What PM-29 asks for and why assessors check it
PM-29 asks the organization to show that risk management is owned at executive level, not delegated to a technical team with no authority. If an agency, a federal contract or a FedRAMP-aligned program requires SP 800-53, the assessor will expect to see two things: a Senior Accountable Official for Risk Management who aligns security and privacy management with strategic, operational and budgetary planning, and a risk executive (function) that looks at risk across the whole organization and keeps the way risk is assessed consistent from one system to the next. The control addresses a familiar failure: individual system owners accept risks in isolation, budgets are set without reference to the risk picture, and no one can say how a finding in one business unit compares with a finding in another. PM-29 is hard to satisfy because the role has to be real, funded and documented. A name on an organization chart with no defined authority, no budget decisions on record and no evidence of actions taken will not pass.
PM-29 is an organization-wide program control. SP 800-53B places the Program Management family outside the low, moderate and high control baselines, so the control is not allocated by system impact level, and it is not part of the privacy baseline. Assessors therefore look for it once, at the organizational level, and then rely on it across systems. That makes the decision about who holds the role the first thing to settle. Confirm with your contracting office or authorizing body whether it expects the Senior Accountable Official to be a specific title or position, and whether it wants the appointment in writing. Then check that the person has actual authority over risk acceptance and resourcing, and that the risk executive function is documented with its policies and procedures. The independent assessor will interview the Senior Accountable Official and the chief information officer, so both must be able to describe the same risk picture and the same decisions.
Which organizational units and decisions PM-29 reaches
PM-29 is an organization-wide control, so its scope is the enterprise rather than any single system. The cards below cover the decisions that determine who holds the role, where the risk function sits, and which units and suppliers fall under one program. Settle these before drafting any appointment record or role description.
Choosing the Senior Accountable Official
The Senior Accountable Official for Risk Management must align security and privacy processes with strategic, operational and budgetary planning, so the role needs a executive with budget authority, not only technical standing. Assessors will examine the documentation of the appointment and the roles and responsibilities assigned, and they will interview the official. Confirm that the appointee can commit resources and that the appointment record names the duties in writing. Because the assessment method calls for interviews, the appointee should be able to explain the risk decisions made in the past year.
Positioning the risk executive function
The risk executive function analyzes risk from an organization-wide perspective and keeps risk decisions consistent across units. It may be staffed by the CIO, the CISO or a separate group, and the choice affects independence and who can challenge whom. Document where the function reports, how it interacts with the CIO and CISO, and who arbitrates when their views differ. Assessors will examine the establishment, policies and procedures for this function, so the reporting line should appear in those documents rather than only in an org chart.
Subordinate components and shared services
Business units, subsidiaries and shared service providers may each run their own risk processes. Decide whether they operate under one enterprise risk program with common thresholds, or whether each keeps local authority with defined escalation to the enterprise. Shared services that host several units are a common point of disagreement, because a risk accepted by one unit can affect others. Write down which units are in scope, how their risk decisions roll up, and how exceptions are recorded so that the organization-wide view remains complete.
Third-party and supply chain risk inputs
Risk decisions depend on what suppliers and external services contribute to the enterprise. PM-29 does not replace the supply chain strategy in PM-30, but the risk executive function should receive its outputs and the supplier risk findings that affect enterprise exposure. Confirm that supplier assessments, critical supplier concerns and open supply chain items reach the function on a defined schedule. Without that feed, the function can report a complete picture while missing the exposures that matter most.
Adjacent roles PM-2, PM-9 and PM-19
PM-29 is easily confused with the leadership roles in PM-2 (senior agency information security officer), PM-19 (senior agency official for privacy) and the risk strategy in PM-9. PM-2 and PM-19 assign program leadership for security and privacy, while PM-29 assigns the risk management leadership that spans both. PM-9 sets the risk management strategy that the leadership roles execute. Map each person to one role in writing and show how the three documents relate, so an assessor does not find overlapping or missing accountability.
