What Article 11 technical documentation asks providers to prove
A provider preparing a high-risk AI system for the EU market needs its technical file ready before the system is placed on the market. Article 11(1) requires that documentation to be drawn up before placing on the market or putting into service, kept up to date, and capable of demonstrating that the system meets the requirements of Section 2 of Chapter III. At a minimum, the file must contain the elements listed in Annex IV. The point of the file is simple: a market surveillance authority, a notified body where one is involved, or a buyer cannot judge a system they cannot inspect. The documentation is the provider's way of showing, in writing and on request, how the system was built, how it was tested, what risks were identified and how they are controlled. If a provider cannot produce the file, it cannot credibly claim compliance, whatever the system does in practice.
The file is hard to assemble because the evidence does not live in one place. Intended purpose and performance metrics sit with product and engineering, training and validation data provenance sits with the data team, risk decisions sit with the risk owner, and declarations and standards mapping sit with legal or compliance. Logs, monitoring dashboards and incident records sit with operations. Each of these sources changes with every retraining, configuration change or release, so a file written at launch can be wrong within weeks. Before the first release, confirm who owns each Annex IV element, which system of record holds it, and how a change in one source triggers an update to the file.
A practical starting point is to decide where the file lives and how it is versioned. A wiki or document store with version history, such as the open-source tools covered later on this page, can record what changed, when and by whom, and allow a reviewer to compare two versions. Ask any tooling vendor or implementation partner to confirm how it handles access control, retention and export before relying on it. Retention matters too: the Act requires the documentation to be kept available to national competent authorities for 10 years after the system is placed on the market or put into service, so the storage plan must outlast the product.
Which systems and roles must hold a technical file under Article 11
Article 11 places the technical file on the provider of a high-risk AI system, not on the deployer. The cards below cover the scoping decisions that determine who owns the file, which documentation route applies, and when the obligation starts, so you can confirm your position before you plan the work.
Providers of Annex III systems
If you develop an AI system, or have one developed, and place it on the EU market under your own name or trademark, you are the provider and must draw up the technical file before placing it on the market or putting it into service. Annex III systems, such as many HR, credit and education uses, follow the internal-control route in most cases, so the file is your main evidence for the conformity assessment you run yourself. Confirm the Annex III category that matches the intended purpose, because the file must describe that purpose.
Providers of Annex I product systems
When the AI system is a safety component of a product covered by the EU harmonisation legislation listed in Annex I, the AI file must sit alongside the sectoral product documentation. Check whether your product already has a technical file under its own legislation, because that file is the natural home for the AI elements. Confirm which Annex I legislation applies and whether a notified body is involved in that product's conformity assessment.
Single documentation for Annex I Section A
For systems related to the Section A products in Annex I, Article 11(2) allows one combined set of technical documentation that covers both AI Act and sectoral information, so you do not maintain two parallel files. The combined file must still demonstrate the Section 2 requirements and contain the Annex IV elements. Ask your notified body or sectoral authority how they expect the combined file to be structured before you start mapping headings.
Simplified form for small providers
The 2026 amendment lets SMEs, start-ups and small mid-cap enterprises provide the Annex IV elements in a simplified manner using a Commission form, and notified bodies must accept that form. Size status drives eligibility, so confirm your headcount and turnover against the SME and small mid-cap definitions that apply to your group, including linked or partner enterprises. A group member above the threshold may change the answer.
Deployers supply inputs, not the file
Deployers do not own the technical file, but they hold facts the provider needs, such as the actual deployment context, input data characteristics, human oversight arrangements and operational incidents. Agree in your contract which inputs you will supply, in what format and on what schedule, and who keeps the logs that feed the file. If you customize or substantially modify a system, check whether that change moves you into the provider role.
Confirm classification and size before planning
Before committing budget, write down the intended purpose, the Annex III or Annex I category it falls under, your role for each system, and your size status. Mistakes in these four facts change the documentation route, the deadline and the evidence you must produce. Use your legal or compliance team to confirm the classification, and record the decision so an assessor can see how you reached it.
