CP-11 Alternate communications protocols

CP-11 asks whether your organization has defined alternative communications protocols that keep operations going when primary channels fail. This page covers what an assessor tests, the evidence that passes, and what it costs to meet.

On this page

What CP-11 alternate communications protocols requires and why it is often missed

If you have been handed CP-11, the short answer is that it requires your organization to define alternative communications protocols and be able to use them to support continuity of operations. The control does not ask for a specific protocol or product. It asks you to decide which alternatives apply to your system, write that decision down, and show that the capability exists. The catalog entry for the control is in the NIST CPRT catalog for SP 800-53 Release 5.2.0, and it is worth reading alongside the assessment procedure before you scope any work. CP-11 has no control enhancements in Release 5.2.0, so the whole requirement sits in one control statement with a single organization-defined parameter. That parameter is the list of alternative protocols you commit to, and it is the first thing an assessor will check against your continuity documentation.

The reason this control is easy to misread is that a protocol switch is not a neutral act. Moving traffic from a primary protocol to an alternate can change how applications set up sessions, handle timeouts, retry requests or report status, and the catalog guidance explicitly warns that switching may affect applications and system operations. In practice, the risk is an unplanned switch during an outage that breaks a service which was never tested on the alternate path. Before you name a protocol, confirm with the application owners which features depend on the primary path, which of them break or degrade on the alternate, and who approves the switch. Those side effects belong in the plan, not in the outage bridge.

CP-11 is also outside the SP 800-53B baselines. Release 5.2.0 does not select it for the low, moderate or high baselines or for the privacy baseline, so it applies only when your organization adds it through tailoring or an overlay. Confirm whether your authorizing official, contract or regulator expects it before you treat it as optional. If it is selected, the evidence an assessor will request is the contingency plan and continuity of operations plan, the protocol list, and proof that alternate mechanisms work, which together map to the examine, interview and test methods in SP 800-53A.

Which systems and teams CP-11 applies to once it is selected

CP-11 is not in any SP 800-53B baseline and has no enhancements in Release 5.2.0, so its scope is set by decisions the organization makes. The cards below cover the systems and communication paths to examine, how the control gets added, and the outside carriers and providers that shape whether an alternate protocol can actually work.

Essential functions and their communication paths

Start from the essential functions named in the system contingency plan, then trace every communication path those functions depend on, including user access, machine-to-machine links, management channels and monitoring feeds. Record which paths carry data or commands that must keep flowing during a disruption. A path left off this list will not get an alternate protocol, so the inventory is the foundation for every later scoping decision. Ask the system owner to confirm the list against current architecture diagrams.

Baseline tailoring or overlay selection

CP-11 is absent from the low, moderate, high and privacy baselines, so an organization that wants it must add it deliberately. Decide whether it is added by tailoring a selected baseline or through an overlay that covers a class of systems, such as mission-critical or operational environments. Document the rationale in the system security plan so an assessor can see why the control is in scope. Confirm with the authorizing official or the governance owner who approves the tailoring decision.

Side effects on applications and operations

The control guidance notes that switching protocols may affect applications and system operations. Before any alternate protocol is introduced, the system owner should review which applications assume the primary protocol, which firewalls, proxies and load balancers handle traffic, and how monitoring and logging behave on the alternate path. Record the results of this assessment, because an assessor will look for it as evidence that side effects were considered.

Third-party carriers and service providers

Identify each carrier, internet service provider, managed network provider or cloud service that supplies the primary and alternate communication paths. Check whether they share physical routes, facilities or upstream providers, since a shared dependency can defeat the alternate protocol during the same outage. Ask each provider for its continuity commitments and the contract terms covering failover. Confirm these details with the provider in writing, because public descriptions of their architecture may not reflect your specific circuits.