Confirming the organization boundary
Because PM-29 is not allocated to any system baseline, the test is whether the organization has defined its boundary for the program. Confirm which legal entities, mission areas and environments the risk program covers, including cloud accounts and externally hosted services the organization relies on. Record exclusions with a reason and an owner. A boundary that leaves out a major environment will be difficult to defend in an assessment, even when the leadership roles themselves are well documented.
How an assessor tests PM-29 under SP 800-53A
This table maps the SP 800-53A assessment approach for PM-29 to the evidence an assessor examines and the people they interview. Read it as a checklist of what to have ready before an assessment, and use the CPRT entry for the exact determination statement wording.
| Assessment element | What the assessor does | Evidence to have ready | Where it usually fails |
|---|---|---|---|
| Determination statements (5) | Tests each statement separately using the examine and interview methods defined for PM-29 | A mapping from each statement to the document or interview that answers it | Teams assess PM-29 as one item and miss that each statement needs its own proof |
| Supply chain risk management strategy | Examines whether the strategy exists and is linked to the risk management program | Current supply chain risk management strategy with approval records and review dates | A strategy exists but does not reference the leadership roles or the risk executive |
| Appointment of the Senior Accountable Official for Risk Management | Examines the appointment record and the defined roles and responsibilities | Signed appointment document stating authority, scope and duties, including alignment with strategic, operational and budget planning | Appointment letters name a person but do not define responsibilities or budget involvement |
| Actions taken by the Senior Accountable Official | Examines documented evidence that the official acted on risk management responsibilities | Meeting minutes, decisions, budget inputs or risk acceptance records showing the official's actions | The role is appointed but no decisions or outputs are documented |
| Risk executive (function) establishment | Examines whether the function is established, with its policies and procedures | Charter or policy describing the function, its organization-wide scope and its procedures | The function exists in an org chart but has no written procedures or defined outputs |
| Interview: Senior Accountable Official for Risk Management | Asks how risk decisions are aligned with planning and funding, and how the official uses the risk executive function | Ability to walk through a recent decision with supporting records | Answers describe intent rather than examples from actual decisions |
| Interview: chief information officer | Asks how security and privacy risk reaches the official and how resources follow risk decisions | Examples of risk information passed to the official and how budget requests reflect it | The CIO and the official describe different reporting lines or priorities |
How to stand up the Senior Accountable Official and risk executive function
This sequence turns PM-29 from a policy statement into a working arrangement: a named Senior Accountable Official, a chartered risk executive function, a documented way to aggregate risk, and a recurring link between risk decisions and budget planning. Each step ends with an artifact an assessor can examine.
Confirm the executive who will hold the official role
Start by identifying the senior executive who will serve as the Senior Accountable Official for Risk Management. Confirm that this person has the authority to align security and privacy management processes with strategic, operational and budgetary planning, and that they are willing to act on risk decisions across the organization. Record the selection and the reasoning in the governance file. Done means the organization has a named executive, confirmed in writing by the people who appoint senior officials, and the assessor interview of that executive can proceed.
Write the appointment and role definition
Draft a formal appointment that names the Senior Accountable Official and states the scope of the role: the security and privacy management processes covered, the planning functions the official aligns with, and the decisions the official may make or must escalate. Pair it with a role definition listing responsibilities, reporting relationships and the resources the official controls. The appointing authority signs the document. Output: a signed appointment and role definition, stored with the other PM-29 evidence so an examiner can check the documentation of appointment, roles and responsibilities.
Charter the risk executive function
Establish the risk executive function as a documented body or role. The charter should list members, including the chief information officer and the leaders of security, privacy, and supply chain risk where they exist, define the reporting line to the Senior Accountable Official, and state how often the function meets. Confirm that the charter gives the function an organization-wide view rather than a view limited to individual systems. Output: an approved charter with a membership list and reporting line, which supports the examine method for the policies and procedures of the risk executive function.
