Open-source alternative to Smartsheet resource management: what OpenProject covers
For a planning or PMO team that tracks people, allocations and hours in Smartsheet, OpenProject can hold work package assignments, time tracking and budgets on your own servers in a self-hosted setup. Work packages, time tracking and dashboards are part of the free Community edition, which is licensed under GPL-3.0. Portfolio and resource management, the features closest to capacity planning, sit in paid Enterprise plans, so that is the first line item to confirm with OpenProject before you compare options. Confirm which edition includes budgets as well, and get that answer in writing before you plan around it.
Spreadsheet-style capacity grids, where people sit in rows, weeks sit in columns and allocation percentages fill the cells, may not map directly onto work package assignments. Expect to rebuild that view with OpenProject's reporting, or to add a second tool if the grid drives how your PMO makes staffing decisions. Smartsheet's backup also excludes reports, dashboards and formulas, so the rebuild has to be planned as its own task. Compare plans and feature lists on the OpenProject pricing page against the views your team uses today.
Before you commit, run a pilot on a separate test instance. Assign a representative set of work packages to named users, log time against them, and check whether the output answers the questions your PMO asks each week, such as who is overallocated and where hours go over budget. Record each gap as a decision: accept it, close it with a report, or assign it to a second tool. Hosting effort depends on user count and on your own infrastructure, so ask for sizing guidance from OpenProject's system requirements before you pick a server.
Which Smartsheet capacity features map to OpenProject
This table maps each capacity feature a Smartsheet resource planner relies on to the OpenProject capability that covers it, with the edition that holds it. Use the last column as a checklist of items to test in a trial before you commit. The main takeaway is that assignments, time entry and dashboards are in Community, while resource management and user provisioning sit in paid Enterprise plans, and that budgets, allocation views and formulas need hands-on checks.
| Smartsheet capacity feature | OpenProject capability | Edition that holds it | Confirm before committing |
|---|---|---|---|
| Assignments to people | Work package assignees on the project plan | Community | Multiple assignees per task and how they show on the plan |
| Allocation or effort columns | Team planner and resource management views | Enterprise on-premises or Enterprise cloud | Whether percentage allocation matches your Smartsheet columns |
| Time entry | Time tracking on work packages | Community | Approval steps, timesheet layout and export format |
| Budget columns | Budget tracking against work packages | Confirm with the vendor | How budgets roll up across projects and what changes when estimates move |
| Capacity or workload reports | Dashboards, plus resource views in Enterprise | Community for dashboards, Enterprise for resource views | Whether cross-project capacity totals need an external reporting tool |
| User management and sign-in | Single sign-on, LDAP group synchronization and SCIM provisioning | Enterprise on-premises or Enterprise cloud | SCIM behavior with your identity provider during a trial |
| Formulas and saved reports | No direct equivalent, so rebuild as views, queries or a reporting tool | Depends on the approach chosen | Which Smartsheet formulas and reports your team relies on, since backups do not carry them |
Which OpenProject edition holds resource management
The edition you choose decides whether capacity planning can happen inside OpenProject at all. OpenProject is offered as a free Community edition, as Enterprise on-premises and as Enterprise cloud. The Community edition includes work packages, Gantt charts, agile boards, time tracking and dashboards, with community support. Portfolio and resource management, single sign-on, LDAP synchronization and SCIM provisioning are not in the free edition and sit in the paid Enterprise plans. For a team that plans people across projects, that means the free edition can track work and hours, but the features that assign capacity across a portfolio and keep user accounts aligned with the directory need an Enterprise subscription. Map each Smartsheet resource view you rely on to a specific OpenProject feature before you decide which edition to buy.
Enterprise on-premises is priced per named user per month. The published tiers are Basic at 5.95 euros, Professional at 10.95 euros with a 25-user minimum, Premium at 15.95 euros with a 100-user minimum, and Corporate on request for 250 or more users, according to the OpenProject pricing page. Because the price follows named users, the number of people you put into the planner is the main cost driver. Minimums mean a small planning group still pays for the full minimum. As an illustrative example only, 40 named users on Professional would be 40 times 10.95 euros per month before taxes, and that figure recurs for as long as the subscription runs. Hosting, administration and any services partner work are separate costs you carry alongside the subscription.