Teams and roles that own the control

CP-11 touches several teams: contingency planning owners who maintain the plan, network engineers who configure the alternate protocols, application owners who test their behavior, and business continuity staff who decide when to switch. Assign one accountable owner for the control and name the contributors for each path. Clear ownership prevents the common gap where network teams build an alternate path that operations staff never learn to activate. Confirm these assignments in the contingency plan and the planning family records.

Pairing CP-11 with related controls

The catalog names CP-2, CP-8 and CP-13 as related controls. CP-2 covers the contingency plan that should describe when and how protocols switch, CP-8 covers alternate telecommunications services, and CP-13 covers alternative security mechanisms. Review these controls together so the alternate protocol, the carrier arrangements and the security posture on the backup path stay consistent. An alternate path that bypasses the primary security mechanisms creates its own exposure, so check that gap before approving the design.

How an assessor tests CP-11 under SP 800-53A

An assessor testing CP-11 works from a single determination statement in SP 800-53A Rev. 5, which asks whether the organization has defined alternative communications protocols that support continuity of operations. The assessment is built around three methods, examine, interview and test, and each one checks a different part of the answer. The determination is only met when the paper record, the people and the working mechanisms all line up, so a documented list of alternate protocols with no tested mechanism behind it will not pass.

The examine method looks at documents. The assessor will expect to see the contingency plan, the continuity of operations plan and a list of the alternative communications protocols the organization has chosen to support continuity. The useful question for your team is whether that list names specific protocols, the systems that depend on them, and the conditions under which switching is authorized. Because the catalog warns that changing protocols can affect applications and system operations, the examine evidence should also show that side effects were considered before the alternates were approved. Confirm this with your own contingency planning lead before the assessment begins, since the assessor will read the plan against what the systems actually do.

The interview and test methods check people and mechanisms. Interviews target personnel with contingency planning responsibilities and personnel with continuity of operations planning and implementation responsibilities, and the assessor will ask them how a switch would be decided and carried out. The test method looks at the mechanisms that employ the alternative protocols. Assessment objects in SP 800-53A are suggested, not mandatory, so an assessor may adjust them to your architecture, and you should ask at scoping which objects will be examined and whether a failover exercise will be accepted as test evidence.

What assessors ask for, which evidence they request and common findings

This table sets out how an SP 800-53A assessor approaches CP-11 through examine, interview and test methods, the evidence each method asks for, and where assessments usually stall. Read each row as a question the assessor will put to the system owner, and prepare the matching artifact before fieldwork begins.

MethodWhat the assessor asks to seeEvidence that passesCommon finding
Examine: contingency and continuity plansThe contingency plan and continuity of operations plan, and where they state that alternative communications protocols support continuityPlans that name the defined alternative protocols, the conditions that trigger switching, and the roles that authorize it, with a revision date and approval recordPlans describe continuity in general terms but never mention alternative protocols, so the organization-defined parameter has no visible value
Examine: list of alternative protocolsThe documented list of alternative communications protocols that support continuity of operationsA current list tied to the system boundary, showing each protocol, the systems or services that depend on it and the owner who maintains itThe list is missing, outdated after a network or provider change, or does not match the protocols the system can actually use
Interview: contingency planning personnelStaff with contingency planning and plan implementation responsibilities explain how and when the switch to an alternate protocol is madeConsistent answers from the interviewees that match the plan, the trigger conditions and the recorded roles, with named backups for each roleInterviewees describe a different trigger or sequence from the written plan, or do not know the alternate protocols exist
Interview: continuity of operations personnelStaff with continuity of operations planning responsibilities describe how continuity is maintained if the primary protocol failsAnswers that cover side effects the guidance flags, such as effects on applications and system operations, and how those effects were assessed before adoptionNo one can describe the side-effect assessment, so the organization cannot show it weighed application impact before introducing the alternate protocol
Test: mechanisms employing alternative protocolsTest records showing that the mechanisms using alternative protocols operate as the plan describesDated test records with scope, steps, observed results, defects and follow-up actions, linked to the contingency test program under CP-4No test record exists, or the test confirms a protocol is configured but never shows that traffic actually moves over it during a switch
Test: switching and fallback behaviorEvidence that the system switches to the alternate protocol and returns to normal operation when the primary recoversLogs or captured results from a controlled exercise showing both directions of the switch, with any application errors recorded and resolvedTests stop at the switch and do not check the return to primary, or application behavior after switching is not recorded
Examine: change records for protocol configurationChange tickets and configuration records for the alternate protocol mechanismsApproved changes that show who reviewed the side-effect impact before each protocol was introduced or modifiedProtocol changes are made directly in production without a recorded impact review
Examine: CP-11 parameter and tailoring decisionThe organization-defined parameter value and the decision record that selected CP-11 for the systemA documented selection rationale, approved by the authorizing official, that explains why CP-11 applies given the system's mission and baselineCP-11 is not in any SP 800-53B baseline, so the organization has no recorded decision to include it, and the assessor cannot see why it applies

