NERC CIP violations and enforcement

What happens when a CIP requirement is missed: penalties under the Sanction Guidelines, Self-Reports and self-logging, Compliance Exceptions and FFT, Mitigation Plans, and Technical Feasibility Exceptions for requirements that cannot be met as written.

NERC CIP penalties: how fines are calculated

How NERC and Regional Entities set CIP penalties: the risk factor and severity table, entity size, risk, duration, aggravating and mitigating factors, settlement credit, the statutory maximum, and when findings become public.

How to self-report a NERC CIP violation

When and how to self-report possible CIP noncompliance: what a Self-Report contains, the timing that earns penalty credit, and the likely outcomes, from Compliance Exception and FFT to a Mitigation Plan.

NERC CIP self-logging program

How CIP self-logging works: eligibility after a formal review of internal controls, what the log must contain, the presumption of Compliance Exception treatment, how often the Regional Entity reviews logs, and how it differs from Self-Reports.

Writing a NERC CIP Mitigation Plan

What a CIP Mitigation Plan must contain, submission deadlines, milestone spacing, review and deemed acceptance by the Regional Entity and NERC, deadline extensions for outages, and how repeat violations with the same root cause raise penalties.

Compliance Exceptions and FFT for NERC CIP noncompliance

The lighter resolution paths for CIP noncompliance: which risk levels qualify for Compliance Exceptions and Find, Fix, Track and Report, what each requires, how they affect compliance history, and how self-logging feeds them.

NERC CIP Technical Feasibility Exceptions (TFE)

When a CIP requirement cannot be met as written: which requirements are TFE-eligible, the grounds for approval, compensating measures, the 60-day review, how many entities hold TFEs, and how 'per system capability' replaces TFEs from 2028.

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.

  • 30-minute call: free, with no obligation.
  • NDA on request: we can sign before you share details.
  • Clear next steps: a scope and plan after the call.