Define how the function aggregates risk
Write the procedure the risk executive function uses to collect risk information from systems, business units and programs, then combine it into an organization-wide picture. The procedure should name the inputs (for example, system risk assessments, plans of action and milestones, supply chain risk findings and privacy risk results), the method for comparing them, and the rule for keeping risk decisions consistent across the organization. Output: a risk aggregation procedure with a sample register layout, which the function uses in each cycle and which an assessor can compare with the risk management strategy.
Set the cadence for the official's actions
Define a recurring schedule for the actions the Senior Accountable Official takes, such as reviewing aggregated risk, approving risk responses, and resolving conflicts between programs. Choose intervals that match the organization's governance calendar and record them in the charter or procedure. Confirm the interval with the official and the risk executive function, since the researched facts do not set a required frequency. Output: a published governance calendar tied to the appointment, so each action has a date and an owner.
Keep a decision log of official actions
Open a decision log that records each action the Senior Accountable Official takes on risk: approvals, accepted risks, escalations, and direction given to the risk executive function. Each entry should show the date, the decision, the supporting risk information and the owner of the follow-up. The log is the evidence that the examine method for documentation of actions taken by the official can be satisfied. Output: a maintained decision log with signed or dated entries, reviewed at the cadence set in the previous step.
Feed risk outputs into strategic and budget planning
Connect the aggregated risk picture to the organization's strategic, operational and budget processes. The Senior Accountable Official should present priority risks at the points where strategy and budget are set, and record which risk-driven requests were funded, deferred or declined. Ask the finance and capital planning owners to confirm how they receive these inputs. Output: planning inputs such as a risk-prioritized funding request summary and the budget decisions that followed, which show the official's alignment with planning in concrete terms.
Verify the arrangement before the assessment
Before an assessor arrives, walk the chain of evidence from end to end: the appointment, the charter, the aggregation procedure, the decision log and the planning inputs. Confirm that the official can explain the function in an interview and that the risk executive can describe the same procedure. Record gaps as items for the POA&M process. Output: a short evidence index for PM-29 that maps each assessment object to the document that satisfies it, ready for the assessor's examine and interview steps.
Evidence that passes PM-29 and how to keep it current
PM-29 is tested by examining documents and interviewing two officials, so the evidence is a set of records that show who holds each role, what they did and how their decisions reached budget and planning. The cards below cover each artifact an assessor is likely to ask for and the routine that keeps it accurate between assessments. Confirm the exact scope and format of each item with your independent assessor before collecting it.
Signed appointment for the Senior Accountable Official
The assessor examines documentation of the appointment of the Senior Accountable Official for Risk Management, so keep a signed appointment memo that names the person, states the authority granted and identifies the reporting line to the head of the organization. Check that the appointment dates match the period under review and that the name on the memo matches the person interviewed. When personnel change, issue a new appointment and archive the superseded one rather than overwriting it, so the history stays provable. Confirm with your assessor whether they expect a particular signatory or approval chain.
Role definitions and responsibilities
Documentation of roles and responsibilities shows how the Senior Accountable Official aligns security and privacy management with strategic, operational and budgetary planning. Write the responsibilities as specific duties, such as approving the risk management strategy, reviewing risk posture and directing resources, rather than general statements of oversight. Store the role definition under document control with a version number and review date. Confirm that the duties listed match what the official actually does, because interviews will test the difference.
Risk executive charter and procedures
The examine items cover the establishment, policies and procedures of the risk executive function, which analyzes risk from an organization-wide perspective. Keep a charter that states the function's membership, its authority to view risk across systems and business units, and how it keeps risk decisions consistent. Pair it with procedures that describe how risk data is collected, scored and escalated. Review the charter on a fixed schedule and after any reorganization, and record each revision with its approver.