How to implement CP-11 step by step

This sequence takes CP-11 from a tailoring decision to a tested, trained and documented alternate communications capability, with a recorded output at each step so an assessor can trace the control from plan to test result.

  1. Confirm CP-11 is selected through tailoring

    CP-11 is not selected in the low, moderate or high SP 800-53B baselines or in the privacy baseline, so the first decision is whether your system's risk assessment, mission requirements or an applicable overlay calls for it. The authorizing official or system owner records the decision in the system security and privacy plan, with the reason the organization needs continuity of operations through alternate protocols. Done means the tailoring decision exists in writing, is approved, and names CP-11 as an implemented control rather than an assumed one.

  2. Define the organization-defined parameter

    CP-11 has one organization-defined parameter, so the organization must name the alternative communications protocols it will use and state the conditions under which they activate. Contingency planning and continuity staff usually draft this with the network and application owners, listing each protocol, the services that depend on it, and the trigger, such as loss of the primary path. Done means the parameter is filled in with specific protocols and activation conditions, and the same values appear in the control implementation statement.

  3. Assess side effects on applications and operations

    The control's guidance notes that switching protocols can affect applications and system operations, so this step examines what changes when traffic moves to an alternate protocol. Application owners, network engineers and the service desk review timeouts, encryption and authentication behavior, firewall rules, monitoring visibility, throughput and any data formats that assume the primary protocol. Done means a written side-effect analysis lists each affected application or operation, the mitigation for it, and any items accepted as residual risk by the system owner.

  4. Document the alternate communications plan

    The alternate protocols and the switching procedure belong in the system contingency plan (CP-2) and the continuity of operations plan, which the assessor will examine. The document should state who decides to switch, how the switch is initiated and verified, how traffic is returned to the primary protocol, and which security controls still apply on the alternate path. Done means the plan is approved, distributed to the people who must use it, and cross-referenced to the side-effect analysis and the approved parameter values.

  5. Configure the alternate protocol mechanisms

    Engineering teams build the alternate communications mechanisms in the environment the organization controls, such as secondary network paths, alternate messaging channels or protocol fallback settings in applications and gateways. Each configuration should be recorded in the baseline or configuration management system, with the encryption and access controls that apply to it. Done means the mechanisms are deployed, their configuration is captured in version-controlled or change-managed records, and an inventory lists every alternate path with its owner.

  6. Test the switchover and record the results

    The assessor's test method for CP-11 covers the mechanisms that employ alternate protocols, so the organization should run a controlled switchover to each alternate path and observe whether the defined services keep operating. Testing should be coordinated with contingency plan testing under CP-4 and should capture the time taken, failures, and the side effects predicted in step three. Done means a test record shows the scenario, the result for each service, the defects found, and the corrective actions assigned with owners and dates set by the organization.

