Who needs CMMC certification, and at which level

Any prime or subcontractor at any tier that will process, store or transmit Federal contract information (FCI) or controlled unclassified information (CUI) in performing a DoD contract is in scope for CMMC. The level depends on which of those two information types the work touches and on the level the program office or requiring activity specifies in the solicitation or contract. Under 32 CFR 170.23(a), primes must also flow the requirements down to subcontractors at every tier that handle FCI or CUI. Start by listing each contract, task order and subcontract in your pipeline and recording whether the contractor will hold FCI, CUI or both, because that answer decides whether CMMC applies at all. The test is practical. FCI is information provided by or generated for the government under a contract that is not meant for public release, and Level 1 covers it through the 15 safeguarding requirements of FAR 52.204-21. CUI is government-created or government-owned information that laws, regulations or government-wide policies require you to protect, and Level 2 covers it through the 110 requirements of NIST SP 800-171 Rev. 2. Contract-specific marking and the statement of work usually show which applies. Commercial off-the-shelf (COTS) deliveries to a DoD buyer are exempt, but using COTS products inside your own systems that handle CUI is not. Your organization owns its controls and the certification decision. An implementation partner can prepare systems and evidence, but only an independent assessor or certification body issues a certificate. The current schedule changes what a solicitation can require. On 13 July 2026 the Department of War suspended CMMC Phase II, and the 3 September 2026 DFARS class deviation lets requiring activities specify Level 1 (Self) or Level 2 (Self) assessments. Contracting officers are working to remove or revise CMMC requirements in open solicitations and contracts. The eCFR text of 32 CFR 170.3(e) still shows the original four-phase schedule, so confirm the requirement in each solicitation with the contracting officer, and check the DoW CIO About CMMC page before you commit budget to a Level 2 certification assessment. Phase I self-assessments, SPRS postings and DFARS 252.204-7012 obligations still apply.

Which CMMC level applies to primes, subcontractors and universities

A prime contractor is in scope when it will process, store or transmit Federal contract information (FCI) or controlled unclassified information (CUI) while performing a DoD contract. Under 32 CFR 170.23(a), that trigger applies to primes and to subcontractors at every tier, and the prime carries the added duty to flow the requirements down to its subcontractors. The contract clause, DFARS 252.204-7021, is the mechanism that puts the required CMMC level into the contract. Until 9 November 2028, the clause goes into a contract only when the program office or requiring activity specifies a level. From 10 November 2028, it applies whenever contractor systems will process, store or transmit FCI or CUI, except for contracts solely for COTS items.

  • Trigger: handling FCI or CUI in performing the contract, not the size of the award or the company.
  • Clause logic: until 9 November 2028, the requiring activity names the level; from 10 November 2028, the clause applies by default to FCI or CUI systems.
  • Flow-down: the prime must pass the required level to subcontractors that will handle FCI or CUI.
  • Current status: the 13 July 2026 suspension of Phase II and the 3 September 2026 class deviation mean requiring activities may specify Level 1 (Self) or Level 2 (Self) for now.
  • Confirm with the contracting officer: which level each solicitation names and whether the clause appears in the contract.

Before bidding, ask the contracting officer in writing which CMMC level the solicitation requires and whether the 2026 deviation changes it.

How the 2028 clause date and the 2026 suspension change when a contract requires CMMC

This sequence shows the order of the DFARS, suspension and deviation actions so a contracts or security lead can tell which CMMC requirement applies to a given solicitation today and which changes in November 2028.

  1. Confirm the DFARS clause took effect in November 2025

    The DFARS rule that puts CMMC into contracts through clause 252.204-7021 and provision 252.204-7025 was published on 10 September 2025 and took effect on 10 November 2025. The contracts team should read this as the starting point: the clause exists in the DFARS, but it does not automatically appear in every solicitation. Check the solicitation and the contract for the clause and for any stated CMMC level. The check is complete when you can name the clause version in the contract file and note whether a level is stated.