Meeting minutes and decision records
Documentation of actions taken by the Senior Accountable Official is the strongest proof that the role operates in practice. Minutes of risk executive meetings, decision logs and signed risk acceptance records show who decided what and when. Record each organization-wide risk review with attendees, the risks considered, the decisions made and the owners of follow-up actions. Refresh the log at every review cycle instead of reconstructing it before the audit, because reconstructed minutes are easy to spot in an interview.
Supply chain risk management strategy reference
The examine list for PM-29 names the supply chain risk management strategy, so the risk executive's records should point to the current version of that strategy and show it being applied. Maintain a cross-reference in the risk register that links supply chain risks to the strategy section that governs them. Note the date of the last strategy review and any decisions that changed it. The strategy itself is a PM-30 artifact, so confirm with your assessor how much of it must be present in the PM-29 evidence package.
Budget and planning submissions
Alignment with budgetary and operational planning is shown through planning and budget submissions that carry risk decisions. Keep the submissions that requested funding for risk treatment, the approvals that followed and any cases where a requested item was deferred, with the reason recorded. Tie each submission to the risk review that justified it. Review these records at each budget cycle, since a submission that predates the current risk picture is weak evidence that planning is aligned.
How the official and the risk executive function work together
The Senior Accountable Official for Risk Management and the risk executive (function) divide one job: the function builds an organization-wide view of risk, and the official uses that view to decide where money, people and risk acceptance go. The function analyzes and consolidates risk arriving from individual systems, security and privacy programs, and third parties, so that a weakness in one system is compared against the same weakness elsewhere. The official then aligns that picture with strategic, operational and budgetary planning. In practice, the handoff is a recurring risk report that the function prepares and the official reviews, with each acceptance decision recorded against a named owner. NIST does not prescribe an organizational chart, reporting line or committee structure for either role, so the organization must define who holds each role, how the function gathers inputs, and how decisions flow back to system owners. Confirm that the chosen design is written down, that the official can show decisions made from the function's reports, and that the function's view covers third-party risk and not only internal systems.
The two roles also feed the governance outcomes that the NIST Cybersecurity Framework 2.0 describes. The OLIR crosswalk from CSF 2.0 to SP 800-53 Release 5.2.0 maps PM-29 to GV.RR-01 and GV.RR-02, which concern organizational leadership accountability for cybersecurity risk and the roles, responsibilities and authorities that support it. Assessors examining the control will look for these links in practice: documented appointment of the official, documented actions the official has taken, and documented establishment, policies and procedures for the risk executive function. Interviews with the official and the chief information officer test whether both can describe how risk reaches the official and how resourcing decisions follow. The crosswalk is marked by NIST as not comprehensive, so treat the CSF mapping as a starting point for your own governance evidence rather than a complete answer.
Two practical checks follow from this. First, ask whether the official can name the last three risk acceptance or resourcing decisions and point to the function report that supported each one. If the answer depends on memory or email threads, the process is not yet evidenced. Second, confirm that the risk executive function has written authority to request data from system owners and third-party managers, since a function without that access can only summarize what it is given. If an implementation partner prepares the risk reporting templates, the organization still owns the role assignments and the decisions. An independent assessor, not the partner, determines whether the arrangement meets the control.
What meeting PM-29 costs in money and effort
This table separates the cost components of PM-29 by who performs the work, whether the cost is one-time or recurring, and what pushes it up or down. Read it as a planning checklist for a governance-heavy control; NIST does not publish cost estimates, so any amount should come from your own quote or budget data.