  7. Train personnel and retain the evidence

    Personnel with continuity or contingency responsibilities need to know when and how to switch protocols, which the assessor checks through interviews. Training can be delivered through the contingency training process (CP-3), with attendance and role confirmation kept as records. Before the assessment, the organization should gather the approved parameter, side-effect analysis, plan, configuration records, test results, training records and corrective action log in one evidence set. Done means each responsible person can describe the switching steps, and the evidence set maps each element of the control to a document an independent assessor can examine. Ask your assessor which evidence format they prefer before you assemble it.

Why switching protocols can break applications and how to test for it

The catalog guidance for CP-11 cautions that switching to an alternate communications protocol may affect applications and system operations, so the side effects must be assessed before an alternate protocol is introduced, not discovered during an outage. A switch that keeps packets flowing can still break the application above it. Start with dependency mapping: list every service, batch job, integration, monitoring agent and client that depends on the primary protocol, including the ports, certificates, proxies, load balancers and firewall rules they rely on. Confirm which of those dependencies are hard-coded to the primary path and which can be redirected without code changes. Ask the owners of each dependency to confirm the behavior they expect when the alternate path is active.

Next, test performance and session behavior on the alternate path under realistic load. Measure latency, throughput, retry behavior and timeout settings, and check how existing sessions, tokens and connection pools behave when traffic moves mid-session. Many failures appear only when a long-running transaction crosses the switch, so include that case in the test plan. Assess the security control impact on the alternate path as well: confirm that encryption, authentication, logging and inspection controls still apply at the same level, because an alternate route that bypasses monitoring can create a gap that an assessor will find. Document what changes, what does not and who approved the difference.

Finally, define and rehearse rollback. Record the criteria that trigger a switch back to the primary protocol, the steps and the people who execute them, and the order in which dependencies are restored. Confirm the rollback in a non-production environment and keep the results as evidence. Its relationship to CP-2 (the contingency plan that defines the recovery steps and roles) and CP-8 (alternate telecommunications services for resuming essential operations) is worth reviewing in the same exercise, since the catalog lists both as related controls for CP-11. Confirm with your assessor how they expect those links to be documented, because the catalog names the relationship but does not set a mapping.

Evidence that satisfies CP-11 and how to keep it current

An assessor testing CP-11 looks for a written record that alternative protocols are defined, configured, tested and understood by the people who would use them. The cards below cover the artifacts that prove this and the routines that keep them accurate between assessments.

Contingency and continuity plan sections

The contingency plan and continuity of operations plan are the first documents an assessor opens for CP-11. The relevant sections should name the alternative communications protocols, state the conditions that trigger switching to them, and identify who authorizes the switch. Check that the plan refers to the same protocol list used in configuration records, so the documents do not contradict each other. Plan sections are also where the side effects on applications and system operations should be recorded before a protocol is introduced.

Register of alternative protocols

A maintained register lists each defined alternative protocol, the systems and services that depend on it, the organization-defined conditions for using it, and its owner. Assessors compare this register against the plan and the systems in the boundary. Confirm that each entry records known side effects on applications, since the control guidance expects those effects to be assessed before a protocol is adopted. A register without owners or dates usually fails review.

Configuration and runbook records

Configuration exports and step-by-step runbooks show that a defined protocol can actually be enabled and reverted. Keep records of the network, gateway or messaging settings for each alternative path, along with the commands or change steps used to activate it. Where the platform is self-hosted, configuration files kept under version control give a dated history of what was set and when. Ask whether the runbook has been used in a drill, because an untested runbook is weak evidence.

Test results and corrective actions

Test records for CP-11 show that switching protocols worked under defined conditions and that the team measured the outcome. Record the test date, scope, the protocol exercised, the observed effect on applications and any defects found. Each finding should carry a corrective action with an owner and a closure date. Test results are most useful when they feed back into the register and the runbook, so that the next exercise starts from a corrected state.

Training and interview readiness records

Assessors interview personnel with contingency planning and continuity responsibilities, so training records must match the people named in the plan. Keep attendance and completion records for protocol-switching procedures, and note which staff have operated the alternative path during an exercise. Confirm that the people who would authorize a switch know the trigger conditions and the escalation path. If staff changed roles, update the records before the next interview, not after.

