Control 3 Data protection

CIS Control 3 Safeguards for data: the data management process, data inventory, access control lists, retention, disposal, classification, data flows, encryption, segmentation, data loss prevention and logging of sensitive data access.

Safeguard 3.2 Establish and maintain a data inventory

An inventory of enterprise data, sensitive data at a minimum, built from the data management process and reviewed at least annually: how it differs from the asset and software inventories and how its completeness is measured.

Safeguard 3.4 Enforce data retention

Keeping data only as long as the documented data management process allows, with both minimum and maximum retention timelines, and how assessors check retention rules per sensitivity type.

Safeguard 3.5 Securely dispose of data

Disposing of data as the data management process requires, with disposal methods matched to sensitivity: what disposal evidence looks like and how assessors measure it per sensitive data type.

Safeguard 3.8 Document data flows

Documenting how data moves, including flows to and from service providers, based on the data management process and reviewed annually, with assessors checking coverage of data flows to external enterprises.

Safeguard 3.10 Encrypt sensitive data in transit

Encrypting sensitive data as it moves across networks, with TLS and OpenSSH as CIS's examples, and the links CIS draws to data-in-transit requirements in NIST CSF 2.0, NIST SP 800-53 and PCI DSS.

Safeguard 3.14 Log sensitive data access

Audit logging of access to sensitive data, including modification and disposal: the Control 3 Safeguard in the Detect function, linking data protection to audit log management in Control 8.

Talk to our team.

Tell us what you're working on, whether it's a deployment, an audit, a security test or a cyber range. You'll speak with an engineer who can help you scope it.

  • 30-minute call: free, with no obligation.
  • NDA on request: we can sign before you share details.
  • Clear next steps: a scope and plan after the call.