| Cost component | Who carries the effort | One-time or recurring | What drives it up or down |
|---|---|---|---|
| Senior Accountable Official setup | Senior executive, with HR or legal for the appointment record | One-time | Whether an existing executive role is extended or a new appointment is created, and how many decisions must be documented |
| Senior Accountable Official oversight | Senior executive, supported by the risk function | Recurring | Frequency of budget and strategy reviews, and how many security and privacy programs must be aligned |
| Risk executive function setup | Risk, security and privacy leads defining policies and procedures | One-time | Number of business units and existing risk committees that can be reused rather than built from scratch |
| Risk executive staff time | Risk management staff analyzing risk across the organization | Recurring | Number of systems, third parties and supply chain relationships feeding risk data, and how well that data is already centralized |
| Documentation upkeep | Policy owners and the risk function maintaining records of appointments, actions and procedures | Recurring | Frequency of policy review, how many documents exist, and whether records are kept in a single controlled repository |
| Assessor time for interviews | Independent assessor interviewing the Senior Accountable Official and the CIO, plus document review | Recurring, per assessment cycle | Assessment scope, the number of interview sessions needed, and how quickly evidence is ready for review |
| Tooling and platform spend | Usually none specific to PM-29; shared risk registers or GRC tools may already exist | Recurring if new tools are bought | Whether existing risk registers and reporting tools can host the evidence, which keeps this cost low |
| Outside advisory support | Consultant or implementation partner preparing evidence and documentation | Usually one-time setup, optional recurring | Scope written in advance, existing governance maturity, and whether the work is limited to readiness or includes ongoing support |
Where PM-29 programs usually fall short
PM-29 is easy to satisfy on paper and hard to satisfy in practice. The gaps below share a pattern: the roles exist, but their authority, records and reach into decisions are thin. Each card names the gap and the closing step an assessor would expect to see.
Official appointed without defined duties
The organization names a Senior Accountable Official for Risk Management, but the appointment letter says little beyond the title. PM-29 expects the official to align security and privacy management with strategic, operational and budgetary planning, so the role needs written duties in those three areas. Check that the appointment record lists responsibilities, decision rights and the reporting line, and that the person interviewed can describe them in the same terms.
Risk executive function without a charter
Many organizations have people who review risk informally but no documented risk executive function. PM-29 asks for the establishment, policies and procedures of that function, and assessors examine them directly. Close the gap with a charter that sets membership, the organization-wide risk view it maintains, how it resolves conflicting risk positions and how often it meets. Record the decisions it makes so the charter is shown to operate.
No record of the official's actions
Assessors look for documentation of actions the Senior Accountable Official has taken, not only the appointment. Without minutes, signed decisions or approved risk strategy updates, the role cannot be shown to work. Keep a dated log of decisions on risk tolerance, resource requests, exceptions and escalations, with the artifact attached to each entry. This record also feeds the interview the assessor will hold with the official.
Risk views that never reach budget
Risk reports often go to a steering group and stop there, so planned security and privacy work is not funded on the basis of identified risk. PM-29 ties the official to budgetary planning, which means risk findings should appear in the investment process. Check whether the risk register, POA&M items and resource requests share a single list of priorities, and whether the CIO can trace a funding decision back to a documented risk.
Supply chain risk outside the function's scope
Supply chain risk is often handled by procurement or a separate team, which leaves the risk executive function blind to third-party exposure. The PM-29 assessment examines a supply chain risk management strategy, so that strategy must be visible to the function. Confirm that the charter includes supplier risk, that the function receives supplier assessment results and that open supply chain items appear in the organization-wide risk view.
Who owns the role, who prepares evidence, and who assesses it
The organization owns PM-29 in full. It must formally appoint a Senior Accountable Official for Risk Management, decide what authority that official holds, and decide how a risk executive function is staffed and positioned in the organization. These are governance decisions, and an assessor will look for evidence that senior leaders made them, not evidence that a consultant made them on their behalf. Risk acceptance also stays internal. When the organization decides to carry a risk, that decision belongs to the accountable people named in its own risk management strategy.
- Appointment decisions: The official is named by people with authority to make the appointment, and the record shows who signed it and when.
- Authority and resources: Leadership defines the budget, staffing and escalation rights the role carries.
- Risk acceptance: Decisions to accept, transfer, mitigate or avoid organization-wide risk are recorded by the accountable officials.