  2. Record the 13 July 2026 Phase II suspension

    On 13 July 2026 the Department of War suspended CMMC Phase II, which had been scheduled to start 10 November 2026 and would have required Level 2 C3PAO certification for applicable contracts. The suspension also paused later implementation milestones and opened a 60-day review by a CMMC Reform Task Force. Your compliance lead should log the suspension date and the review window so that any future change to Phase II is tracked against a named source rather than memory. The step is complete when the suspension is in the compliance calendar with its source link.

  3. Apply the 3 September 2026 class deviation

    DoW Class Deviation 2026-O0025, Revision 3, dated 3 September 2026, cites the 13 July 2026 DoW CIO memorandum. It lets requiring activities specify CMMC Level 1 (Self) or Level 2 (Self) assessments and directs contracting officers to work with requiring activities to remove or revise CMMC requirements in new and existing solicitations and contracts. Contracts staff should read the deviation text and then check each solicitation for the level it names and whether the requirement was revised. The step closes when every open solicitation has a recorded level or a recorded removal.

  4. Track the Phase 1 self-assessment position

    The DoW CIO 'About CMMC' page, as of 17 October 2026, says implementation is paused in Phase 1, which began 10 November 2025, and may only require self-assessments at Levels 1 and 2. The eCFR text of 32 CFR 170.3(e) still contains the original four-phase schedule, so the printed rule and the current DoW position differ. Compliance leads should treat the DoW CIO page as the current operating position and confirm with the contracting officer which text governs a given award. The step is complete when the team has written down which source it relies on and the date it checked.

  5. Keep DFARS 252.204-7012 and SPRS obligations in force

    The suspension and the deviation do not remove the existing duties. Phase I self-assessments, SPRS postings, annual affirmations and the obligations under DFARS 252.204-7012 remain in place now. Any contractor system that processes, stores or transmits covered defense information must still meet NIST SP 800-171 under 7012, and the organization must keep its SPRS score current where a contract requires it. The check is a written confirmation from the security lead that SPRS entries and affirmations are current for each covered system.

  6. Hold the rule that the clause waits for a specified level until 2028

    Under the DFARS text as set out in the deviation, until 9 November 2028 clause 252.204-7021 goes into contracts only when the program office or requiring activity specifies a CMMC level. Contractors should therefore not assume that every contract with CUI carries the clause. Where a solicitation is silent, ask the contracting officer in writing whether a level will be specified, and retain the answer in the bid file. The step is complete when the bid file shows either a stated level or the written answer that none is required.

  7. Plan for the 10 November 2028 applicability date

    From 10 November 2028 the clause applies whenever contractor systems will process, store or transmit FCI or CUI, except for contracts solely for COTS items. This is the point at which the clause stops depending on a specified level. Organizations should use the period before that date to map which contracts and systems touch FCI or CUI, confirm their required level, and budget for assessment. The output is a dated inventory of contracts and systems that will fall under the clause, reviewed with counsel and the contracts team.

  8. Document the changes in the bid and contract records

    Every decision made in this sequence should be written into the contract and bid files: the clause version, any level stated, the deviation revision relied on, and the date each source was checked. This record lets a contracting officer, prime or assessor see how the organization interpreted the rules at each point. The step is complete when the record is filed and reviewed again at each change to the DFARS, the deviation or the DoW CIO position.

How many companies DoD expects to need CMMC certification

DoD's 2024 final rule gave a rough picture of how many companies would need a Level 2 certification assessment and how that demand would ramp up. Those figures predate the 2026 suspension, so treat them as a planning baseline rather than a count of your obligations. Your own contract portfolio decides which level, if any, applies to you.

The 8,350 entity estimate

DoD's 2024 CMMC final rule estimated that 8,350 medium and large entities would need CMMC Level 2 certification assessments. The figure counts entities across the defense supply chain, so it covers primes and subcontractors that handle CUI, not only firms with direct DoD contracts. Read it as the scale DoD planned for, not a list of named companies. Check whether your organization sits inside that population before assuming you are outside it.

Year one: 135 assessments

The rule projected 135 C3PAO-led assessments in the first year of phase-in. Early demand was expected to be small because only contracts that specified a level would trigger certification. Assessor capacity and the first wave of solicitations drove that ramp. If you expect to be among the first to face a requirement, confirm with your contracting officer whether your next award specifies Level 2 and whether the assessment is self or third party.