What each of the nine Annex IV headings needs to contain
What does the general description section of the technical file cover?
It describes what the system is, who it is for and how it is meant to be used, and it is the first section an assessor reads to understand the scope of everything else. Product, compliance and engineering staff usually write it together. It typically records the provider's name, the system version, the intended purpose, the deployment context, the categories of users and affected people, the hardware and software the system runs on, and the forms in which it reaches the market, such as an API, an embedded module or a downloadable package. Useful source documents include the product requirements, the marketing claims reviewed by legal, architecture diagrams and the instructions for use. Keep the stated intended purpose identical to the one used in the Article 9 risk assessment, because a mismatch between the two is an early finding. Every later section depends on this description.
What goes into the elements and development process section?
It explains how the system was built and which design choices were made, with enough detail to show that the Section 2 requirements were considered during development. Engineering leads usually document the development methods, design specifications and system architecture, the data sources and data governance steps for training, validation and testing data, any pre-trained or third-party components, the computational resources used, and the validation and testing procedures with their results. Sources include design records, architecture decision records, data lineage records from the Article 10 work, model documentation, training logs and test reports. Link it to Article 10 for data governance and to Article 15 for accuracy and robustness claims, since those claims must trace back to the tests recorded here. For components supplied by an outside party, record what the supplier provided and what you verified yourself. Confirm the expected depth with your assessor or notified body before you start writing, because it varies with the system.
What does the monitoring, functioning and control section require?
It describes how the system behaves in operation and which human oversight and control measures are built in, so an assessor can see how people can intervene. Typical content includes the system's capabilities and limitations, the persons or groups it is intended for, the expected accuracy for those groups, known risks to health, safety and fundamental rights, the oversight measures and how they are designed, and the technical means used to help people interpret outputs. Sources include the human oversight design, interpretability documentation, the instructions for use and the logging design. This section links directly to Article 12 (record-keeping), Article 13 (transparency toward deployers) and Article 14 (human oversight), so draw it from those articles and keep the two in step. Confirm with your compliance lead which oversight measures sit in the product and which are assigned to deployers.
How should performance metrics be documented for a high-risk AI system?
Document the metrics you chose, why each one suits the intended purpose, the levels you measured, and the limits those measurements reveal, so a reader can judge whether each metric is appropriate. Typical content includes metric definitions, test datasets and test conditions, results broken down by relevant subgroups, the thresholds that trigger action, and a statement of which metrics were considered and set aside, with reasons. Source material includes evaluation reports, test plans, validation records and the accuracy declarations that appear in the instructions for use. Connect each metric to the Article 9 risk management system and to the accuracy requirements in Article 15, so a reader can follow a risk from identification through to the test that measured it. Metric selection is a judgment that domain experts should make, and the file should record who made it and on what basis. Ask your assessor which level of subgroup analysis they expect before testing begins.
How does the risk management system section connect to the rest of the file?
It summarizes the risk management system required by Article 9, showing how risks were identified, estimated, mitigated and reviewed across the system's lifecycle. Risk owners usually document the risk register, the hazard and harm analysis, the decisions on acceptable residual risk, the testing against predefined metrics, the review schedule and the approval history. Sources include the risk register, threat models, incident and feedback records, post-deployment monitoring data and the security test results covering AI-specific attacks. This section is the spine of the file, because almost every other heading points back to it. Keep risk identifiers stable and cross-reference them throughout. Write the summary as an index into the full risk records, and keep those records complete. If the organization manages the process in an internal wiki or document system, confirm that the version history can show who approved which residual risk and when.
What belongs in the lifecycle changes and harmonised standards sections?