- Ongoing actions: The official's decisions, direction and reviews are performed and documented by the organization.
- Final sign-off: Approval of the charter and the risk executive procedures comes from senior leadership.
Confirm that each of these decisions has a named owner before any drafting begins.
An implementation partner can prepare the material the organization reviews and approves. DeployOpen prepares systems, controls and evidence for compliance assessments. It does not issue assessment results, attestations or certifications. In practice, a fixed-scope engagement might draft a charter for the risk executive function, write procedures for how risk is aggregated across systems, build evidence templates for the official's actions and organize the record of those actions so an assessor can find it quickly. Every draft remains the organization's document until its leaders adopt it.
- Charter drafting: Writing the proposed role description, reporting lines and scope for the risk executive function.
- Procedure drafting: Preparing the policies and procedures that the organization then approves and maintains.
- Evidence templates: Building forms for appointment records, meeting minutes and action logs.
- Record preparation: Organizing existing risk registers, governance minutes and decision logs into an assessable package.
- Gap review: Comparing the current program against the PM-29 determination statements and listing what is missing.
Ask any partner to put the deliverables, the sign-off owner and the scope in writing before work starts.
The independent assessor tests PM-29 using the procedures in SP 800-53A Rev. 5. For this control, those procedures use examine and interview methods. The assessor examines the supply chain risk management strategy, the documentation of the official's appointment, roles and responsibilities, the documentation of actions taken by the official, and the establishment, policies and procedures of the risk executive function. The assessor also interviews the Senior Accountable Official for Risk Management and the chief information officer. Only the assessor can report whether these determination statements are satisfied.
- Examination: The assessor reads the appointment record, the charter, the procedures and the action records.
- Interviews: The official and the CIO explain in their own words how risk is viewed and managed organization-wide.
- Consistency checks: The assessor compares what the documents say with what the interviews and records show.
- Findings: Gaps are reported in the assessor's own report, not in the partner's materials.
- Independence: The partner that prepared evidence should not also be the party that assesses the same evidence.
Before engaging an assessor, confirm their independence from the preparation work and ask how they plan to conduct interviews.
Interviews are often the step organizations under-prepare. The Senior Accountable Official and the CIO must be able to explain the role, the decisions they have made and how risk is aggregated across the organization without reading from a script. An implementation partner can run mock interviews that use the same questions an assessor is likely to ask, based on the SP 800-53A interview method. The purpose is to find gaps in understanding and records, not to coach answers. Mock interviews do not replace the assessor's interviews and do not produce any assessment result.
- Question preparation: Building question sets from the examine and interview methods in the assessment procedure.
- Record checks: Confirming that each answer can be supported by a document the assessor can see.
- Gap notes: Listing where the official's answers and the records disagree.
- Scheduling: Agreeing with the organization on who attends and what is recorded.
- Debrief: Reviewing the gaps with the organization and assigning owners to fix them.
Check whether the assessor allows any preparation sessions, and make sure the organization does not present rehearsed answers as its actual practice.
PM-29 questions buyers ask before hiring help
Does PM-29 apply to low, moderate or high baseline systems?
No. PM-29 is not allocated to the low, moderate or high baseline. SP 800-53B describes Program Management controls as deployed organization-wide, supporting the information security program and independent of any system impact level. PM-29 is also not in the privacy baseline. That means you will not find it in a system's security control selection, but your organization still needs the roles it describes. Confirm the allocation against the SP 800-53B baseline profiles and your agency or contract's own requirements, since a contract may ask for evidence of organization-level controls even when no baseline lists them.
How much effort does the PM-29 role take to fill?
The effort depends on how much risk management already exists. Filling PM-29 means appointing a Senior Accountable Official for Risk Management and establishing a risk executive function that looks at risk across the organization. For many organizations, the main work is writing down appointments, responsibilities and procedures, then running the risk function on a recurring cycle. NIST does not estimate this effort, so ask your assessor which artifacts they expect and ask any implementation partner to size the work from your current governance documents in a written scope.