Four open-source options for people and capacity planning
Smartsheet teams planning people and capacity usually need three things: assignments tied to dated work, a way to see load across people, and time records to check plans against. The four options below cover different shapes of that need, from a full planner with Enterprise resource management to a custom grid built on a no-code database. Each card names the fit and the gap to confirm before you commit.
OpenProject for work package planning
OpenProject is the primary option for planning people through work packages, Gantt charts and assignees in the Community edition, with time tracking and dashboards included. Resource management and portfolio views sit in paid Enterprise plans, so confirm which planning views your team needs before you size a license. Check that your team can map Smartsheet resource columns to work package assignments and dates, since capacity totals will not carry over automatically. The GPL-3.0 license and self-hosted deployment keep assignment and time data on your own servers.
Redmine for a lighter scope
Redmine fits teams that need issue tracking, Gantt charts and time tracking without a large planning suite. It is a self-hosted application under GPL v2, built on Ruby on Rails, with LDAP authentication and Git and Subversion integration. Confirm whether the current release covers the per-person allocation views your planners use, because resource allocation is not a headline feature and must be verified before you rely on it. Plan for plugins or reports if you need a multi-person capacity grid.
Plane for cycle-based teams
Plane suits teams whose planning runs in cycles around issues, especially those moving from Jira, Asana, ClickUp or Linear. Its importers cover those tools, and the self-hosted Community Edition is licensed AGPL-3.0. Resource allocation and workload views must be confirmed in the current release before you commit, and the importers may not carry Smartsheet dates or assignments directly. Check how your team's capacity is represented in Plane before choosing it over OpenProject.
Self-hosted no-code database grid
For teams that need a custom capacity grid with role-based access rules, a self-hosted no-code database can replace the sheet-style view directly. Records for people, allocation percentages and weekly hours stay on your servers, and you define the formulas and views. The trade-off is that you design and maintain the data model, the rollups and the access rules yourself, which adds build and upkeep effort. Ask any implementation partner to scope the schema, permissions and reporting in writing before work begins.
Which capacity planning setup fits your team
This situation is illustrative. A PMO lead uses Smartsheet portfolio sheets to see which people are allocated across many projects and where they are overcommitted. Portfolio and resource management sit in OpenProject's paid Enterprise plans, so this path implies an Enterprise on-premises subscription, which is priced per named user. Confirm current tiers and terms on the OpenProject pricing page before you size the license.
- Edition: Enterprise on-premises, so the named user count drives the license line.
- Rebuild by hand: cross-sheet rollups, portfolio summary sheets and executive dashboards, because Smartsheet backups do not carry these over.
- Confirm in a trial: whether the resource view shows allocation across every project in the portfolio at the level your PMO reports.
- Confirm in a trial: how project-level permissions limit what a PMO viewer sees about individual people.
- Confirm in a trial: whether directory groups can be synchronized so reporting access follows your existing org structure.
Before you migrate the full portfolio, check that the people views match your PMO's reporting cadence.
This situation is illustrative. A delivery team plans its own work in a single Smartsheet sheet, assigns tasks to members and tracks hours in a column or a separate timesheet tab. OpenProject's work packages carry assignments, dates and time entries, so this team may be able to work from the Community edition, which is free and includes work packages, Gantt charts, agile boards, time tracking and dashboards, with community support. Plan for an Enterprise upgrade only if your identity rules require single sign-on or directory group synchronization.
- Edition: Community may be enough for assignments and hours, with Enterprise added for single sign-on or directory sync.
- Rebuild by hand: weekly hour columns and personal timesheet tabs, which become time entries on work packages.
- Confirm in a trial: how the team planner shows each member's assigned work packages across a sprint or a fortnight.
- Confirm in a trial: whether time entries can be logged against the right work packages with the fields your team uses.
- Confirm in a trial: whether the team's view of its own load is clear enough to replace the Smartsheet sheet without a separate report.
Run the trial with one real sprint's worth of assignments and hours, then compare the totals with the Smartsheet sheet.
This situation is illustrative. A planner keeps capacity in Smartsheet through formulas that convert estimates into hours per person, cross-sheet references that pull totals from several sheets, and reports that summarize the result. Smartsheet's backup covers Excel files with comments and attachments, but excludes reports, dashboards, formulas, workflows, cross-sheet references and formatting, so every calculation must be rebuilt. Review the backup file contents to see exactly what leaves the platform.