Change records and periodic review

When an alternative protocol is added, removed or reconfigured, the change record should link the update to the plan, register, runbook and affected systems. Keep a review log showing that the protocol list was checked on a schedule and after significant system changes. Scheduled test cycles should be defined in the plan itself, with the frequency stated, so that the evidence trail shows the organization following its own timetable. Ask your auditor which review cadence they expect to see in your documentation.

What meeting CP-11 costs in money and effort

This table breaks down the cost and effort components of implementing and evidencing CP-11 Alternate communications protocols, showing who is paid, whether each cost is one-time or recurring, what drives it and how to keep it down. No supplied fact gives a price or duration, so use the table to frame what to request in a written quote, and confirm each figure with the vendors, providers and assessor involved.

Cost componentOne-time or recurringWhat drives itHow to keep it down
Tooling or licensesRecurring where subscriptions applyCommercial communications, messaging or radio management products that the organization selects as alternate protocols; self-hosted open-source options can remove license spend but still need hostingChoose protocols already supported in the environment, use self-hosted open-source components where they meet the defined requirement, and ask for license terms by year in the quote
Engineering time for protocol design and configurationOne-time, with periodic revisionNumber of defined alternative protocols, how many applications depend on the primary protocol, and the side effects on application and system operations that the control guidance asks organizations to assess firstLimit the protocol list to what continuity of operations needs, document the design once, and reuse configuration patterns across systems
Testing effortRecurring at each defined test cycleNumber of mechanisms that employ alternative protocols, which the SP 800-53A test method examines, and whether tests run in production-like or live conditionsScript repeatable switchover tests, align them with contingency plan exercises already scheduled under CP-4, and scope tests to the defined protocols
Evidence upkeepRecurringCurrency of the contingency plan, continuity of operations plan and the list of alternative protocols, plus records of changes to protocols and related systemsKeep the protocol list under configuration control, generate evidence from the same tooling used for operations, and assign one owner for updates
Staff time for interviews and rolesRecurringNumber of personnel with contingency planning and continuity of operations responsibilities, who the assessor will interview and the training they needMaintain a current roster of responsible roles, cross-train staff, and prepare a short walkthrough of the protocol switchover
External testing or reviewRecurring or per engagementScope of independent testing, whether the review covers only CP-11 or the wider contingency program, and the depth of the switchover testAsk for a fixed-scope engagement that names CP-11 explicitly, and reuse results from other contingency testing where scope overlaps
Auditor or assessor samplingPer assessment cycleAssessment method and the number of systems and protocols sampled, as set by the assessing organization rather than NISTPrepare consistent evidence for each system before the assessment, and confirm the sampling approach with the assessor in advance

Who owns CP-11, what a partner prepares and what the auditor tests

Your organization owns CP-11. That means it decides which communications protocols are needed for continuity of operations, which alternatives are defined as the organization-defined parameter, and which side effects on applications and system operations are acceptable. Those decisions belong to the business and its risk owners, not to a vendor or consultant. The contingency plan and continuity of operations plan are internal documents, so the same team that runs them must be able to explain why each alternative exists.

  • Defining the parameter: Name the alternative protocols and the circumstances in which they are used, and record the approval.
  • Owning side-effect decisions: Accept or reject the impact on applications that the control guidance asks you to assess before adoption.
  • Assigning people: Name the staff with contingency planning and continuity responsibilities, since assessors interview them.
  • Keeping the plan current: Update the continuity documents when protocols, network paths or providers change.
  • Holding the evidence: Retain the list of alternative protocols and test records where the assessor can request them.

Check that someone inside the organization can answer, without preparation, why each alternative protocol was chosen and who authorized using it.

Where CP-11 programs usually fall short

CP-11 looks simple on paper: name an alternate protocol and be able to use it. In practice, most gaps appear between the plan and the people or systems that must carry traffic when the primary path fails. The cards below cover the places assessors and incident responders most often find those gaps, with a closing action for each.