Can our own staff implement PM-29 without outside help?
Usually yes, because PM-29 is mainly an organizational decision rather than a technical build. The appointment must come from senior leadership, and the Senior Accountable Official must be able to align risk management with strategic, operational and budget planning. Outside help is most useful for drafting the appointment records, role definitions and risk executive procedures, and for collecting the evidence an assessor will examine. Internal teams should confirm they have someone who can write the documents and someone who can run the meetings and decisions they describe.
How long does PM-29 setup take, and what drives it?
NIST does not set an implementation timeline for PM-29. Federal implementation schedules are left to OMB Circular A-130, and under FISMA, Inspectors General independently assess agency security and report to OMB. For most organizations the schedule depends on how quickly leadership makes the appointment, how many existing governance bodies the risk executive function must connect with, and whether policies already exist. Ask your agency or contract owner for the required date, and ask any partner to tie the plan to that date and to the decisions executives must make.
What does PM-29 need from executives?
PM-29 needs a named executive with the authority to align risk management with strategic, operational and budgetary planning. Executives must formally appoint the Senior Accountable Official, define that person's responsibilities and give the risk executive function a mandate to analyze risk across the organization and keep decisions consistent. The assessment procedure expects documentation of the appointment and of actions the official has taken, and interviews with the Senior Accountable Official and the chief information officer. Executives should expect to sign off on the appointment and the role definitions, and to attend the reviews that show the function working.
How does an implementation partner differ from an assessor?
An implementation partner helps your organization prepare: it can draft the appointment records, role definitions, risk executive procedures and the evidence set your team will show. It does not own the control or decide whether it is met. An independent assessor or auditor tests the control against the SP 800-53A procedures and issues the assessment conclusion. DeployOpen prepares systems, controls and evidence for compliance assessments, but it does not issue audit reports, attestations or certifications. Your organization owns the PM-29 decision, and the assessor you select owns the finding.
What should we ask for in a written quote for PM-29 help?
Ask for a written scope that lists the deliverables, such as the Senior Accountable Official appointment package, role definitions, risk executive procedures and the evidence index mapped to the assessment objects. Ask which items are one-time, such as drafting and setup, and which recur, such as periodic review and reporting. Ask what the organization must provide, including executive time, existing governance documents and access to stakeholders. Confirm the assumptions behind the timeline, the exclusions, and whether assessor fees are separate. DeployOpen does not publish a price list and quotes follow from the written scope.
How DeployOpen prepares PM-29 evidence
DeployOpen's role on PM-29 is to prepare, not to attest. Before any work starts, DeployOpen agrees the scope in writing, including which organizational units, risk registers and governance records are in view and who at the organization will approve each deliverable. Within that scope, DeployOpen drafts the working materials the organization needs: a charter for the risk executive (function), a written description of the Senior Accountable Official for Risk Management's responsibilities, procedures for how the risk executive analyzes risk across the organization, and an evidence package that maps each determination statement in SP 800-53A to the document that answers it. The organization owns the decisions, signs the appointment and approves the final wording.
DeployOpen then prepares the records an assessor will ask for, such as the appointment documentation, minutes or decisions showing actions the official has taken, and a dated register of how risk is reported upward and reviewed. Assessors interview the Senior Accountable Official for Risk Management and the chief information officer, so the reader should confirm that both people can explain the charter and the reporting line in their own words before fieldwork. DeployOpen does not issue assessment reports, attestations or certifications. An independent assessor or certification body makes those determinations, and the organization should confirm with its assessor which evidence format it accepts.
Costs for this work depend on the written scope, not on a fixed list. The reader should ask for a quote that separates one-time drafting from any recurring review of the charter and risk reporting, and that states who approves each deliverable and how many review rounds are included. DeployOpen does not estimate prices on this page; a quote follows from the written scope.