The lifecycle changes section describes every modification made after the system was first placed on the market. The harmonised standards section lists the standards applied, or explains the alternative solutions used where none were applied. Engineering and quality staff usually maintain the change log, recording version numbers, the reason for each change, its assessed effect on compliance and whether a new conformity assessment was needed. For standards, record the identifiers and versions you applied, the parts you applied, and the justification for any gaps. The first harmonised standard, EN 18286:2026 on quality management, was cited in the Official Journal on 14 October 2026. Check its applicability to your system against the Commission Implementing Decision (EU) 2026/2274 before you rely on it, and keep a dated record of that check.
Does the file need a copy of the EU declaration of conformity and a post-market plan?
Yes. The file must include a copy of the EU declaration of conformity, and the post-market monitoring system and plan form part of the Annex IV documentation under the amended Article 72(3). The provider issues the declaration, which states that the system meets the Section 2 requirements, and compliance staff keep a signed copy with a record of the conformity assessment route used. For most Annex III systems that route is internal control under Annex VI. The post-market plan describes how performance data is collected from deployed systems, how incidents and corrective actions are handled, and who reviews the findings. Sources include field monitoring data, complaint and incident records and the plan itself. Keep the file current, since Article 11 requires it, and retain it for 10 years after placing on the market under Article 18(1). Confirm with your legal advisers how signatures and version history will be managed.
How an assessor tests the technical file
This table sets out four test areas an notified body or market surveillance authority is likely to apply to an Article 11 file, the evidence each one asks for and the findings that most often delay a review. Read it as a pre-submission checklist: each row names what the assessor expects to see and where files usually fall short.
| Test area | Evidence the assessor requests | Common findings |
|---|---|---|
| Completeness against Annex IV | A file index mapped to the nine Annex IV headings, with a pointer to the document for each | Headings missing, or a general description that does not match the system as deployed |
| Currency against version history | Dated revisions, the lifecycle change log and the version each document describes | No lifecycle change records after a model retrain, or documents still describing an earlier release |
| Consistency with the deployed system | Reproducible test results, metrics definitions and production monitoring data for the same version | Declared metrics that do not match production monitoring, or test data that cannot be traced to the release |
| Declaration and conformity link | A copy of the EU declaration of conformity tied to the version placed on the market | Declaration of conformity that refers to an outdated version or an incorrect system name |
| Post-market monitoring plan | The plan included in the file, with records showing it is being run | Plan present on paper but no monitoring records, or no link to incident handling |
| Retention for 10 years (Article 18(1)) | Retention schedule, storage location, access controls and proof the file can be produced on request | File stored in a system that is decommissioned or cannot be restored from backup |
| Simplified form for SMEs | Use of the Commission form where the provider qualifies, with the Annex IV elements covered | Form used without confirming eligibility, or elements left out because the form was assumed to cover them |
How to build the technical file in order
This sequence turns the Annex IV headings into a technical file that is scoped to one system version, owned by named people, and kept current as the system changes. Each step ends with a document or sign-off that the next step depends on.
Fix the intended purpose and version boundary
Start by writing a short statement of the system's intended purpose, the deployment context, the users and the affected persons, and the exact version the file will describe. Product, legal and engineering leads should agree the statement, because every later heading depends on it. Record which model, prompts, data pipelines and third-party components sit inside the boundary and which sit outside it. The step is complete when the team has a signed scope record with a version identifier, and any change to that boundary is recorded as a new file revision rather than an edit to the old one.
Map each Annex IV heading to an owner
Create an index with one row for each of the nine Annex IV headings. For each row, name an accountable owner, the source system where the evidence lives (for example, a wiki, a ticketing system, a model registry or a test report store), and the review cadence. Engineering, data science, security, quality and legal functions usually each hold several headings, so the index makes gaps visible early. The step is complete when every heading has an owner and a source, and the index has been approved by the person who will sign the declaration of conformity.
Draft the general description and development process
Write the general description of the system and the elements and development process before any other section, since the risk, data and testing records all refer back to them. Cover the system's components, the design choices, the software and hardware it runs on, the development methods, the design specifications and the data requirements at a level a notified body or market surveillance authority could follow. Store the draft under version control so each revision shows what changed, when and by whom. The step is complete when a reviewer outside the build team can trace each design choice to a recorded decision.