Year two and three ramp

The same estimate projected 673 assessments in year two and 2,252 in year three. The steep climb reflects DoD expecting more contracts to carry the clause as the rollout matured. Plan for demand to grow, and check how your prime plans to flow requirements to you. A growing number of certification assessments also means scheduling pressure for organizations that wait until a contract requires one.

Why the estimate predates the suspension

DoD made these estimates before the Department of War suspended CMMC Phase II on 13 July 2026. The suspension moved the November 2026 start of Level 2 certification requirements and sent contracting officers to revise solicitations and contracts. The count of affected companies therefore cannot be read straight from the 2024 table. Ask your contracting officers and primes which requirements now apply to current and upcoming work.

Which contracts specify a level

The number of affected companies depends on which contracts ultimately name a CMMC level, not on how many companies handle CUI in general. Under the DFARS rule, until 9 November 2028 the clause goes into a contract only when the program office or requiring activity specifies a level. Review each solicitation, contract and subcontract for clause 252.204-7021 and the level stated, and record the results in one register so the count reflects your real exposure.

Build your own count

Start with a list of every contract, task order and subcontract that involves FCI or CUI, including those held by your suppliers and customers. Mark which ones carry DFARS 252.204-7012 and which name a CMMC level. The result is the population that matters to your business, and it is the only number that should drive budget and sequencing. Do not use DoD's national estimate in a funding case without this internal count.

What contractors must still do while Phase II is suspended

The July 2026 suspension paused the Level 2 certification requirement, but it did not remove the duties that already bind defense contractors. The cards below cover what stays in force, who owns each obligation, and what to check in each contract before assuming a lower requirement applies.

DFARS 252.204-7012 safeguarding

Contractors that handle covered defense information must still meet the safeguarding and incident reporting obligations in DFARS 252.204-7012 wherever that clause appears in a contract. The obligation sits with the contractor, not with a CMMC level, so a suspended certification phase does not switch it off. Check each contract for the clause, confirm which systems process covered information, and confirm that subcontract flow-down language is in place. An implementation partner can help prepare systems and evidence, but the contractor remains accountable for compliance.

NIST SP 800-171 implementation

Where a contract incorporates DFARS 252.204-7012, the contractor's systems that process, store or transmit CUI must implement NIST SP 800-171. The CMMC Level 2 requirements are the same 110 requirements, so an organization that implements them now is preparing for any future Level 2 assessment. Ask your program office which revision your contracts reference, because the CMMC rule incorporates Rev. 2 even though NIST withdrew it in 2024. Document how each requirement is met in the system security plan, since that document is the first thing an assessor or contracting officer reviews.

SPRS postings and annual affirmations

Phase I self-assessments, SPRS score postings and annual affirmations by an Affirming Official remain in place during the suspension. A posted score must reflect what the organization can actually demonstrate, and the affirmation is a statement made by a named executive about ongoing compliance. Before posting or affirming, confirm the scope of the assessed systems, confirm that evidence is final and not draft, and confirm that the person signing understands what the statement covers. Keep the assessment record in a form that can be produced on request.

Level 1 or Level 2 self-assessment

The Department of War's July 2026 action allows requiring activities to specify Level 1 (Self) or Level 2 (Self) assessments. When a contract names one of these levels, the contractor must complete the matching self-assessment and post the result. Level 1 covers the 15 requirements for Federal contract information, while Level 2 covers the full CUI set. Confirm in writing which level each solicitation or contract specifies, because the level determines the scope, the evidence and the record you keep.

Checking each contract's clause and level

Contract terms are changing while the program is paused. A DoD class deviation directs contracting officers to work with requiring activities to remove or revise CMMC requirements in new and existing solicitations and contracts, and the eCFR text still shows the original schedule. Review each active solicitation and contract for DFARS 252.204-7012, 252.204-7021 and 252.204-7025, and ask the contracting officer to confirm in writing which CMMC level, if any, applies. Record the answer, and update it when a modification changes the requirement.