Alternatives that are never defined

Many plans say that alternate communications will be used during a disruption without naming the protocols, the channels they run over, or the conditions that trigger a switch. CP-11 asks for defined alternative protocols that support continuity of operations, so an assessor will look for a written list tied to specific systems and missions. Check that each essential function has at least one named alternative, the owner of that channel, and the trigger that moves traffic onto it. Action: publish the list as a controlled document and reference it from the contingency plan.

Protocols never tested end to end

Teams often confirm that a backup channel exists by checking that its service is configured, but never send real traffic through it from the systems that depend on it. The SP 800-53A test method for CP-11 looks at the mechanisms that employ alternative protocols, so an untested path counts as a gap. Check that test records show the full route, from the originating application through the alternate protocol to the receiving party, under realistic conditions. Action: schedule an end-to-end exercise and keep the results with the contingency plan test records.

No side-effect assessment before switching

The CP-11 guidance notes that changing protocols can affect applications and system operations. A switch that restores messaging may break authentication, logging, time synchronization or message ordering in a downstream system. Few programs document these effects before an incident forces the change. Check whether each alternate protocol has a recorded impact review covering the applications it touches, their data flows and any security controls that depend on the primary protocol. Action: complete a written impact assessment for each alternate before it is approved for use.

Plans naming protocols no one can operate

A plan may list an alternate protocol that only one retired engineer knew how to configure, or a service whose licenses, keys or accounts have lapsed. When the disruption comes, the protocol exists on paper but no one can run it. Check that each named alternative has current configuration instructions, credentials held in a controlled store, and at least two trained operators outside the team that owns the primary system. Action: review each alternative for operator coverage and access continuity at the same interval as the plan review.

Interview readiness for contingency roles

Assessors test CP-11 by interviewing the personnel responsible for contingency planning and for continuity of operations planning. Their answers must match the written plan and the actual configuration. Gaps appear when the people in these roles cannot explain why a protocol was chosen, who authorizes the switch, or how service is restored afterward. Check that role holders can describe the trigger, the decision owner and the fallback steps without reading from the document. Action: run short, recorded walkthroughs with each role holder and file the results with the training records.

Alternates outside the organization's control

An alternate channel that depends on a single provider, or on a service the organization does not administer, may fail in the same event that takes down the primary. The CP-11 control does not prescribe providers, but the related controls CP-8 and CP-13 raise the same question about separation and alternative mechanisms. Check whether each alternate has a different failure domain from the primary, whether its provider contract covers the disruption scenarios in the plan, and who administers it. Action: document the dependency map for each alternate and confirm the provider terms with the vendor in writing.

Questions buyers ask about CP-11 cost, effort and outside help

Is CP-11 required by default in NIST SP 800-53?

No. CP-11 is not selected in any SP 800-53B baseline: low, moderate, high or privacy. An organization adds it when its own risk assessment, a contract, an authorizing official or a tailored baseline calls for alternate communications protocols. The control has no control enhancements in Release 5.2.0, so the work is one defined capability with one organization-defined parameter. Confirm with the authorizing official or contract owner whether CP-11 is expected in your authorization boundary before planning any work on it.

How much effort does it take to meet CP-11?

The effort depends on how many alternate protocols the organization defines and how many systems depend on them. The control itself is short, but the work behind it is not: you must define the protocols, decide which essential operations they support, and assess side effects on applications and system operations before introducing them. SP 800-53A assesses CP-11 with one determination statement and the examine, interview and test methods, so an assessor will want a contingency plan entry, a list of alternate protocols, interviews with contingency and continuity staff, and a test of the mechanisms. Ask any provider to estimate effort against your system inventory and written scope, not against a generic figure.

Can our team implement CP-11 without outside help?