Link risk management, data and testing records
Bring the risk management system outputs, the data governance records and the validation and testing results into the file by reference, with each entry pointing to a fixed, dated copy rather than a live folder. Cover the metrics used to judge performance, the results against those metrics and the known limitations. Confirm that each linked record matches the version boundary from the first step. The step is complete when a reader can move from each claim in the general description to the test or risk record that supports it, and no linked record refers to a different system version.
Add the monitoring plan and declaration of conformity
Add the description of how the system is monitored, controlled and kept within its intended limits, including the human oversight measures and the logging approach. Then add the post-market monitoring system and plan, which the 2026 amendment makes part of the Annex IV documentation. Finally, attach the list of harmonised standards applied and a copy of the EU declaration of conformity. Confirm with counsel which conformity assessment route applies, since that determines what the notified body or internal-control process will review. The step is complete when the declaration, the standards list and the monitoring plan carry the same version identifier as the scope record.
Set a review trigger for each lifecycle change
Define in writing which changes require the file to be reopened, such as a retrained model, a new data source, a change of intended purpose, a material change in performance, or a new third-party component. Assign a reviewer and record each decision, including changes judged not material and the reasons. Set a retention rule that keeps each version of the file available to national competent authorities for the period in Article 18(1). The step is complete when the trigger list, the decision log and the retention schedule are approved, and the file has a current version that matches the system in production.
Evidence that fills the file and how to keep it current
Article 11 expects a file that is drawn up before market placement and kept current. The cards below cover the evidence that fills the Annex IV headings and the tools that can hold it. Each tool is a candidate for your architecture, and you should confirm which features your own system needs.
Versioned document set
The Annex IV file is a set of living documents: general description, development process, risk management outputs and the post-market plan. Keep each heading as a controlled page with an owner, a status and a link to the system version it describes. Check that every document states which release of the system it covers, so an assessor can match the file to what was placed on the market. XWiki is an option for this layer: it keeps every page change under version control and lets you compare any two versions and roll back to an earlier one. Confirm that its licence (LGPL-2.1-or-later) and hosting model suit your organization.
Change history for lifecycle changes
Annex IV asks for a description of changes made over the system's lifecycle, so the file needs a record of what changed, when and by whom. Version history in your document platform can supply the wording of each change, but it does not replace the engineering record of model, data and configuration changes. Link each documentation revision to the approval that authorized the change. Ask your team how changes to a model are recorded in source control and whether those records can be traced to the documents they affect.
Role-based access to the file
The technical file contains commercially sensitive design details and must remain available to authorities. Access should follow roles, so engineers can edit their sections, reviewers can approve them and external parties see only what they need. BookStack assigns abilities through roles and lets you override permissions at the shelf, book, chapter or page level. Confirm that its MIT licence and permission model fit your identity setup, and check how access reviews are logged for audit.
Language-model probe reports
Where the system uses a language model, the file should contain evidence of testing against hallucination, data leakage, prompt injection, toxicity and jailbreaks. garak probes a model and writes a JSONL report of every attempt and evaluation, plus a hit log of attempts that found a vulnerability. Keep the raw reports with the model version and the date of the run, because a report without those details does not show what was tested. Confirm whether garak's probe set covers the risks defined in your own risk management system, and record the gaps.
Traces showing post-market behavior
The post-market monitoring plan is part of the Annex IV file, so the file must show how the system behaves once deployed. Langfuse captures traces of each request, including model calls, retrieval steps, tool executions, timing, inputs, outputs and token usage. Define which fields are captured and how long they are kept before go-live, and confirm that personal data in inputs and outputs is handled under your data protection obligations. Check whether trace data can feed the incident and performance reviews your plan describes.