Who owns the requirement, who prepares evidence and who assesses

Your organization owns the CMMC requirement from start to finish. Contract eligibility, the CUI boundary, the systems in scope and the controls that protect them all sit with your leadership and staff, whoever helps you build them. The Affirming Official is a senior person in your company who must personally affirm continuing compliance, and that affirmation is a company decision, not a consultant decision.

  • Scope decisions: Your team decides which systems, people, facilities and external providers process, store or transmit FCI or CUI, and documents that boundary.
  • Control ownership: Each of the 110 Level 2 requirements needs a named owner who operates the control day to day and keeps its evidence current.
  • Affirmations and SPRS entries: The Affirming Official signs affirmations and the organization is responsible for accurate score postings in SPRS.
  • Plan of action decisions: Whether to use a POA&M, and for which requirements, is a risk decision your leadership must record and defend.
  • Assessment readiness: You choose the assessor, schedule the work and hold final-form evidence for the assessment.

Before relying on any partner, confirm internally who holds each of these responsibilities and who signs off on the final scope.

Mistakes that leave a company exposed to a CMMC requirement it missed

Most companies that miss a CMMC requirement do not ignore it. They rely on an assumption about their size, their products or their contracts that never gets tested against the actual data flows. The four mistakes below share that pattern, and each has a simple check that can be done before a contract or subcontract forces the question.

Reading COTS as a blanket exemption

The CMMC rule does not apply to contracts that exclusively deliver commercial off-the-shelf products to a DoD buyer. That exemption does not cover your own use of COTS products inside systems that process, store or transmit CUI, such as a commercial email platform, file share or engineering tool. Check each COTS product against the systems that hold CUI, not against the product you ship.

Assuming a small business is out of scope

Company size does not decide applicability. A small machine shop or consultancy that stores drawings or specifications marked CUI on its own systems is in scope, and so is a subcontractor receiving those files from a prime. Confirm what data your people actually handle, where it sits, and whether the contract carries DFARS 252.204-7012, before concluding you are exempt.

Assuming a university is out of scope

Universities are not automatically exempt. The CMMC rule states that contractor-owned systems processing CUI are subject to NIST SP 800-171 when DFARS 252.204-7012 is in the contract, whether or not the work is fundamental research. Only universities engaged solely in fundamental research using public information, with no FCI or CUI, are unlikely to face a CMMC requirement. Review each sponsored project's contract for CUI handling.

Ignoring flow-down clauses in subcontracts

Under 32 CFR 170.23, primes must flow CMMC requirements down to subcontractors at every tier that will handle FCI or CUI. A subcontract that never mentions the clause does not remove the obligation for the work performed. Before accepting or issuing a subcontract, read the clause terms, confirm the required level with the prime or requiring activity, and record which subcontractor systems will hold the data.

Treating the eCFR schedule as current

The eCFR text of 32 CFR 170.3(e) still lists the original four-phase schedule, but the DoW CIO About CMMC page says implementation is paused in Phase 1 and may require only Level 1 and Level 2 self-assessments. Contracting officers are also revising solicitations under a 2026 class deviation. Check the DoW CIO page and the solicitation's own CMMC language on the day you bid, and record the date you checked.

Common questions about who must meet CMMC

Does a small business need CMMC certification?

Size alone does not decide it. A small business needs CMMC if it will process, store or transmit Federal contract information (FCI) or Controlled Unclassified Information (CUI) in performing a DoD contract. Under 32 CFR 170.23(a), the rule reaches prime contractors and subcontractors at all tiers that handle that information, so the level depends on the data and the contract. Start by listing every contract clause and every system that touches DoD data, then compare that list with the level the requiring activity specifies. Current scope is affected by the July 2026 suspension, so confirm with your contracting officer which level, if any, your contracts require today.

Does a subcontractor need CMMC if the prime already has it?

Yes, if the subcontractor will handle FCI or CUI for that work. CMMC applies at every tier that processes, stores or transmits that information, and the prime must flow the requirements down to its subcontractors under 32 CFR 170.23. Having a prime's certification does not cover your own systems. Ask the prime which level it requires, which clause appears in the subcontract, and what affirmations and SPRS entries it expects from you. Your own assessment scope is limited to your systems and the external providers you use.

Does buying COTS products exempt us from CMMC?