- Rebuild by hand: each capacity formula becomes a custom field, a report or a calculation kept in a spreadsheet outside OpenProject.
- Rebuild by hand: each cross-sheet reference becomes a shared project or a filtered view, since the link does not transfer.
- Confirm in a trial: whether the custom field types can hold the values your formulas produce, such as hours per week or percentage allocation.
- Confirm in a trial: whether a CSV or API export contains every column the planner needs for the calculations that remain outside the tool.
- Confirm in a trial: whether reports can group work by person and period in the way your current rollups do.
Document every formula before you export, so you can check each rebuilt result against the original figures.
Keeping the rest of the suite running alongside OpenProject
Moving resource planning does not have to happen all at once. The four points below cover how OpenProject can sit next to Smartsheet, your directory, your file storage and your finance and HR systems during a staged move. Each one depends on your own environment, so confirm the details with your team before you commit to a design.
Running Smartsheet during a staged move
Teams that are not yet ready to move can keep their sheets in Smartsheet while OpenProject takes over resource planning for the teams that have moved. Decide early which system owns each person's allocation, because two planners holding different numbers for the same engineer is the most common source of conflicting capacity figures. Agree on a cutover date per team and a single source for shared people records. Ask your Smartsheet administrator which exports and integrations depend on the sheets you are moving.
Aligning logins with SSO and LDAP sync
OpenProject lists single sign-on (SAML, OIDC, CAS, Kerberos, Okta) and LDAP group synchronization among its Enterprise features, so access to resource views can follow the groups your directory already maintains. Confirm which identity provider you use, how group membership maps to OpenProject roles, and whether leavers are removed from the directory and therefore lose access. Test with a small group before you rely on the mapping for capacity data.
Connecting file work to Nextcloud
OpenProject documents an integration with Nextcloud, which lets project teams work with files stored in Nextcloud alongside work packages. This keeps deliverables, specifications and project documents in the same self-hosted environment as the plan that references them. Check which Nextcloud version and file permissions your teams use, and confirm that folder access matches the project membership in OpenProject so people do not see files they should not.
Keeping finance and HR as the record
Pay rates, invoices, payroll and leave balances usually belong in your finance or HR system, not in a planning tool. OpenProject can hold time entries and budgets for project reporting, but treat those figures as planning inputs and reconcile them with the system of record each period. Ask finance and HR which fields they need, who approves changes, and how often the two sides are compared. Any sync that moves pay or invoicing data should be designed and tested with those owners, since the connectors depend on the systems you run.
Moving assignments, hours and capacity data out of Smartsheet
This sequence moves people, dates, assignments and logged hours from Smartsheet sheets into OpenProject work packages and resource views, with each total checked against the source before the Smartsheet copies are retired.
Export and inventory the Smartsheet backup
Start by downloading the account backup, which on Business and Enterprise plans arrives as a zip of Excel files with comments and attachments. Then inventory what the backup leaves out: reports, dashboards, formulas, workflows, cross-sheet references and formatting. The people who build capacity views in Smartsheet should list every report and formula they rely on, because those must be rebuilt by hand. The step is complete when each sheet has an owner and every missing element has a line in a written inventory. Confirm current backup availability and file contents with Smartsheet before you rely on them.
Map users, roles and groups
Match every Smartsheet collaborator to an OpenProject user, then assign roles that reflect who may view, edit or plan each project. Capacity data usually depends on a shared resource list, so decide whether that list becomes a group, a set of users or a custom field. Single sign-on and LDAP group synchronization are Enterprise features on OpenProject's pricing page, so confirm before the mapping whether your organization needs them. The step closes when a sign-off sheet lists each person, their OpenProject role and the data owner who approved it.
Rebuild the project and work package structure
Recreate each Smartsheet program or sheet as an OpenProject project with a parent-child hierarchy of work packages. Section headers, parent rows and dependency lines in the sheet map to parent work packages, child items and relations. Decide early which sheets stay separate projects and which become subprojects, since that choice drives how resource planning reads across teams. The output is a hierarchy that a data owner has reviewed against the original sheet, with the mapping recorded for each row.
Load assignments, dates and effort
Import or enter start dates, due dates, assignees and planned effort into the rebuilt work packages. Where volumes are large, a scripted import from the exported Excel files is typically faster than manual entry, and the migration team should confirm which import route fits the data. Capacity plans rely on consistent effort units, so convert each Smartsheet column to one unit before loading. The step ends when a test subset of rows matches the source line for line, including assignee, dates and effort.