What building and keeping the technical file costs
This table compares the main cost components of an Article 11 technical file, who is paid for each, whether it is one-time or recurring, and what moves it up or down. Use it to structure a request for a written scope and quote, and to see where open-source documentation tools can reduce license spend.
| Cost component | One-time or recurring | What drives it up or down | How self-hosted open-source tools help |
|---|---|---|---|
| Documentation tooling or licenses | Recurring (subscription or renewal), plus one-time setup | Number of users, number of systems documented, and whether the platform needs add-on modules for approvals or audit trails | Self-hosted wiki with version history, such as XWiki (LGPL-2.1-or-later), can hold the Annex IV headings and show what changed, when and by whom, with no per-seat license fee for the software itself |
| Engineering time to produce and link records | One-time for the first file, recurring for updates | System complexity, number of model components, data pipelines and deployment environments, and how well logs and test results are already structured | Linking pages to versioned evidence reduces rework; permissions per role in a self-hosted tool such as BookStack (MIT) keep sign-off trails clear |
| Legal or regulatory review | Recurring at each material change, plus initial review | Whether the system is an Annex III or Annex I product, whether the SME simplified form applies, and how many sectoral files must be read together under Article 11(2) | Limited direct effect; a clear, versioned file gives reviewers a single reference and shortens review cycles |
| Testing evidence upkeep | Recurring, tied to each release and retest | Number of versions in production, frequency of retraining or model changes, and the scope of performance metrics reported under Annex IV | Tools such as garak (Apache-2.0) produce JSONL reports of every attempt and a hit log, and Langfuse (MIT) traces record inputs, outputs and metadata, so evidence can be exported rather than rebuilt by hand |
| External testing or review | Recurring, usually per engagement | Scope of the system, attack surface, and whether independent testing is needed to support the claims made in the file | Internal or self-hosted test tooling can reduce the volume of external work, but the scope and fee should be agreed in writing with the reviewer |
| Auditor or notified body assessment time | One-time for initial assessment, recurring for surveillance or reassessment | Whether internal control (Annex VI) or a notified body route applies, and the number of Annex I sectoral files; ask the body for its fee structure in writing | Organized evidence shortens the assessment; confirm notified body fees and timing directly with the body, since DeployOpen does not issue conformity outcomes |
Who owns the file, who prepares it and who assesses it
As the provider, your organization owns the technical documentation under Article 11. Ownership means the content is accurate for your system, reflects your design decisions and is kept current across the lifecycle. Article 11 requires the file to be drawn up before the system is placed on the market or put into service, and to stay up to date afterward. Your accountable people, not an outside firm, must confirm that the file describes the system as it actually runs.
- File ownership: Name an accountable owner for the Annex IV file and a backup, and assign a section owner for each of the nine Annex IV headings.
- Declaration of conformity: Senior staff with authority to bind the organization review and sign the EU declaration of conformity and the copy included in the file.
- Change control: Route every model update, data change, or intended-purpose change through a documented review that updates the affected Annex IV sections.
- Record currency: Keep version history, approval dates and evidence references current so an authority can see what was true at each release.
- Retention: Hold the file available for national competent authorities for 10 years after the system is placed on the market or put into service, as Article 18(1) requires.
Before you engage anyone, confirm which decisions and signatures must stay with your own staff under your governance policy and any sectoral rules that apply to you.
An implementation partner can prepare the systems and evidence that feed the technical file. This work is usually technical and repetitive, which is why many organizations outsource it. The partner does not decide the system's risk classification, approve the content as the provider's statement, or issue any report or certificate. Those remain with you and with an independent assessor or notified body.
- Documentation systems: Set up a controlled repository for the file, with templates mapped to the Annex IV headings and access controls that match the owner roles above.
- Evidence collection: Configure logging, metrics and test pipelines so that evidence for risk management, performance and monitoring is generated and stored as the system runs.
- Self-hosted tooling: Deploy self-hosted tools inside your own infrastructure, such as a wiki or document platform with version control and role-based permissions, so the file stays under your control.
