 to SP 800-53 crosswalk as not comprehensive, so some CSF outcomes will not map cleanly to PM-30 and some PM-30 requirements may not appear in the crosswalk. Use the mapping to plan reuse of evidence, then test each PM-30 determination statement directly. Confirm the current mapping details in the NIST OLIR catalog before relying on them.

How DeployOpen prepares PM-30 evidence

DeployOpen helps organizations prepare the systems, documents and evidence that show a PM-30 supply chain risk management strategy is in place and followed. The organization owns the strategy and its decisions, and only an independent assessor can issue an assessment result.

How we scope

  • Engagements are fixed-scope, with the PM-30 deliverables, systems and supplier tooling agreed in writing before work starts.
  • Scope names the strategy documents, supplier records and acquisition processes that the written plan covers for PM-30.
  • Ongoing support and continuous testing are available as a retainer after the initial scope is delivered.

How we build

  • We help configure self-hosted tooling that records software components and supplier dependencies used across development and acquisition.
  • We map the strategy to the PM-30 determination statements so that each one has a documented owner and location.
  • We test the evidence pipeline so the strategy, inventories and review records can be produced on request.

How we hand over

  • Handover includes the configured tooling, runbooks and documentation the organization needs to operate the strategy.
  • Evidence packs list each PM-30 determination statement against its supporting document, interview record or tool output.
  • Assessors receive the material from the organization, which remains responsible for the strategy and its review cycle.

How we support

  • Support covers updates to the strategy when suppliers, acquisition routes or organizational structure change.
  • Retainers can include periodic reviews of supplier inventories and vulnerability findings linked to PM-30 records.
  • Ask us to confirm in writing which review frequency and support terms apply before the engagement begins.

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.

  • 30-minute call: free, with no obligation.
  • NDA on request: we can sign before you share details.
  • Clear next steps: a scope and plan after the call.