Reconcile time entries and budgets
Move logged hours and budget figures into OpenProject's time tracking and budget fields, then compare them with the Smartsheet totals. Time tracking is included in the OpenProject Community edition, so confirm whether budgets and any portfolio-level roll-ups need an Enterprise plan. Formulas that calculated totals in Smartsheet must be recreated as checks, not copied as values. The step is complete when each project's hours and budget totals match a signed reconciliation report prepared by the data owner.
Rebuild capacity views and reports
Recreate the spreadsheet-style capacity views the team uses to see who is overallocated. OpenProject's team planner and work package assignments cover many planning questions, but a grid that totals hours per person across projects may need reports or another tool. List each Smartsheet view in the inventory from the first step and mark it as native, reported or out of scope. The output is a short register of views with their owner and the check that proves each one matches the legacy figures.
Validate totals against the source sheets
Compare record counts, assignee counts, date ranges, effort sums and budget totals between Smartsheet and OpenProject for every migrated project. Differences are logged with a cause and a decision: fix, accept or defer. Your team's data owners sign off on each project, because they know which numbers are authoritative. The step is complete when every project has a validation record with no open differences that the owner has not accepted in writing.
Run in parallel and retire Smartsheet copies
Run both systems side by side for an agreed period, with planners updating OpenProject as the working record while Smartsheet stays read-only for reference. Track any mismatch found during the parallel run and fix it in the migrated data. Retire Smartsheet only after the data owners confirm in writing that OpenProject is the system of record, and keep a final backup of the Smartsheet files for your records. The migration is planned in writing within a fixed scope, and your team supplies the data owners and sign-off at each stage.
What does replacing Smartsheet resource management cost and take?
What are the cost components of moving resource planning to OpenProject?
The cost has five main parts: licensing, hosting, migration effort, rebuilt reports and administration with training. OpenProject Community is free to download and run, so its license cost is zero, but you pay for servers, storage, backups and the staff who operate them. OpenProject Enterprise on-premises is licensed per named user per month, so license cost scales with headcount and the tier you pick. Migration, report rebuilding and training are services or internal hours, and they vary with how many sheets and dependent reports you have.
- Licensing: Community (free) or Enterprise on-premises (per user)
- Hosting: servers or cloud capacity in your environment
- Migration, rebuilt reports, administration and training: services or internal time
Which OpenProject Enterprise prices and minimum user counts should I budget against?
OpenProject publishes Enterprise on-premises prices per named user per month: Basic at 5.95 euros and Professional at 10.95 euros, with a 25-user minimum for Professional, Premium at 15.95 euros with a 100-user minimum, and Corporate on request for 250 or more users. Multiply these rates by your named users and 12 months to estimate annual licensing, then confirm the current figures and which tier includes portfolio and resource management with OpenProject, since tier features and pricing can change. Note that the minimum user counts apply even if your active planning group is smaller.
Is the license cost one-time or recurring?
Enterprise licensing is recurring, because it is billed per named user per month. Community has no license fee, but hosting, backups, patching and administration recur on your side. Migration, report rebuilding, configuration and training are usually one-time costs, although you will also pay for ongoing administration after go-live. Ask any provider to split the quote into one-time and recurring lines so you can compare the first year with later years.
How do Smartsheet formulas and capacity reports change the effort?
Formulas, reports, dashboards and cross-sheet references are the largest source of unpredictable effort, because Smartsheet's backup does not include them. Each capacity sheet that sums hours by person, flags overallocation or feeds a dashboard has to be rebuilt in OpenProject using work packages, time tracking and its reporting features, or moved to a separate reporting tool. Simple grids move quickly, while a web of linked sheets takes longer to map and verify. Inventory these items before requesting a quote, and identify which capacity views must match Smartsheet exactly and which can be simplified.
Can our team migrate Smartsheet resource data without outside help?
A capable internal team can migrate simple plans itself, especially if the data set is small and the required capacity views are basic. Export Smartsheet's backup, which contains Excel files with comments and attachments on Business and Enterprise plans, then map rows, assignees, dates and dependencies into OpenProject work packages and test the results. Teams with many linked sheets, custom reporting needs, SSO or directory integration, or a compliance deadline often choose outside help. Compare the internal hours required against a fixed-scope quote from DeployOpen, which plans, implements and documents the work inside your infrastructure.