- Testing support: Run or support security and model testing, and record results in a form the file can reference.
- Handover: Document the operating procedures and transfer administration so your team can maintain the file after the engagement ends.
Ask any partner to state in writing which deliverables they prepare, which decisions remain yours, and that they will not issue attestations or certifications on your behalf.
The independent assessor, or notified body where one is required, tests whether the system and its file meet the requirements. Under Article 43, most Annex III systems follow internal control, which means the provider performs the conformity assessment itself using Annex VI. Notified bodies are involved for some biometric systems and Annex I products. Where a notified body is required, it issues the certificate. Your choice of assessor depends on which route applies to your system.
- Independent testing: The assessor reviews the file, samples evidence and checks that the documented system matches observed behavior.
- Where advice ends: An assessor can explain what it will test and what evidence it expects, but it cannot write the technical file or design controls for you without losing independence.
- Separation of duties: Use a different firm for preparation and for independent assessment where the route requires it, and confirm this with the assessor before work starts.
- Scope and timing: Agree in writing which Annex IV sections and which system versions are in scope.
- Outputs: Ask for the assessment report or certificate format the assessor will issue, and confirm who receives it.
Confirm with your chosen assessor which conformity route applies to your system, and check its accreditation or designation status for that route.
Where technical files usually fall short and how to close each gap
Most technical files fail not because the content is missing but because it stops matching the system. The gaps below share one cause: the file is treated as a launch deliverable rather than a living record tied to the risk management, data governance and monitoring work that runs alongside it.
Written once and never updated
Article 11(1) requires the file to be kept up to date, yet many providers draft it for the conformity process and then leave it alone. Every model retraining, change of intended purpose, new data source or altered hardware dependency is a lifecycle change that should trigger a review. Fix it by adding a change-control step to your release process that blocks a release until the affected Annex IV sections are reviewed and the version is updated.
Describes the design, not the deployed system
A file that reads like the original design specification will not match what is running in production after months of changes. Assessors compare the Annex IV general description and development process against the system actually in use. Fix it by generating the description of versions, configurations and components from the release record, and by naming the exact model version, dependencies and deployment environment each document applies to.
Metrics not monitored in production
Annex IV asks for the appropriateness of the performance metrics chosen. A common gap is a file that declares accuracy and robustness figures from test sets but has no production monitoring behind them, so nobody can show the figures still hold. Fix it by listing each metric with the telemetry source, alert threshold and owner, and by confirming with your monitoring vendor which metrics your chosen tooling can actually collect.
Missing links to risk and data records
The technical file summarizes the risk management system and the data governance work, but many files contain summaries with no pointers to the underlying records. An assessor who cannot trace a risk entry or a data provenance decision back to its source will treat the claim as unsupported. Fix it by giving every Annex IV statement a stable identifier that points to the risk register entry, dataset record or test report that supports it.
No retention plan for the file and its versions
Article 18(1) requires providers to keep the technical documentation available to national competent authorities for 10 years after the system is placed on the market or put into service. That period covers every superseded version, not only the latest one. Fix it by setting a retention schedule in writing, storing each version under version control with its approval record, and confirming with your legal team how the period applies to systems withdrawn early.
Questions buyers ask about Article 11 technical documentation
How much effort does the Article 11 technical file take, and what drives it?
The file takes as much effort as the system's documentation gap, and no supplied figure gives a fixed duration. The main drivers are the number of high-risk systems, how many Annex IV headings already have evidence, how complex the development process is, and how many versions and lifecycle changes must be recorded. Quantity of material matters less than whether each claim traces to a real test, decision or record. Ask any adviser for a written scope that lists the systems, the Annex IV headings covered, the evidence to be collected and the review cycle before agreeing to effort.
Can an SME or small mid-cap use the simplified technical documentation form?