Often, yes, if you have staff who understand your communications paths, your contingency plan (CP-2) and your testing cycle (CP-4). The main risk is not technical complexity but the assessment: an alternate protocol that has never been exercised produces weak evidence. Outside help is most useful for defining the protocol list, building a tested fallback path on self-hosted platforms, and producing the test records an assessor will examine. Decide early whether you want an implementation partner to prepare the systems and evidence, or whether internal staff can own the work end to end.

What does a partner do for CP-11, and what does the auditor do?

The organization owns the control, the protocols and the decision to accept any side effects. An implementation partner, such as DeployOpen, can plan, configure, document and test self-hosted alternate communications paths inside your own infrastructure and prepare the evidence. DeployOpen prepares systems, controls and evidence for compliance assessments; it does not issue audit reports, attestations or certifications. Only an independent auditor, assessor or certification body issues those conclusions, and they test the control against the SP 800-53A procedures themselves.

What drives the cost of meeting CP-11?

Cost follows scope. The main drivers are the number of alternate protocols defined, the number of systems and essential operations that rely on them, how much of the path must be built or reconfigured, the depth of side-effect analysis, and how often tests must be repeated. Some costs are one-time, such as design, configuration and first testing. Others recur, such as retesting after changes, reviewing the protocol list and keeping the contingency plan current. NIST does not estimate compliance or certification costs, so ask providers for a fixed-scope quote with the scope, deliverables and timeline written out before work starts.

What evidence should we prepare to show CP-11 works?

Prepare an entry in the contingency plan that names the alternate communications protocols and the operations they support. Keep the list of protocols in a controlled document, along with records of the side-effect assessment that was completed before introduction. For the test objects, keep dated test records showing the mechanisms were exercised, what was observed, and what was corrected. Interview evidence comes from the people with contingency planning and continuity responsibilities, so make sure their roles are written down. Confirm the exact evidence expectations with your assessor before testing, because the SP 800-53A procedures are the baseline they will use.

Does CP-11 map to the NIST Cybersecurity Framework 2.0?

Not in the NIST crosswalk. NIST's OLIR crosswalk from CSF 2.0 to SP 800-53 Release 5.2.0, posted 17 November 2025, does not list CP-11 against any CSF 2.0 subcategory, and NIST marks the crosswalk as not comprehensive. Do not assume a CSF subcategory covers CP-11 because the topic sounds similar. If your program maps controls to CSF, document the mapping yourself, state its basis and confirm it with your assessor.

How DeployOpen scopes and prepares CP-11 evidence

DeployOpen works on CP-11 as a fixed-scope implementation engagement inside your own infrastructure. We prepare the alternate communications protocols, the supporting plan content and the test evidence an independent assessor will examine, while your organization keeps ownership of the control and its decisions.

How we scope

  • Agree in writing which systems, sites and communication paths the CP-11 scope covers before work starts.
  • Confirm with you which alternate protocols are defined, and which organization-defined parameter values you will adopt.
  • Identify side effects on applications and system operations that must be assessed before any protocol switch is introduced.

How we build

  • Configure the defined alternative communications protocols on the self-hosted platforms within your cloud accounts, data centers or air-gapped networks.
  • Document how the protocol switch is triggered, who authorizes it and how operations return to the primary path.
  • Run functional tests of the alternate mechanisms and record the results for the test evidence an assessor will request.

How we hand over

  • Deliver the list of alternative protocols, the continuity of operations content and configuration records as named documents.
  • Map each artifact to the CP-11 examine, interview and test objects so your assessor can trace evidence without guesswork.
  • Brief the personnel with continuity and contingency responsibilities so they can explain the protocols during interviews.

How we support

  • Offer ongoing support, upgrades and continuous testing of the alternate protocols as a retainer, if your program needs it.
  • Review the protocols and evidence again after significant system changes, so the documentation keeps matching the running system.
  • Confirm with your independent assessor which evidence formats and test records they expect before the assessment begins.

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.

  • 30-minute call: free, with no obligation.
  • NDA on request: we can sign before you share details.
  • Clear next steps: a scope and plan after the call.