What do we need to provide during the migration and rollout?
Plan for named data owners who can confirm which projects, people and capacity figures are authoritative, plus an administrator who can provision servers and access. If you use SSO, LDAP group synchronization or SCIM provisioning, you also need directory access and a sponsor who can approve identity configuration. Expect sign-off from a project sponsor on the rebuilt views, and a test window where planners compare OpenProject output with the Smartsheet export. Decide early who approves cutover and who keeps read access to the historical backup.
How do I ask for a fixed-scope quote for this migration?
Send a written inventory of the Smartsheet sheets, reports, dashboards, automations and users in scope, along with the OpenProject edition you plan to run and the expected named user count. Ask DeployOpen to state the deliverables, exclusions, acceptance criteria, timeline and assumptions in writing before work starts. Request separate line items for hosting setup, migration, rebuilt reports, testing, documentation, training and post-go-live support, so you can see which items are one-time and which are retainers. Confirm current OpenProject tier pricing directly with OpenProject before you finalize licensing.
Where the cost of a self-hosted resource planner sits
The software license is the smallest and most predictable part of the bill for a capacity-planning team. OpenProject's Community edition is free and includes work packages, Gantt charts and time tracking, but the resource management and portfolio features that capacity planning usually depends on sit in paid Enterprise plans. Enterprise on-premises is priced per named user per month, so the license cost recurs and grows with every planner, approver and resource manager who needs access. Before you compare numbers, confirm with OpenProject which features your planners need, because the gap between Community and Enterprise is where most of the recurring cost comes from.
Infrastructure is the second component and it is largely one-time setup plus ongoing hosting. OpenProject's sizing guide suggests 4 cores and 4 GB RAM for up to 200 users, 8 cores and 8 GB for about 500 users, and 16 cores and 16 GB for about 1,500 users. Packaged installs support Ubuntu 22.04, Debian 12, CentOS or RHEL 9.x and SUSE Linux Enterprise Server 15, and the database must be PostgreSQL 16 or later with the pg_trgm, btree_gist and unaccent extensions. Your own cloud or data center rates set the recurring hosting cost, and the operating system and database support windows set how often you must upgrade. Ask your implementation partner to price staging and backup environments as well as production.
Migration and rebuilt reporting are the costs most often underestimated. Smartsheet's backup exports Excel files but excludes reports, dashboards, formulas and cross-sheet references, so capacity views built on those must be rebuilt in OpenProject or in a reporting tool. That work is one-time and scales with the number of sheets and reports. Administration and training recur: someone must manage user provisioning, Enterprise single sign-on and LDAP group synchronization, apply upgrades and train planners on work package assignments. Ask any quote to separate one-time migration and rebuild effort from recurring support, hosting and license fees, to name who pays for each, and to state which Enterprise tier and user count it assumes.
How DeployOpen scopes and delivers a resource management move
DeployOpen plans, implements and hardens self-hosted OpenProject inside your own infrastructure, so people, capacity and time data stay under your control. Engagements are fixed-scope, with deliverables and timelines agreed in writing before work starts.
How we scope
- Inventory which Smartsheet sheets, reports and capacity views actually drive staffing decisions today.
- Map each resource view to OpenProject work packages, the team planner, or a reporting tool you confirm.
- Agree in writing which Enterprise features, such as SSO, LDAP group sync or resource management, are in or out.
How we build
- Deploy OpenProject with Docker or packaged installs on your chosen Linux hosts and PostgreSQL 16 or later.
- Configure users, groups, roles, custom fields, time tracking and budgets to match your planning model.
- Test capacity views, permissions and time entries against a sample of real planning data before cutover.
How we hand over
- Document the configuration, admin procedures, backup and upgrade steps in a handover pack you keep.
- Walk your administrators and planners through the team planner and how work package assignments are maintained.
- Record which Smartsheet formulas, dashboards and reports were rebuilt, replaced or retired, with the reasons.
How we support
- Ongoing support, upgrades and continuous testing are available as a retainer after handover.
- Plan upgrades against the OpenProject release notes and test them in a staging copy first.
- Confirm with us in the written scope who owns backups, monitoring and access reviews after go-live.