Only partly. CMMC does not apply to contracts and subcontracts that exclusively deliver commercial off-the-shelf (COTS) products to a DoD buyer, with COTS defined in FAR 2.101. The exemption does not cover your own use of COTS products inside systems that process, store or transmit CUI. A commercial laptop, file server or cloud tenant that holds CUI is still in scope. Confirm with the contracting officer whether a given contract is truly COTS-only, and list every system you operate for DoD work.

Do universities need CMMC for research contracts?

It depends on what the research handles. The CMMC final rule says that contractor-owned systems processing CUI are subject to NIST SP 800-171 when DFARS 252.204-7012 is in the contract, whether or not the work is fundamental research. Universities engaged solely in fundamental research that uses only public information, with no FCI or CUI, are unlikely to face a CMMC requirement. Review each sponsored agreement for DFARS clauses and CUI markings, and ask your sponsored programs office to confirm whether any project brings controlled data into university systems.

Does the 2026 suspension cancel CMMC?

No. On 13 July 2026 the Department of War suspended CMMC Phase II, which would have required Level 2 C3PAO certification for applicable contracts, and started a 60-day review. Phase I self-assessments, SPRS postings, annual affirmations and DFARS 252.204-7012 obligations remain in place. A 3 September 2026 class deviation lets requiring activities specify Level 1 (Self) or Level 2 (Self) assessments. The 2028 clause date is also in the deviation schedule. Treat the suspension as a change in what contracts can require, not as relief from safeguarding CUI.

What does it cost to find out which CMMC level we need?

Most of the cost is internal effort, not a fee. The work is to inventory contracts for FCI and CUI clauses, map the systems and people that touch that data, and compare the result with the level each requiring activity specifies. A consultant or implementation partner can be paid to run that scoping, and the price should follow from a written scope that lists the contracts, sites and systems reviewed. Ask for the deliverables in writing, including the scoping record and the list of open questions for your contracting officers. No public figure in this context sets what your scoping will cost.

Can an implementation partner get us CMMC certified?

No. An implementation partner prepares your systems, controls and evidence, but only an independent C3PAO, authorized or accredited through The Cyber AB, issues a Level 2 certification assessment result. DeployOpen plans, implements, hardens and documents self-hosted open-source platforms in your own environment and can prepare evidence for an assessment, but it does not issue assessment reports or certificates. Your organization owns its controls and its affirmations. Check any firm's authorization on The Cyber AB Marketplace before you sign.

How DeployOpen helps you confirm scope and prepare evidence

DeployOpen works with defense contractors to turn the FCI and CUI test into a written boundary for their own systems. We scope, build and document the environment inside your infrastructure, then hand over the evidence your organization and its independent assessor will need. We do not decide who must be certified, issue reports, or certify anyone.

How we scope

  • We map where your contract information and CUI is created, stored, transmitted and handled, including subcontractor and external service provider paths.
  • The written scope names the systems, sites and people in or out of the CMMC boundary, so your required level is tied to specific contract terms.
  • Engagements are fixed-scope, with scope, deliverables and timelines agreed in writing before any work starts.

How we build

  • We configure the in-scope systems in your own cloud accounts, data centers or air-gapped networks to meet the Level 1 or Level 2 requirements you confirm.
  • We run security testing against the boundary so gaps are found and fixed before any assessor looks at the environment.
  • We integrate the controls with your identity, logging and vendor systems so the required records are generated as part of normal operations.

How we hand over

  • You receive the system documentation, configuration baselines and evidence records, written so your staff can maintain them after handover.
  • We document which requirements your organization owns, which are supported by your service providers, and which need your own policy decisions.
  • Final evidence is delivered in the form an independent assessor reviews, with the assessor's independence and reporting left to that assessor.

How we support

  • Ongoing support, upgrades and continuous security testing are available as retainers after the initial engagement ends.
  • A retainer can keep scope documentation current when contracts change, new subcontractors join, or your environment is modified.
  • Confirm with us in writing which support, testing and update services are included, and how changes to scope are priced.

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.

  • 30-minute call: free, with no obligation.
  • NDA on request: we can sign before you share details.
  • Clear next steps: a scope and plan after the call.