Yes, if the organization is an SME, start-up or small mid-cap enterprise, because the 2026 amendment to Article 11(1) lets it provide the Annex IV elements in a simplified manner using a Commission form. The amendment also requires notified bodies to accept that form. Confirm your eligibility against the enterprise size definitions that apply to you, check the current form on EUR-Lex, and confirm with your notified body or national authority how it expects the form to be submitted. The simplified route changes presentation, not the substance: the underlying risk management, data and testing evidence still has to exist.
How long must the technical file be kept, and who can request it?
Providers must keep the technical documentation for 10 years after the system is placed on the market or put into service, under Article 18(1). National competent authorities can ask to see it during that period, so the file must remain available in a form they can read. Confirm with your legal team whether other retention rules, such as sectoral regulations or contracts, extend the period, and plan storage, access rights and migration of the file so it stays retrievable for the whole retention window.
Can the technical file be produced with open-source tools?
Yes, open-source tools can hold and version most of the file, but none of them writes the Annex IV content for you. A wiki or documentation platform such as XWiki keeps every change under version control, recording what changed, when and by whom, and lets users compare versions and roll back. BookStack lets you set role-based permissions at shelf, book, chapter or page level, which helps separate drafting from approval. Evidence from testing can come from tools such as garak, which writes a JSONL report of every attempt, and Langfuse, which captures traces with inputs, outputs and metadata. Confirm each tool's fit with your own requirements before relying on it.
What does the work need from our own team?
The provider's own team owns the technical file, the system design decisions and the evidence behind each claim. Engineers must supply architecture, data lineage, test results and change records. Risk and compliance staff must approve the risk management content, and product owners must confirm the intended purpose and instructions. An implementation partner can structure the file, set up the document system and organize evidence, but it cannot make these decisions. Agree the named owner for each Annex IV heading and the review cadence in writing before work begins.
Can an outside partner write the technical file for us?
An outside partner can prepare the structure, templates, document system and supporting evidence for the file, and can help your team complete it. The partner cannot own the conformity claims or issue any report or certificate, because only an independent auditor, assessor or notified body does that. DeployOpen plans and implements self-hosted open-source platforms inside the client's infrastructure and prepares evidence for assessments, but it does not issue audit reports, attestations or certifications. Most engagements are fixed-scope, so ask for the deliverables, the Annex IV headings covered and the handover conditions in writing.
How DeployOpen prepares the technical file for your system
DeployOpen works on Article 11 technical documentation as part of a fixed-scope engagement, with the written scope fixing which Annex IV headings, systems and evidence sources are covered. We help you assemble the technical file from the platforms and records your system already produces, while your organization remains responsible for the content, the declarations and the decisions the file records.
How we scope
- Confirm which high-risk system and which Annex IV headings the written scope covers before work starts.
- Map each Annex IV heading to the internal source that holds its evidence, such as wikis, logs and test records.
- Agree who on your side owns each section, including intended purpose, risk decisions and the EU declaration of conformity.
- Confirm whether the system is an Annex I product, which would bring single documentation into the scope.
How we build
- Set up a versioned documentation space so every change to the technical file records what changed, when and by whom.
- Structure the file under the nine Annex IV headings with templates your reviewers can check section by section.
- Connect monitoring and test outputs, such as trace and evaluation records, to the sections that cite them.
- Run a completeness review against the Annex IV list and record open gaps for your owners to close.
How we hand over
- Deliver the technical file in the agreed format, with an index linking each Annex IV heading to its evidence.
- Document the access model so that only named roles can edit, approve or export the file.
- Provide a retention plan that covers keeping the file available for the 10-year period in Article 18(1).
- Train the owners on how to update the file when the system or its risk profile changes.
How we support
- Offer ongoing support as a retainer to keep the file current after each system change.
- Review updates to the file when lifecycle changes, post-market findings or new harmonised standards affect it.
- Confirm with your assessor or notified body which form and level of detail they expect before submission.
- Note that DeployOpen prepares the file, while independent assessors and notified bodies, not DeployOpen, review it and issue any conformity outcome.

